Eramet SA · EURONEXT:ERA
Eramet SA — Investor Presentation (March 2023)
14 slides from Eramet SA's investor presentation, March 2023

Slide 1: Eramet in Argentina: Centenario-Ratones Lithium Project
Eramet in Argentina Centenario-Ratones Lithium Project March 2023

Slide 2: Disclaimer
Disclaimer Certain information contained in this presentation including any information on Eramet’s plans or future financial or operating performance and any other statements that express management’s expectations or estimates of future performance, constitute forward- looking statements. Such stat

Slide 3: A momentum of mega boost for lithium demand with a long-term consensus price close to $18k/t LCE
A momentum of mega boost for lithium demand with a 3 long-term consensus price close to $18k/t LCE Half of the cars sold globally in 2030 Forecasted lithium market demand4 (in kt LCE3) should be fully or partially electric1… 3 000 Lithium demand – Update February 2023 Lithium demand – Previous updat

Slide 4: Centenario: a world-class asset on track to start production early 2024
Centenario: a world-class asset on track to start production 3 early 2024 Centenario-Ratones Tier 1 lithium project Plant construction in progress 50.1% 49.9% Mid-2025 Full ramp-up at 24kt/y (phase 1) Q1 2024 Plant commissioning Life-of-Mine of 40 years1 By year-end 2023 Expected FID for Phase 2 Res

Slide 5: Top-notch sustainability standards
3 Top-notch sustainability standards 1 2 3 Building long-lasting and Producing metals that constructive relationships Operating responsibly the world needs with local stakeholders Solid local content: Robust environmental employment (c. 95% of programme Meeting the needs of global workforce) and sou

Slide 6: Developed in-house, Eramet's Direct Lithium Extraction technology combines strong competitiveness…
Developed in-house, Eramet’s Direct Lithium Extraction 3 technology combines strong competitiveness… Direct lithium Extraction (DLE) Proven industrial process over the past 20-years (aluminum-based lithium sorbent) Proprietary lithium sorbent working at native temperature of the brine (20°C) 90%1 li

Slide 7: … as well as high sustainability standards
3 … as well as high sustainability standards Water recycling Regeneration of the lithium sorbent only by water (DLE based on titanium or manganese sorbents use acid) and at 20°C Water recycling by reverse osmosis & forced evaporation 60% process water recycling rate Efficient purification High selec

Slide 8: Full production process tested on site in real conditions over the past 3 years
Full production process tested on site in real 3 conditions over the past 3 years Eramine Training Center: Pilot Plant at 3,900 meters above sea, on the Andean highlands – startup in December 2019 Highly trained Full process tested on site, from brine pumping to battery grade Li2CO3 team and solid p

Slide 9: All conditions are met to achieve a short-term ramp up at full capacity
All conditions are met to achieve a short-term ramp up 3 at full capacity Training Center Full process validated Equipment testing Team training Expected quick time-to-market Battery Grade quality Project Team Equipment providers Expert team with solid track- Recognized expertise record in Lithium i

Slide 10: Centenario (phase 1): key metrics of a Tier 1 project
3 Centenario (phase 1): key metrics of a Tier 1 project Key financial metrics – Phase 1 Key operational metrics – Phase 1 c.$300m At full ramp-up1 24,000 Yearly production EBITDA Based on a $17,800/t LCE Tons of LCE4 at full ramp-up at 100% LT consensus CIF price Eq. 500k vehicles Initial Additional

Slide 11: Centenario (phase 2): progressively unlocking the great potential of a Tier 1 deposit
Centenario (phase 2): progressively unlocking 3 the great potential of a Tier 1 deposit FID expected Feasibility by 2023 study ongoing year-end Phase 2 c.50kt/yr Expansion under study LCE1 Total Centenario c.75kt/yr annual production capacity LCE1 Phase 1 + 2 11 Centenario-Ratones Lithium Project 1

Slide 12: Appendices
Appendices

Slide 13: Lithium project in Alsace: partnering with Électricité de Strasbourg to sustainably develop lithium in Alsace
Lithium project in Alsace: partnering with Électricité de 3 Strasbourg to sustainably develop lithium in Alsace Equivalent to PFS End-of-decade c.10kt/year 15-20%2 starting Expected start of LCE1 production of French needs in 3 production Li Two geothermal power plants Partnership with Électricité d

Slide 14: Contacts
CONTACTS Director of Investor Relations Sandrine NOURRY-DABI sandrine.nourrydabi@eramet.com
Source: Internet Archive copy of eramet.com
More decks from Eramet SA
H1 2026 Earnings Presentation59 slides · Jul 30, 2026
Shareholder Meeting (May 2026)28 slides · May 27, 2026
BofA M&M conference, May 11-13, 202650 slides · May 7, 2026
Investor Presentation (May 2026)54 slides · May 2026
Non-Deal Roadshow (March 2026)53 slides · Mar 27, 2026
FY 2025 Earnings Presentation57 slides · Feb 19, 2026