Selkirk Copper Mines Inc. · TSXV:SCMI

Selkirk Copper Mines — Investor Presentation (April 2026)

31 slides from Selkirk Copper Mines's investor presentation, April 2026

  1. Slide 1: Yukon’s Next Producing Copper Mine

    Yukon’s Next Producing Copper Mine Writing a New Chapter, Building for the Future Selkirk Copper Mines TSX-V:SCMI | OTCQB:SKRKF | FRA:IO20 selkirkcopper.com April 2026

  2. Slide 2: Cautionary Notes and Technical Disclosure

    Cautionary Notes and Technical Disclosure Disclaimer Recipients of this Presentation who are considering acquiring securities of Company or a related entity are reminded that any such purchase or subscription must not be made solely on the basis of the information contained in this Presentation but

  3. Slide 3: Rare Copper-(Gold-Silver) Opportunity in Canada

    Rare Copper-(Gold-Silver) Opportunity in Canada Compelling • Purchased an idled copper-gold-silver mine for ~C$16M, and current market capitalization of ~C$150M Opportunity at • Near-term production potential leveraging existing infrastructure creates a rare opportunity to become a near-term single

  4. Slide 4: Corporate Overview

    Corporate Overview TSXV:SCMI | OTCQB:SKRKF | FRA:IO20 Capital Structure & Market Valuation CEO Asset Summary Selkirk First 6.0% • 100% ownership of the Minto Mine covering 26,850 hectares Shares Outstanding 128,319,836 Nation Board & • Accessible year-round by road, barge, and air Options 8,831,250

  5. Slide 5: Selkirk Copper Project Overview

    Selkirk Copper Project Overview Located in the Minto-Carmacks Belt, Yukon – a Well-established Mining District Project Details Ownership 100% Selkirk Copper Mines Inc. (TSX-V:SCMI | OTCQB:SKRKF | FRA:IO20) Majority Shareholder Selkirk First Nation (22%) Location Central Yukon (250km North of Whiteho

  6. Slide 6: Benchmarking SCMI to Relative North American Copper Developers

    Benchmarking SCMI to Relative North American Copper Developers Anticipated First 1 $4,000 2028 2030 2030 - 2032 2030 - 2029 2028 2026 Production $3,500 0.8 $3,110 Market Cap (C$M) $3,000 $2,587 0.6 $2,500 $1,532 $2,000 0.4 $1,257 $1,273 $1,025 $1,500 $909 $932 $794 $1,000 0.2 $154 $500 0 $0 Selkirk

  7. Slide 7: Significant Existing Capital and Infrastructure

    Significant Existing Capital and Infrastructure Significant Underground Workings Open Pit Mineral Resources Large Drilling Database 4,100 tpd Mill 400 Person Camp Water Treatment Plant 7

  8. Slide 8: What’s Different This Time

    What’s Different This Time Boots on the Ground – This asset has been underattended to and undermanaged for ~10 years; our team is committed to changing that starting now Social License – Selkirk Copper’s advancement of the Minto Mine towards a restart decision will be in partnership with Selkirk Fir

  9. Slide 9: Minto Copper-Gold-Silver Exploration, Drilling, Development and Operations Timelines

    Minto Copper-Gold-Silver Exploration, Drilling, Development and Operations Timelines 500,000 m Minto Copper-Gold-Silver No Exploration > 25,000m Exploration, Drilling, Development and Operations Timeline Drilling 400,000 m Discovery of 2013 to 2019 First First Production > 10,000m 200 High-Grade Geo

  10. Slide 10: Historical Mine Production

    Historical Mine Production OP Ore Mined (LHS) UG Ore Mined (LHS) Mill Feed (LHS) Overall Cu Recovery (%) (RHS) 2,000 100 1,600 80 Design Capacity — 4,100 tpd Tonnage (000 t) 1,200 60 800 40 400 20 0 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Sherwood Copper

  11. Slide 11: Restart Planning

    Restart Planning

  12. Slide 12: Minto Timeline

    Minto Timeline Oct 2018 Jun 2025 Mid-2027 Capstone Places SFN Completes acquisition Planned completion Minto into Care of all tangible and intangible of Feasibility Study & Maintenance assets of the Minto mine Apr 2022 Restricted operating Mar 2026 Mid-2028 Oct 2019 Expected Oct 2026 Potential first

  13. Slide 13: Multi-Step Plan to Inform a Restart Decision and Plan

    Selkirk Copper Mines Inc. Multi-Step Plan to Inform a Restart Decision and Plan Target Timeline 2025 2026 2027 2028 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Due Diligence, $4.5M Initial TSX-V OTC PEA Restart Feasibility Mill First Partnering, and Financing Listing Listing Completion Indicatio

  14. Slide 14: Preliminary Economic Assessment & Restart Objectives

    Preliminary Economic Assessment & Restart Objectives • 12-15 year mine life – Sufficient to attract low-cost restart financing • 4,100 tpd (1.5 Mtpa) mine and mill throughput – Consistent throughput at steady grades, with an ore blending strategy to ensure mining stays ahead of milling • ~30,000 tpa

  15. Slide 15: Recent Developments and Near-Term Catalysts

    Recent Developments and Near-Term Catalysts ✓ Completed C$4.5M and C$40M equity raise at ~C$30M EV, resulting in 100% ownership of the mine and infrastructure ✓ Resumed trading on TSX Venture (TSX-V:SCMI) on Nov 4, 2025 also trading on the OTCQB Market (OTCQB:SKRKF) and Frankfurt Exchange (FRA:IO20)

  16. Slide 16: Selkirk Copper Team

    Selkirk Copper Team Board of Directors Colin Joudrie Alex Morrison Greg Fekete Rob McLeod Stephen Mills Ryan Weymark CEO, Director Independent Director SFN Nominated Director Director SFN Nominated Director Director Executive Josh Kierce Matthew Pickard Scott Fulton Kevin McGinty Stacie Jones Justin

  17. Slide 17: Exploration Update

    Exploration Update 17

  18. Slide 18: District-Wide Exploration

    District-Wide Exploration • Selkirk Copper acquired an updated, high-quality LiDAR dataset in Q4 2025 covering ~2,000km2 of prospective Minto-Carmacks Copper Belt which will act as an updated base map for mine-site and district-wide exploration activities • Selkirk Copper holds ~26,850 ha of mineral

  19. Slide 19: Mine-Site Exploration and Resource Drilling

    Mine-Site Exploration and Resource Drilling • 50,000 m Phase 1 drill program is focused on: 600 60000 Rig 12 Cumulative Daily Drill Production Averages • Expanding and Extending zones of known Rig 11 mineralization at Minto North, Minto East, 500 Rig 10 50000 and Copper Keel underground zones and th

  20. Slide 20: Minto Mineralization Zones

    Minto Mineralization Zones Within the Mine Site Footprint 20

  21. Slide 21: Mine-Site Exploration and Resource Drilling

    Mine-Site Exploration and Resource Drilling Results from Dec 22, 2025, Jan 22, Feb 19, and Mar 25, 2026 21

  22. Slide 22: Minto North West Zone

    Minto North West Zone Results from Phase 1 Drillholes Hole_ID Zone From_m To_m Total Length_m Cu_pct Au_ppm Ag_ppm Cu Eq (Fixed R) pct*m 25SCM001 Minto North West 226.0 249.4 23.4 2.39 0.32 11.61 2.72% 63.6 228.9 237.5 8.7 5.21 0.47 26.68 5.79% 50.1 25SCM002 Minto North West 218.1 249.7 31.6 1.53 0.

  23. Slide 23: Minto North West Zone Core Detail

    Minto North West Zone Core Detail 25SCM001 25SCM002 0.30-1.0% Cu 1.01-3.0% Cu 3.01-10.0% Cu >10.01% Cu 23

  24. Slide 24: Geological Observations

    Geological Observations Increasing Deformation Intensity, Increasing Magnetite Increasing Chalcopyrite Abundance Increasing Bornite Abundance Unfoliated Incipient Weak Foliation Moderate Strong Foliation Migmatite Net-Textured Semi-Massive May contain Foliation Biotite connectivity Foliation Segrega

  25. Slide 25: Minto Property Exploration

    Minto Property Exploration 2D inversion DCIP • Magnetic data appears effective at mapping structure • Discrete high magnetic responses coincide with shallow zones of high- grade mineralization; however shallow Minto North oxide development is magnetite destructive. Minto East Copper Keel • Chargeabi

  26. Slide 26: Geoscience Advancements

    Geoscience Advancements • Re-establish structural model incorporating historical work plus new drilling and oriented core measurements. Important framework for resource estimation and geotechnical designs. • Developing targeting model based upon sulphide zonation (bn > cpy > py), foliation developme

  27. Slide 27: Trade-Off Study and Preliminary Economic Assessment (PEA) Update

    Trade-Off Study and Preliminary Economic Assessment (PEA) Update 27

  28. Slide 28: Engineering Update

    Engineering Update Trade-Off Study and PEA Hatch and SRK Teams underway: Site Visit October 16-19 Trade-Off Study and Preliminary Economic Assessment (PEA) Design Basis/Objectives: • 1) define a 12-15 year mine- life; 2) 4,100tpd continuous ore production; 3) tailings & waste rock disposal within QM

  29. Slide 29: Permitting Update

    Permitting Update 29

  30. Slide 30: Advancing Our Regulatory Efforts

    Advancing Our Regulatory Efforts Water, Waste, and Tailings Resourcing the Opportunity • Continuing to discuss how to address the • Hired Director, Permitting physical and permitting requirements to • Request for Qualifications and Proposals remove the water stored underground by the issued to vario

  31. Slide 31: Contact

    colin.joudrie@selkirkcopper.com 604-760-3157 justin.stevens@selkirkcopper.com 604-240-2959

Selkirk Copper Mines — Investor Presentation (April 2026) on 6ix