  1. Slide 1: Established, Profitable Australian Mining Company

    Established, Profitable Australian Mining Company Mines & Money Online Connect 19-21 October 2021 Patrick Mutz Managing Director Image Resources NL ASX: IMA 1

  2. Slide 2: High Level Summary

    High Level Summary ASX Code IMA Share Price A$0.17 (27 Sep 2021) Market Cap A$169 million Cash on hand A$50 million (30 Sep 2021) Debt A$0 (effective Feb 2021) Dividend (inaugural) A0.02/share (paid April 2021) Revenue Net Profit After Tax CY2019 A$146m A$20.8m Revenue Net Profit After Tax CY2020 A$

  3. Slide 3: Transition to Mining

    Transition to Mining  Image Resources is one of Australia’s newest mining companies  Boonanarring Mineral Sands Project located 80km north of Perth  Project construction 2018 (on-time and on-budget)  1st production Dec 2018  Product(s): Heavy Mineral Concentrate (HMC) containing zircon, rutile

  4. Slide 4: Keys to success

    Keys to success  Location – mine located only 1 hour north of capital city of Perth in Western Australia  High Grade – One of the highest grade projects of its kind in Australia Zircon Grade TiO2 Minerals Grade 2.4% >5% • Typical grades might be 0.3-0.4% zircon and 2.5% titanium dioxide minerals 

  5. Slide 5: Keys to success (continued)

    Keys to success (continued)  Simple Business Model • Shallow open cut mining (contracted) • Simple gravity separation • Simple concentrate product sold in bulk shipments  100% of production committed under life-of-mine off-take agreements at market pricing  Strong market prices  High demand for

  6. Slide 6: Focus on Growth and Sustainability

    Focus on Growth and Sustainability  Image has 12 zircon/titanium projects in its 100%-owed portfolio • All projects are located in Western Australia within an area of 1,000 square kilometres • All have identified Mineral Resources under the JORC Code and two have Ore Reserves • Only the first of th

  7. Slide 7: Growth Strategy

    Growth Strategy Growth strategy; 4 components  1 of 4: Continue to use existing capital equipment to operate profitably  Operations at Boonanarring will continue on existing Ore Reserves while the Atlas project is being developed  Following depletion of Ore Reserves at Boonanarring (Oct QTR 2022)

  8. Slide 8: Market Guidance

    Market Guidance 2020 2020 2021 Item Units Actual Guidance Guidance HMC Production kt 306 300-330 290-320 HMC Sales kt 311 300-330 300-320 Project Operating Costs A$m 90 100-110 90-100 C1 Cash Costs A$/t HMC sold 292 290-320 290-320 AISC Cash Costs A$/t HMC sold 337 340-370 340-370 HMC is Heavy Miner

  9. Slide 9: Growth Strategy (continued)

    Growth Strategy (continued) Growth strategy; 4 components  2 of 4: Look to develop a second mining centre to operate in parallel with existing operations  Front-running project is 100%-owned Bidaminna project • 102 million tonnes Mineral Resources at 2.2% HM (see footnote) • 95% VHM, <5% slimes, <

  10. Slide 10: Growth Strategy (continued)

    Growth Strategy (continued) Growth strategy; 4 components  3 of 4: Investigate opportunities to invest in zircon/titanium projects outside of the current portfolio that are development ready and have substantial mine life • Potential to partially self-fund investments • Access to low cost debt • Fi

  11. Slide 11: Growth Strategy (continued)

    Growth Strategy (continued) Growth strategy; 4 components  4 of 4: Investigate the potential for a profitable gold production centre on Image’s 100%-owned gold-focused tenements and adjoining current Farmin tenement • Farmin tenement has historic gold mineralisation and is surrounded by one of Imag

  12. Slide 12: Image Resources – Beyond Operations

    Image Resources – Beyond Operations Social Licence and Sustainability  Image looks forward to growing into a sustainable, mid-tier mining company  Areas of specific focus beyond day-to-day mining and processing operations include: • Health, safety and well being of employees, contractors, consulta

  13. Slide 13: Community Engagement Program

    Community Engagement Program  Image is proud of its active and varied community support and engagement program including significant local employment.  At 30 Sep 2020 53% of the site workforce lives locally to the operation or within regional shires.  Image Grand Opening was held on 19 September

  14. Slide 14: Solar Farm at Boonanarring

    Solar Farm at Boonanarring 2.3 MWAC solar farm  Construction and operation by Sunrise Energy Group Pty Ltd  Located on Image owned land adjacent to Boonanarring processing plant  Commissioned Sep 2020 and providing on average 25% of electricity requirements for mining and processing operations 

  15. Slide 15: Solar Farm at Boonanarring

    Solar Farm at Boonanarring Boonanarring WCP Brand Highway 15

  16. Slide 16: Rehabilitation Snapshot: Before Mining – April 2018

    Rehabilitation Snapshot: Before Mining – April 2018 16

  17. Slide 17: Rehabilitation Snapshot: During Mining – June 2019

    Rehabilitation Snapshot: During Mining – June 2019 17

  18. Slide 18: Rehabilitation Snapshot: Backfilled – December 2019

    Rehabilitation Snapshot: Backfilled – December 2019 18

  19. Slide 19: Rehabilitation Snapshot: 13 hectares re-vegetated – August 2020

    Rehabilitation Snapshot: 13 hectares re-vegetated – August 2020 19

  20. Slide 20: Carbon Sequestration Research

    Carbon Sequestration Research Australian Carbon Farming Initiative  As part of its focus to reduce its carbon footprint, Image is investigating cooperative work with local landowners near its mining operation under the Australian Carbon Farming Initiative  The goal is to support the work of local

  21. Slide 21: Why invest in Image Resources?

    Why invest in Image Resources? Summary  Proven profitable mining operator  Inaugural dividend paid in 2021; goal to continue annually  Multiple 100%-owned projects in portfolio for future production  Growth strategy includes:  Continue with current operations and look to grow profitability  Po

  22. Slide 22: For further information

    For further information Image Resources NL info@imageres.com.au Office: +61 8 9485 2410 Ground Floor, 23 Ventnor Avenue West Perth, WA 6005 PO Box 469, West Perth, WA 6872 www.imageres.com.au 22