BPZ Resources Inc

BPZ Resources — EnerCom The Oil & Gas Conference 2013

23 slides from BPZ Resources's conference presentation, Aug 13, 2013

  1. Slide 1: BPZ Energy at EnerCom Oil & Gas Conference

    Slide 1: BPZ Energy at EnerCom Oil & Gas Conference

    ( 4; BPZ Energy Develping Enepy Prag Qppomrities ~_ ENERCOM The oil & Gas Conference® Denver, Colorado August 12, 2013

  2. Slide 2: Forward Looking Statements

    Slide 2: Forward Looking Statements

    Forward Looking Statements ‘Tris Presentation contain forward boing statarant within the meaning of he Privat Secu tigation Relor Act 995, section 27A ofthe Secu he of 1933 ad Section 226 ofthe ‘Secrtls Exchange Actof i834, These forward looing statements ae based on our catrntaxpetatlors about oUt

  3. Slide 3: BPZ Energy Today

    Slide 3: BPZ Energy Today

    ~ BPZ Energy Today ™ Leadership Team has Better Positioned Company to Grow ™ Four Blocks in Northwest Peru and one in Southwest Ecuador ™ Enhanced Operational, Technical, and Financial Resources ™ Block Z-1 Partnership with Pacific Rubiales to Facilitate Development ™ Net 2Q13 Production = 1,424 BOP

  4. Slide 4: Mission

    Slide 4: Mission

    Missi BPZEneray Explore, develop a e oil & gas in Peru and the Americas We will: ™ deliver profitable growth. ™ become a preferred partner of government and industry. ™ honor our commitments to safety, the environment and the communities in which we operate. ™ attract and retain top talent by valuin

  5. Slide 5: To Grow Production, Reserves and Cash Flow in Peru

    Slide 5: To Grow Production, Reserves and Cash Flow in Peru

    D 3 To Grow Production, Re: Completed Block Z-1 JV Transaction Completed Block Z-1 3D Seismic Survey Completed Corvina (X%-15 Buoyant Tower Repaid $75M Loan Refinanced $40M Loan Secured by Equipment serves and Cash Flow in Peru OIL & GAS ACTIONS Corvina Drilling Underway Back to Albacora in Septembe

  6. Slide 6: Drilling Underway at CX-15 Platform

    Slide 6: Drilling Underway at CX-15 Platform

  7. Slide 7: Top of Zorritos Formation Unconformity

    Slide 7: Top of Zorritos Formation Unconformity

    1 Top of Zorritos Formation Unconformity |

  8. Slide 8: New Albacora Data

    Slide 8: New Albacora Data

    New Albacora Data

  9. Slide 9: Block Z-1 Exploration Strategy

    Slide 9: Block Z-1 Exploration Strategy

    _ Block Z-1 Exploration Strategy Based on 1600 sq. km. of new 3D data BLOCK Z-1 OFFSHORE NW PERU 3D SEISMIC ACQUISITION i

  10. Slide 10: Maturing Z-1 Leads into Prospects

    Slide 10: Maturing Z-1 Leads into Prospects

    Maturing Z-1 Leads into Prospects WAGKHAAR ST ASHOTASA Dekencece es Diagonal 3D Seismic Line 1828 [55 miles long] Lead A Lead H Delfin Corvina Trend Albacora Confirmed presence of undrilled structures (with multiple targets) Indications of new leads/prospects on trend of previously drilled structure

  11. Slide 11: Turning Lead G into Raya Prospect

    Slide 11: Turning Lead G into Raya Prospect

    Turning Lead G into Raya Prospec NW Cross section based on 3D seismic “Barracuda —= “Raya a > - Confirmed presence of undrilled structures (with multiple targets) : ‘of new leads/prospects on trend of previously drilled = Raya (Lead G) mapped is larger than original expectations

  12. Slide 12: Raya Prospect, Corvina Analog

    Slide 12: Raya Prospect, Corvina Analog

    LET YA ») BPZ Energy fe ne Raya Prospect Corvina Analog

  13. Slide 13: Energy

    Slide 13: Energy

    Energy Large Anticline with previously drilled wells indicating presence of shallow hydrocarbons

  14. Slide 14: Area of Block XXIII

    Slide 14: Area of Block XXIII

    ea of Block XxXIll BPZ Ener @ Multiple structures with shallow oil potential in formations producing oil in Talara Basin New 2D Seismic Line BPZ1OXXIII-16 Seismic Line BPZ1OXXIII-16 — Major Fault — Eocene (Salinas) —= Small Faults — Eocene (Talara) — Eocene (Verdun)

  15. Slide 15: Block XXII in Lancones Basin

    Slide 15: Block XXII in Lancones Basin

    re Block XXII in Lancones Basin A am >) BPZ Energy D) ane nes ™ Structures on both sides of the depocenter ™ Thick section of Cretaceous Muerto formation source rock expected in depocenter BPZ10XXII-16 Tine s (ss) STRUCTURE

  16. Slide 16: Next Steps Onshore

    Slide 16: Next Steps Onshore

    Next Steps Onshore )\ BPZE Cy BPZ Energy ™ Block XXIII: begin drilling 3 shallow exploratory wells by year-end 2013. ™ Block XIX: working to obtain environmental permit for 3D seismic acquisition. ™ Block XXII: planning to shoot confirmation 2D seismic in late 2013 and working to obtain environmenta

  17. Slide 17: Short, Medium and Long Term Plans

    Slide 17: Short, Medium and Long Term Plans

    Short Term => 2013-14 Offshore Block 2-1 ®™ Corvina CX-15: Drilling underway ™ Albacora: Mid-Sept. 2013 spud Onshore Blocks ®™ Block XXIII: Shallow exploration drilling expected to begin late 2013 Medium Term =} 2014-15 Offshore Block Z-1 ™ Continue development drilling at Corvina and Albacora ® Dri

  18. Slide 18: Finance Action Plan

    Slide 18: Finance Action Plan

    ce Action Plan Improve G&A Cost Structure ® Initiatives for costs savings being implemented in both Lima and Houston Capital Discipline ™ Ensure robust economics ™ Spending within cash constraints Manage Cash ™ New production from CX-15 platform ™ Lower overall cost structure Optimize Balance Sheet

  19. Slide 19: Revised 2013 Capital & Exploratory Budget

    Slide 19: Revised 2013 Capital & Exploratory Budget

    Revised 2013 Capital & Exploratory Budget $ Millions Onshore Shallow drilling at Block XXIII $9 Contingent 2D seismic Blocks XXII * $5 Other $5 Total $19 Offshore Block Z-1 (fully carried by Pacific Rubiales) ** Corvina CX-15 development drilling (3 wells) $21 Albacora drilling (2 wells) $16 Project

  20. Slide 20: Activity Planned

    Slide 20: Activity Planned

    ctivity Planned... = Drill and produce from CX-15 and Albacora platforms © Existing Offshore 3-D Seismic || Existing Onshore 3-D Seismic = Apply new seismic data PP v & Existing Onshore 2D Seismic = Define Z-1 exploration campaign = Drill and develop Block Z-1 prospects = Explore onshore © Grow Prod

  21. Slide 21: Contact Information

    Slide 21: Contact Information

    Manolo Zufiga President & CEO For additional information: A. Pierre Dubois Corporate Investor Relations & Communications 580 Westlake Park Blvd., Suite 525, Houston, Texas 77079 (281) 556-6200; pierre_dubois@bpzenergy.com www.bpzenergy.com

  22. Slide 22: Summary Financial Data

    Slide 22: Summary Financial Data

    Summary Financial Dat (MM: $Millions) Six Months Ended June 30, 2013 Revenues $26.1MM Operating loss ($ 19.9 MM) C&E expenditures* ($ 1.5 MM) EBITDAX ($ 4.9 MM) Net production 1,457 bopd Realized price $98.5 per bbl At June 30, 2013 Cash & short term investments $104.8 MM Block Z-1 carry remaining $

  23. Slide 23: Appendix — GAAP Reconciliation

    Slide 23: Appendix — GAAP Reconciliation

    Appendix — GAAP Reco Reconciliation of non-GAAP measure ‘The table below represents a reconciliation of EBITDAX to the Company’s net loss, which is the most directly comparable financial measure calculated in accordance with generally accepted accounting principles in the United States of America, E

Source: SEC EDGAR · 8-K filed Aug 13, 2013

More decks from BPZ Resources Inc