Collective Mining Ltd · TSX:CNL

Collective Mining — Investor Presentation (January 2025)

28 slides from Collective Mining's investor presentation, January 2025

  1. Slide 1: A team with a proven track record has made another major discovery in Colombia

    A TEA M WITH A PROVE N TRAC K RE COR D O F SU C CE SS HA S MA DE ANOTHER MA JOR D ISC OVERY I N C OLOMBI A

  2. Slide 2: Disclaimer

    Disclaimer This presentation does not constitute an offering of securities and the information contained herein is subject to the information contained in the Company's continuous disclosure documents. All amounts expressed in Canadian $ unless otherwise stipulated. Forward-looking Statements This p

  3. Slide 3: The Collective Edge: Track Record of Creating Value

    Track Record of Creating Value The Collective Edge Well trusted, knowledgeable and successful management team in Colombia. Built the largest gold mine in Colombia Highly specialized talent in generating Sold for C$2 billion (in EV) March 2020 grassroot exploration targets has (550% return) resulted

  4. Slide 4: Capital Structure and Analyst Research

    Capital Structure and Analyst Research Analyst Research Coverage Common Shares Outstanding 77.6M Firm: BMO Capital Markets Analyst: Andrew Mikitchook Stock Options 3.4M Target price: C$8.25 Warrants (strike price is C$5.01) 2.2M Firm: Scotiabank Analyst: Ovais Habib Fully Diluted Shares Outstanding

  5. Slide 5: Board of Directors and Key Management

    Board of Directors Key Management Ari Sussman, Executive Chairman Omar Ossma Former CEO and director of Continental Gold, which was sold to Zijin CEO and President Mining for $2 billion. Raised over $1 billion for various mining related Former Vice President Legal for Continental Gold and recognized

  6. Slide 6: Colombia: A Well Established Mining Jurisdiction

    Colombia: A Well Established Mining Jurisdiction Cerro Matoso Cerrejón Project Company Commodity Stage Type Cerro Matoso South 32 Ni Production Open-pit El Descanso Cerrejón Glencore Coal Production Open-pit Buriticá San Antonio El Descanso Drummond Coal Production Open-pit Segovia El Santuario Paz

  7. Slide 7: Caldas the most desirable mining jurisdiction in Colombia

    500+ year mining history – Pro-mining area of Colombia Caldas the most desirable mining Industrial based economy with excellent infrastructure jurisdiction in High level of education Colombia Excellent security 7

  8. Slide 8: Operating in an Established Mining Camp Contiguous to a Multi-Million Ounce Mine

    Operating in an Established Mining Camp Located Contiguous to a Multi-Million Ounce Producing Mine Option to earn 100% interest in the Guayabales and San Antonio projects. Located next to Aris Mining’s multi-million-ounce Marmato project which is currently in construction. District never consolidate

  9. Slide 9: Guayabales: Seven Targets to be Drilled in 2025

    Guayabales: Seven Targets to be Drilled in 2025 10 permitted & operating mines in a 3km area within an established mining camp. Multiple discoveries made through reconnaissance drilling since 2022. 100,000+ meters of drilling completed. 9

  10. Slide 10: Guayabales: A Major Complex with Significant Dimensions

    Guayabales: A Major Complex with Significant Dimensions 10

  11. Slide 11: 2025 Plan: 60,000 Metre Drilling Program

    2025 Plan: 60,000 Metre Drilling Program Guayabales Project Targets 1 Apollo: Expand the new Ramp Zone and shallow high- grade Subzone discoveries 2 Trap: Expand the system to the northwest and vector toward the potential mineralized porphyry feeder source 3 X and Tower Targets: Reconnaissance drill

  12. Slide 12: Apollo: Large-Scale and Continuing to Expand

    Apollo: Large-Scale and Continuing to Expand (Discovery June 2022) Two Deposits at Different Elevations: • Shallow: Bulk tonnage Au-Ag-Cu- W Deposit • Deep: Partially Reduced Intrusion Related (PRIRS-Au-Ag-Cu) Expansion drilling underway with three rigs 66,076 metres of drilling completed (146 holes

  13. Slide 13: Apollo System Section: High-Grade Continuity from Surface

    Apollo System Section: High-Grade Continuity from Surface 13

  14. Slide 14: Deep Drilling Aligns with Potential Future Development

    Deep Drilling Aligns with Potential Future Development New High-Grade Partially Reduced Intrusion Related System (PRIRS) Au-Ag-Cu Discovery at Apollo 14

  15. Slide 15: Partially Reduced Intrusion Related System Model: Long Section

    Partially Reduced Intrusion Related System Model: Long Section **Please refer to disclaimer slide #2 for cautionary statement. 15

  16. Slide 16: Trap System: Second Major Discovery Made in 2024

    Trap System: Second Major Discovery Made in2024 Trap Target Two rigs stepping out along strike to the SE. Porphyry unit overprinted by high-grade sheeted CBM veins. 1.4 kilometers of strike and open for further expansion. 16

  17. Slide 17: Sustainability: The Collective Model – Dialogue Platform

    Sustainability: The Collective Model – Dialogue Platform Multi-stakeholder platform focused on energy efficiency, conservation, social, economic and infrastructure development. Key achievements to date: Energy transition as one of the articulating axes of the process. 27/33 signatories to the volunt

  18. Slide 18: Sustainability Best Practices

    Sustainability Best Practices Partnerships to Strengthen 2023 a Year of Success University of Caldas Alliance Our Communities Strategic alliance with the A total of $600,000 was invested, Jointly implementing academic Coffee Growers Committee of through our alliances, benefitting and research projec

  19. Slide 19: Upcoming Catalysts: 2025 Drill Program Underway

    Upcoming Catalysts: 2025 Drill Program Underway Project Target Outcome Status Guayabales Apollo Discovery June 2022 Drilling underway Trap Discovery January 2024 Drilling underway X Undrilled Drilling in Q1 2025 Tower Undrilled Drilling in Q2 2025 Box Discovery August 2024 Phase II drilling in plann

  20. Slide 20: Appendix

    Appendix D ISCO V ERIN G C O LOM BIA’S N E XT WO RLD - C LA SS M INE RA L DE PO SIT

  21. Slide 21: Outstanding Payments to Acquire Project Portfolio

    Outstanding Payments to Acquire Project Portfolio Option to acquire 100% interest in both projects with no underlying private royalties Guayabales Project San Antonio Project Year Amount (US$) Year Amount (US$) 2025 666,000 2025 420,000 2026 666,000 2026 750,000 2027 666,000 2027 750,000 2028 666,00

  22. Slide 22: Apollo System: Select Drill Results

    Apollo System: Select Drill Results 22

  23. Slide 23: Apollo: Outcropping in High-Grade Oxide Mineralization

    Apollo: Outcropping in High-Grade Oxide Mineralization High-Grade Au-Ag-Cu-Wo3 System 23

  24. Slide 24: Apollo Model: Remarkable Mineral Endowment (Cross Section)

    Apollo Model: Remarkable Mineral Endowment (Cross Section) 24

  25. Slide 25: Plutus Target: Deep Drilling Planned

    Plutus Target: Deep Drilling Planned Plutus Porphyry Center South: Large coincidental copper & molybdenum in-soil anomaly lying above a magnetic high. Located approximately 1.5 km north of the Marmato mine. North: Breccia discovery (2023) • 136.45m @ 1.31 g/t AuEq Reconnaissance drill program on sou

  26. Slide 26: Guayabales Project: Targeting a Multi-Million Ounce Gold Camp

    Guayabales Project: Targeting a Multi-Million Ounce Gold Camp Our Exploration Strategy Target name Apollo, Trap Plutus North, ME X, Tower, Plutus South, Box, Victory Baco, Crono, The Knife Amagá 26

  27. Slide 27: San Antonio Project: Outcropping mineralized breccia and porphyry systems

    San Antonio Project Outcropping mineralized breccia and porphyry systems 4,300 metre drill program completed. Significant discovery made at Pound target. - Porphyry related breccia and polymetallic veins. Lone historical Upper levels of porphyry deposit found through drilling drill hole 99m @ at the

  28. Slide 28: San Antonio Project: Pound Target - Significant Discovery Made

    San Antonio Project: Pound Target - Significant Discovery Made Hydrothermal breccia target with 1.3km of strike length and open in all directions Two diamond drill holes, which bottomed in mineralization tested the target in 2021 with results as follows: 710m @ 0.53 g/t AuEq from surface 750m @ 0.41

Collective Mining — Investor Presentation (January 2025) on 6ix