Ssr Mining Inc. · NASDAQ:SSRM
Ssr Mining — Prospectors & Developers Association of Canada (PDAC) Conference 2019
48 slides from Ssr Mining's conference presentation, Mar 5, 2019
Slide 1: A Track Record of Creating Value
A TRACK RECORD OF CREATING VALUE March 2019
Slide 2: Marigold Mine
Marigold Mine SSRM:NASDAQ/TSX PAGE 2
Slide 3: Cautionary Notes
Cautionary Notes Cautionary Note Regarding Forward-Looking Statements This presentation contains forward-looking information within the meaning of Canadian securities laws and forward-looking statements within the meaning of the U.S. Private Securities Litigation Reform Act of 1995 (collectively, “f
Slide 4: A Track Record of Creating Value
A Track Record of Creating Value ~400,000 oz AuEq 2019 gold equivalent production Achieved production guidance seven consecutive years Silver 20% 100% of Gold Production is North America- Gold based 80% $1.7B market cap Operating Mines Strong institutional shareholding with good daily trading liquid
Slide 5: Strategy for Mining Companies is Simple
Strategy for Mining Companies is Simple … Execution is the hard part Maximize the value of our existing assets ‘Operational Excellence’ is embedded in our organization and is non-negotiable Investment in brownfields exploration Portfolio rationalization to focus only on the assets that can a
Slide 6: Track Record of Growth and Decreasing Costs
Track Record of Growth and Decreasing Costs Near-term production growth to +440,000 AuEq by 2021 500 $1,200 $1,000 400 Cash Cost ($/oz Gold-Equivalent) Gold-Equivalent Production (k oz) $800 300 $600 200 $400 100 $200 0 $0 2012A 2013A 2014A 2015A 2016A 2017A 2018A 2019E 2020E 2021E Puna Marigold Sea
Slide 7: Track Record of Strong Financial Performance
Track Record of Strong Financial Performance Liquidity to support long-term growth profile Acquired Acquired $500 Marigold Seabee April 4, 2014 May 31, 2016 (all cash) (all shares) $400 Cash Balance ($M) $300 $200 $100 $0 Q1 2014 YE 2014 YE 2015 YE 2016 YE 2017 YE 2018 Ops Driven FCF Note: SSR Minin
Slide 8: Track Record of Value Creation through M+A
Track Record of Value Creation through M+A ‘OE’ and mine life extension have been key to our success Marigold Mine Seabee Gold Operation Exploration Exploration 1.6x 2.7x $778M $404M $254M $287M Acquisition Cost Realized Value Acquisition Cost Realized Value Increased production to +200,000 oz/yr
Slide 9: Track Record of Growing Net Asset Value Per Share
Track Record of Growing Net Asset Value Per Share $13 $12 +61% $11 Net Asset Value ($/sh) $10 $9 $8 +6% $7 $6 $5 $4 Dec-14 Jun-15 Dec-15 Jun-16 Dec-16 Jun-17 Dec-17 Jun-18 Dec-18 SSR Mining Peer Index Notes: Peer index represents an equal weighted index, indexed to SSR Mining NAV per share beginning
Slide 10: Track Record of Delivery
Track Record of Delivery Met or exceeded guidance for seven consecutive years Reliable trend of delivering more …at lower cash costs with less gold… variability 450 $1,200 400 $1,100 Gold-Equivalent Cash Costs ($/oz) Gold-Equivalent Production (k oz) $1,000 350 $900 300 $800 250 $700 200 $600 Produc
Slide 11: 2019 Production and Cash Costs Guidance
2019 Production and Cash Costs Guidance Marigold Seabee Puna SSR Mining (75% attributable interest) (75% attributable interest) Gold Gold Silver Gold Equivalent Production 200K – 220K oz 95K – 110K oz 6.0M – 7.0M oz 370K – 415K oz (4.5M – 5.3M oz) (350K – 395K oz) Cash Costs (US$/oz) $750/oz – $790/
Slide 12: Highest Corporate Governance Rating Leads Peer Group
Highest Corporate Governance Rating Leads Peer Group Depth of experience at senior management and Board level Market Data ISS Data Market Cap Shareholder Audit & Risk Company Name ($B) Quality Score Board Structure Compensation Rights Oversight SSR Mining Inc. $1.7 1 1 1 1 2 Kirkland Lake Gold Ltd.
Slide 13: Marigold Mine
MARIGOLD MINE GROWTH IN NEVADA
Slide 14: Marigold: Large Scale, Low-Cost Producer
Marigold: Large Scale, Low-Cost Producer Open pit, run-of-mine heap leach gold operation ~200,000 tonnes of material moved per day Strong safety and environmental practices Significant exploration upside Twin Creeks Goldstrike 10-year Mineral Reserves life with potential to extend MARIGOLD
Slide 15: Creating Value by Extending Mine Life
Creating Value by Extending Mine Life Mineral reserves replacement at $30/oz gold Production growth and improving … with reserve replacement at an cash costs … increased gold grade of 0.47g/t 300 6 0.40 266 266 5.56 $770 $800 $723 $745 Gold Mineral Reserves and Resources 250 5 225 Gold Production (k
Slide 16: Marigold: Exploration Success and Resource Conversion
Marigold: Exploration Success and Resource Conversion 8N TZN 8S 8SX N Red Dot North Mackay reserve Leach pit outline Pad Red Dot MUD Waste Valmy Current mining area Basalt-Antler SSRM:NASDAQ/TSX PAGE 16
Slide 17: Marigold: Exploration Success and Resource Conversion
Marigold: Exploration Success and Resource Conversion Red Dot Phase I added Mineral Reserves of 350,000oz of gold 8N TZN 8S 8SX N Red Dot North Mackay reserve Leach pit outline Pad Red Red Dot Dot EOY 2018 Pits surface EOY 2018 EOY 2018 EOY 2017 Original Surface W Resource Pit Reserve Pit Reserve Pi
Slide 18: Growth Options with Potential Resource Conversion
Growth Options with Potential Resource Conversion In 2019, evaluate mine fleet via equipment replacement study Red Dot Conversion Expansion YE 2018 R+R Material Movement Mtpa +110 +80 Life of Mine (active mining) years 10 - 15 10 - 15 Resource Conversion yes/no Yes Yes Gold Production oz/yr Up to 30
Slide 19: Marigold: Opportunities
Marigold: Opportunities Continue to deliver production growth and robust operating margins Additional hauling capacity and equipment replacement study Mine-life extension through exploration at Mackay, Valmy, Basalt and Red Dot 2019 exploration budget of $7.5M Deep sulphide exploration SSR
Slide 20: Seabee Gold Operation
SEABEE GOLD OPERATION HIGH-GRADE GOLD MINE
Slide 21: Seabee: Overview
Seabee: Overview High-margin underground operation in a stable jurisdiction High-grade, underground mine in Saskatchewan, Canada Strong safety and environmental practices Large underexplored land position of +57,000 ha Track-record of Mineral Resources conversion and growth 2019 production
Slide 22: Seabee Mineral Reserves and Resources Increased Y-o-Y
Seabee Mineral Reserves and Resources Increased Y-o-Y Mineral Reserves gold grade is 9.2 g/t 1,400 483 1,200 Gold Mineral Reserves and Resources 1,000 856 (thousand ounces) 800 283 608 600 437 (103) 400 (9) 200 0 2017 Depletion Model Exploration 2018 2018 M+I 2018 Reserves Assumptions Reserves Resou
Slide 23: Fifth Consecutive Annual Production Record in 2018
Fifth Consecutive Annual Production Record in 2018 Low cash costs of ~$500/oz gold 140 $1,200 Acquired 120 120 the Seabee Gold Operation May 31, 2016 $1,000 108 $998 103 $954 100 96 $800 Cash Costs ($/oz gold) 84 77 Gold Production (k oz) 80 $757 75 $663 $600 63 $602 60 $525 $540 50 $505 $504 45 $44
Slide 24: Operational Excellence Driving Seabee Mill Improvements
Operational Excellence Driving Seabee Mill Improvements Higher 2019 milling rates driven by increased UG mine capacity 1,500 Single day mill throughput record 1,400 of 1,442 tpd 1,300 Mill Mill test trial test trial 1,200 1,100 Mill Dry Tonnes per Day 1,000 Forest 900 fires 800 700 600 500 Decreased
Slide 25: Increased Mine Capacity Targeted for 2019
Increased Mine Capacity Targeted for 2019 UG mining and ore transport equipment awaiting ice road delivery 6-cubic yard LHD machine 45-tonne articulated dump truck SSRM:NASDAQ/TSX PAGE 25
Slide 26: Seabee: Exploration Extends Reserves Near Infrastructure
Seabee: Exploration Extends Reserves Near Infrastructure Track record of resource conversion and discovery Santoy Gap (9A, 9B, 9C) Santoy 8A 0m Elev 4.1m at 27.4g/t (SUG-17-052) 4.8m at 12.3g/t (SUG-18-612) (HW) 10.7m at 3.7g/t (SUG-18-831) (HW) -500 m 4.1m at 25.6g/t Gold Grade (SUG-18-622) (HW) >2
Slide 27: Large, Contiguous Land Package
Large, Contiguous Land Package Testing +15km of sheer zone strike length 23,300 hectare land package at Seabee CRJ target Seabee Mine/mill Santoy 3 target airstrip & camp Santoy Mine Fisher exploration camp 34,000 hectare land package at Fisher Project (option agreement) 10 km All weather road Gold
Slide 28: Seabee: Opportunities
Seabee: Opportunities Deliver on PEA expansion case to 1,050 tpd Drive Operational Excellence initiatives Evaluate 1,200 tpd sustained mill throughput 2019 exploration budget of $6M Santoy Gap hanging wall Santoy 8A Seabee Gold Operation Fisher property Flin Flon Saskatoon Focused on
Slide 29: Puna Operations
PUNA OPERATIONS LARGE-SCALE SILVER PRODUCER
Slide 30: Puna Operations Joint Venture
Puna Operations Joint Venture Ramp-up in 2019 to steady-state silver production of +6Moz per year SSR Mining is the JV operator with a 75% interest JV includes Chinchillas, a silver-lead-zinc deposit, and the Pirquitas plant and facilities located 45 km away Declared commercial production Dece
Slide 31: Puna Ops: Delivering Silver Production Growth in 2019
Puna Ops: Delivering Silver Production Growth in 2019 Significant LOM base metals exposure from lead and zinc 2019 Guidance Medium Term Outlook Attributable Production: 8 $16 7.0 6.9 6.9 $14 Silver: 4.5M to 5.3M oz Silver-Equivalent Production (M oz) Cash Cost ($/oz Silver-Equivalent) 6 $12 Le
Slide 32: Advancing the Las Chispas High-Grade Ag-Au Deposit
Advancing the Las Chispas High-Grade Ag-Au Deposit SilverCrest Metals Inc. (TSXV - SIL) well funded to execute plan Inferred Mineral Resource of 4.3MT Las Chispas Project grading 3.7 g/t Au and 347.0 g/t Ag Sonora, Mexico DDH BA18-122: 9.3 meters grading 39.7 g/t Au and 3,361 g/t Ag Exploratio
Slide 33: SSR Mining: Investment Highlights
SSR Mining: Investment Highlights Delivering value and growth for our shareholders Production Growth: Increasing near-term gold production to +440,000 oz by 2021 at $615/oz cash costs Management Discipline: Top governance rating and a track record of disciplined M+A and capital allocation Financial
Slide 34: Value & Growth
Value & Growth SSRM:NASDAQ/TSX PAGE 34
Slide 35: Selected Financial Results for 2017 and 2018
Selected Financial Results for 2017 and 2018 Units 2018 2017 Gold Sales oz 290,294 286,279 Silver Sales Moz 3.8 6.0 Total Gold Equivalent Sales oz 335,267 364,538 Gold Equivalent Production oz 347,090 370,486 Revenue $M $420.7 $448.8 Income from Mine Operations $M $76.8 $113.3 Net (Loss) Income $M $
Slide 36: Leader in Productivity and Utilization
Leader in Productivity and Utilization Marigold rope shovel Marigold Rope Shovel Notes: Marigold 4100 XPC-AC Rope Shovel compared to information provided by Joy Global benchmark study for the period January 1, 2019 to February 1, 2019 with respect to rope shovel operating practices at certain precio
Slide 37: Marigold Mine: Heap Leach Process
Marigold Mine: Heap Leach Process Once ore is loaded on the heap leach pad … Average time to achieve primary recovery of +50% is 90 to 120 days Average time to achieve overall recovery of 73% is seven to nine months Most important factor to leach recovery time is loaded ore to ‘plastic’ dist
Slide 38: Aerial View of Marigold Mine
Aerial View of Marigold Mine SSRM:NASDAQ/TSX PAGE 38
Slide 39: Seabee: Preliminary Economic Assessment
Seabee: Preliminary Economic Assessment Expanded margins from higher throughput and grade Increases mining rate by 21% to 1,050 tpd by 2019, compared to 2016 Mines 62% of Inferred Mineral Resources Increases estimated LOM average gold production by 29% to 100,000 ounces per year (for the perio
Slide 40: Seabee: PEA Financial Summary and Sensitivity Analysis
Seabee: PEA Financial Summary and Sensitivity Analysis Cash Flows ($M) Pre-tax NPV (5%) Sensitivities ($M) Net Revenue $893.5 Gold Price ($/oz) Operating Costs $(346.0) $1,200 $1,300 $1,400 Royalties and Other $(28.5) 1.20:1 $289 $346 $403 Canadian Δ in Working Capital $10.3 Exchange 1.25:1 $307 $36
Slide 41: Chinchillas Project: Data Sheet (100% Basis)
Chinchillas Project: Data Sheet (100% Basis) Declared commercial production December 1, 2018 Mine life: 8 years N Total material mined: 66.6 M tonnes Strip ratio: 4.7 Processing rate: 4,000 tpd 6.1 Moz Silver Average annual 35.0 Mlb Lead production (8 years active mining): 12.3 Mlb Zinc 8.4 Moz Silv
Slide 42: Mineral Reserves (as of December 31, 2018)
Mineral Reserves (as of December 31, 2018) SSRM SSRM Location Tonnes Silver Gold Lead Zinc SSRM Interest Interest millions g/t g/t % % % Silver Gold Interest million oz million oz Proven Mineral Reserves Seabee Canada 0.33 9.00 100 0.09 Chinchillas Argentina 0.94 196 0.67 0.33 75 4.5 Total 4.5 0.09
Slide 43: Mineral Resources: Measured and Indicated
Mineral Resources: Measured and Indicated (as of December 31, 2018) SSRM SSRM Location Tonnes Silver Gold Lead Zinc SSRM Interest Interest millions g/t g/t % % % Silver Gold Interest million oz million oz Measured Mineral Resources (Inclusive of Proven Mineral Reserves) Seabee Canada 0.45 11.76 100
Slide 44: Mineral Resources: Inferred
Mineral Resources: Inferred (as of December 31, 2018) SSRM SSRM Location Tonnes Silver Gold Lead Zinc SSRM Interest Interest millions g/t g/t % % % Silver Gold Interest million oz million oz Inferred Mineral Resources Marigold U.S. 33.60 0.37 100 0.40 Seabee Canada 1.70 8.82 100 0.48 Chinchillas Arg
Slide 45: Reserves and Resources Notes to Tables
Reserves and Resources Notes to Tables All estimates set forth in the Mineral Reserves and Mineral Resources table have been prepared in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects (“NI 43-101”). The estimates of Mineral Reserves and Mineral Resources fo
Slide 46: SSR Mining Executive Team and Board of Directors
SSR Mining Executive Team and Board of Directors Depth of experience and a top governance rating Paul Benson Nadine J. Block W. John DeCooman, Jr. Gregory J. Martin Kevin O’Kane President and CEO SVP, Human Resources SVP, Business Development SVP and CFO SVP and COO and Strategy Michael Anglin Brian
Slide 47: SSR Mining Inc. Share Structure and Relative Performance
SSR Mining Inc. Share capital structure, convertible note and top shareholders overview Top 10 Shareholders % of Shares Outstanding Institutional Holdings by Country Van Eck 14.7% Dimensional Fund Advisors, L.P. 5.1% United States Renaissance Technologies 4.8% Canada Investec Asset Management 4.2% U
Slide 48: SSR Mining Inc. Contact
SSR Mining Inc. www.ssrmining.com Toll-free: +1 888.338.0046 Telephone: +1 604.689.3846 Email: invest@ssrmining.com
SSR Mining — Prospectors & Developers Association of Canada (PDAC) Conference 2019 on 6ix