Slide 1: Investor Presentation
ANNOUNCEMENT TO THE AUSTRALIAN STOCK EXCHANGE 25 NOVEMBER 2024 Investor Presentation Auric Mining Limited (ASX: AWJ) (Auric or the Company) is pleased to provide the attached presentation slides for the Investor Presentation scheduled across the Eastern States, which will be delivered by our Managin
Slide 2: We’re on a quest to find and mine one million ounces of gold
INVESTOR ROADSHOW We’re on a quest to find and mine one million ounces of gold. 25 November 2024
Slide 3: Forward Looking Statements
Forward Looking Statements This presentation does not include all available Information on Auric Mining Limited and should not be used in isolation as a guide to investing in the Company. Any potential investor should also refer to Auric Mining Limited’s Annual Reports and take independent professio
Slide 4: We’ve been a remarkable gold story
Milestones Aug 2019 Incorporated Acquisition of Jeffreys Find from Mincor Sep 2020 Acquisition of Munda from Estrella Resources Feb 2021 Listed on the ASX Aug 2022 Executed mining agreement with BML Ventures May 2023 Commence Stage One mining at Jeffreys Find We’ve been a Dec 2023 Auric banks $4.76
Slide 5: Right People
Right People A team with a track record of successful gold discovery, development and production, that has grown Auric into a highly profitable gold producer. Steven Morris Mark English John Utley Non-Executive Chairman Managing Director Technical Director Steven has over 25 years’ experience in fin
Slide 6: Right Structure
Right Structure At 21 November 2024 148.6 million 1,062 Shares on issue Number of shareholders Shareholders 49.89% on grouped 50.11% basis 9.35 million 50.11% Unlisted Options on issue Top 20 shareholders Directors 16% $41.6 million $3.5 million Top 20 - including Directors Market Cap Cash at Bank/D
Slide 7: Right Place
Right Place Auric Mining Projects • Auric’s tenements are between Kalgoorlie and Norseman in the heart of The Brisbane Goldfields of Western Australia, a world Kalgoorlie class address. Perth Sydney • Excellent infrastructure and support services in the region for gold mining. Melbourne • Outstandin
Slide 8: The Jeffreys Find Gold Mine
The Jeffreys Find Gold Mine Stage Two: 2024 year to date¹ • Auric total cash cost on acquisition, development and all associated costs to Item Total Stage Two date is approximately $1.4 million. Gold Sold 7,551 ounces Gold Sales to Date A$27.95 million • Auric splits all surplus cash with BML Ventur
Slide 9: Jeffreys Find Pit: Photo 17 November 2024
Jeffreys Find Pit: Photo 17 November 2024
Slide 10: All roads lead to Munda.
All roads lead to Munda. • Flagship asset. Acquired September 2020. • Total cash spent by Auric since acquisition to date is approximately $7.3 million. . • Starter Pit scheduled to start mining Q1 2025.
Slide 11: Numerous High Grade Intersections highlight the enormous potential at the Munda Gold Deposit
Numerous High Grade Intersections highlight the enormous potential at the Munda Gold Deposit Length Grade x Hole ID From (m) To (m) Au (g/t) (m) Length EMD002 102 148 46.00 8.40 386.2 MIRC004 51 52 1.00 321.00 321.0 MND1406 53 70 17.00 17.65 300.1 MGCR0401 8 24 16.00 12.54 200.6 MGCR0057 18 27 9.00
Slide 12: Munda Grade control drill program will be conducted on a 5m x 5m grid pattern
Munda Grade control drill program will be conducted on a 5m x 5m grid pattern over proposed starter pit Highlighted in dark red is the 5m x 5m grid pattern for grade control drilling. More than 400 holes will drilled in the program starting 25 November 2024 and targeted to finish in mid-February 202
Slide 13: Munda
Munda Recent work completed • Heritage survey with the Marlinyu Ghoorlie • Acquired Flora & Fauna survey as part of WIN Metals transaction. • Acquisitions of Mining rights from WIN Metals. Next Steps • 400-hole grade control drilling program has now commenced. • Continue negotiation with mining cont
Slide 14: Remainder of 2024 and 2025
Remainder of 2024 2025 Start Munda grade control drilling Mine starter pit at Munda subject to toll mill agreement Complete mining at Jeffreys Complete planning for large Find scale mining at Munda Milling of Jeffreys Find ore Mill remaining tonnes from at Three Mile Hill Jeffreys Find Milling of 14
Slide 15: A cash pipeline for the next five years is now in play.
A cash pipeline for the next five years is now in play. As production concludes at Jeffreys Find our initial aim is to mine a starter pit at Munda. One project folds into the next. All things being equal Auric has in its sight the possibility of substantial gold production and profits over the comin
Slide 16: Company Vision
Company Vision • Complete Jeffreys Find Project then Develop and mine Munda. • Remain gold-focused. • Look to acquire gold assets in the Western Australian Goldfields. • Rigorous exploration of our tenement package including Spargoville, Widgie Gold and Chalice West Projects.
Slide 17: Appendix A: Compliance Statement and ASX Announcements
Appendix A: Compliance Statement and ASX Announcements Compliance Statement The information in this presentation relating to exploration results, production targets and mining production is extracted from the following announcements all of which are available to view on the Auric website www.auricmi
Slide 18: Thank you!
Thank you! We’re an exciting story - all happening in the shadow of The Golden Eagle, the legendary 1,135 ounce nugget discovered just a few kilometres from our Munda Gold Deposit. Please join us Follow our communications
Slide 19: Slide 19