Stelco — U. S. Steel Canada — Corporate Update (December 2015)
12 slides from Stelco's corporate update, Dec 16, 2015
Slide 1: Lake Erie Works Community Liaison Committee
U. S. Steel Canada Inc. Lake Erie Works Community Liaison Committee December 16 2015 John Benson © 2015 U. S. Steel Canada Inc.
Slide 2: Community Liaison Committee Meeting Agenda
Community Liaison Committee Meeting Agenda 1. Introduction. 2. What are Coke Oven Emissions? 3. How has LEW done under the new rules of Reg. 419 (Site Specific Standard Order – Particulates)? 4. What new regulations are coming? 5. What are the concerns and issues? 6. Adjournment U. S. Steel Canada I
Slide 3: U. S. Steel Canada Inc.
U. S. Steel Canada Inc. 3
Slide 4: 4
4
Slide 5: Coke Oven Emission Sources
Charge Lid Emissions (SCC 3-03-003-14) Quench Tower A 1 1 : \ Door Emissions (SCC 3-03-003-08) Pushing Emissions (SCC 3-03-003-03) Standpipe Caps (SCC 3-03-003-14) Charging Emissions (SCC 3-03-003-02) 4 z é ¥ ¥ Coal Conveyor iy e; Larry Car Coal Bunker Combustion (Underfire) Stack Coke Wharf Coke Gu
Slide 6: Summary of Order Requirements for Leaks, Charging and Pushing
Summary of Order Requirements for Leaks and Charging • Weekday counts using US EPA Method 303 + some weekends • Do an Operational Adjustment (OA) if a daily limit is exceeded • Notify the MOECC of any OA’s in a 7 day period • Report to MOECC any exceedences of 30 day rolling limits Summary of Order
Slide 7: Daily Observations - Coke Battery
Community Liaison Committee Meeting Daily Observations - Coke Battery Report Card – Date Doors Lids Off-takes Leaks and Charges (% Leaks) (% Leaks) (% Leaks) 2015 Limits (July 2 start) 54% 2% NA 2016 Limits 32% 2% NA 2017-2019 Limits 10% 2% 5 2020 Limits 5% 1% 4 July 2 – Dec 1, 2015 Range 0 – 15.1%
Slide 8: 30-Day Rolling Averages - Coke Battery
Community Liaison Committee Meeting 30-Day Rolling Averages - Coke Battery Report Card – Date Doors Lids Off-takes Charging (sec) Leaks and Charges (% Leaks) (% Leaks) (% Leaks) (log avg) 2015 Limits (July 2 start) 38% 0.8% 25% 12 sec 2016 Limits 22.5% 0.8% 15% 12 sec 2017-2019 Limits 7% 0.8% 4.2% 1
Slide 9: Daily Observations - Pushing - Coke Battery
Community Liaison Committee Meeting Daily Observations – Pushing - Coke Battery Report Card – Date Pushing Emission (opacity %) Pushing 2015 Limit (July 2 start) ≥ 50% 2016 – 2018 ≥ 50% 2019 ≥ 40% 2020 ≥ 30% July 2 – Dec. 1, 2015 Range 0 – 49.2% Average 19.52% All required Pushing measurements were
Slide 10: New regulations coming to Lake Erie Works
Community Liaison Committee Meeting New regulations that are coming to Lake Erie Works - Site Specific Standards Benzo[a]Pyrene • controls are similar to the SSS - Particulates • B[a]P is attached to particulates • controlled by visible emission observations limits Benzene • expansion of the Leak De
Slide 11: Questions and Answers
Questions and Answers 11
Slide 12: Adjournment
Adjournment Thank You for taking time to be part of the Lake Erie Works Community Liaison Committee U. S. Steel Canada Inc. 12
U. S. Steel Canada — Corporate Update (December 2015) on 6ix