Agl Energy Limited · ASX:AGL

Agl Energy — Corporate Update (July 2012)

8 slides from Agl Energy's corporate update, Jul 19, 2012

  1. Slide 1: Coopers Gap Community Consultative Committee (CGCCC)

    1 Coopers Gap Community Consultative Committee (CGCCC) Coopers Gap Wind Farm Project CGCCC Meeting 3 Facilitator: Barbara Campany 19 July 2012 Final

  2. Slide 2: Meeting agenda

    2 Meeting agenda › Welcome › Presentation by Rhys Brown, Noise Consultant, Aecom › Facilitated discussion of draft noise report › Other matters › Discussion of next meeting objectives › Next meeting and close › CGCCC Meeting › 19 July 2012 › External

  3. Slide 3: Welcome

    3 Welcome » Confirmation of meeting notes » Reiteration of Terms of Reference That participation in the CCC is voluntary Its main aims are to – Establish an effective and efficient communication process with the community and key stakeholders – Ensure issues are managed collaboratively – Function as

  4. Slide 4: Matters arising

    4 Matters arising › Process for CCC membership nomination. › CCC process » AGL would prefer to keep these meetings open. » Community members welcome to attend as observers of the CCC meeting. » An opportunity for observers to ask questions will be provided. › CGCCC Meeting › 19 July 2012 › External

  5. Slide 5: Introduction to Rhys Brown - Aecom

    5 Introduction to Rhys Brown - Aecom » Rhys Brown is a senior acoustic engineer and noise specialist from engineering firm Aecom. AECOM has undertaken the study and Rhys is the lead author of the noise and vibration chapter and draft updated acoustic report being discussed today. The study has been

  6. Slide 6: CCC Discussion

    6 CCC Discussion Q&As Gap Analysis › CGCCC Meeting › 19 July 2012 › External

  7. Slide 7: Other matters

    7 Other matters › Role of the facilitator » To facilitate the discussion between CCC members and the project team. » To guide the meeting in accordance with the agenda. » To ensure meetings are conducted in accordance with the Terms of Reference. » To ensure all CCC members have an equal voice. » To

  8. Slide 8: Next meeting objectives

    8 Next meeting objectives » Discussion of objectives and agenda for next meeting » Next meeting dates Thursday 16 August 2012 at 2 pm – Health Thursday 20 September 2012 at 2 pm – Property values and fire risks Thursday 18 October 2012 at 2 pm – Transport and construction impacts » Meeting close › C

AGL Energy — Corporate Update (July 2012) on 6ix