Comstock Inc. · AMEX:LODE

Comstock — GoldSpring — Technical Presentation (October 2008)

23 slides from Comstock's technical presentation, Oct 14, 2008

  1. Slide 1: Hartford Hill Complex: A Third Party Mining Resource Review 2007 to 2008

    GOLDSPRING COMSTOCK OPERATIONS HARTFORD HILL COMPLEX A THIRD PARTY REVIEW A MINING RESOURCE REVIEW 2007 TO 2008 A +516,000 AU OZ RESOURCE

  2. Slide 2: General Project Location Map

    GENERAL PROJECT LOCATION MAP TELESTO

  3. Slide 3: Land Position

    LAND POSITION GOLDSPRING CURRENTLY CONTROLS AN ESTIMATED 3533 ACRES UN PATENT CLAIMS — 2929 ACRES PLUM CONTROLLED — 604 Ac TELEST®

  4. Slide 4: Virginia City Quad Map

    VIRGINIA CITY QUAD MAP HISTORICAL LOCATION MAP VIRGINIA CITY 7.5 MINUTE QUAD MAP TELESTO

  5. Slide 5: Regional Geology Map

    REGIONAL GEOLOGY MAP SOURCED FROM PRELIMINARY GEOLOGIC MAP OF THE VIRGINIA CITY QUADA ANGLE COMPLETED BY: DON HUDSON STEPHEN CASTOR LARRY GARSIDE TELESTO

  6. Slide 6: Drill Hole Location Map

    DRILL HOLE LOCATION MAP A TOTAL OF 507 DRILL HOLES IN THE HARTFORD HILL AREA AT THE TIME OF THE SEPTEMBER RESOURCE ESTIMATE TELESTO re i

  7. Slide 7: Local Geology Map

    LOCAL GEOLOGY MAP LOCAL GEOLOGY MAP COMPLETED BY GEORGE ELIOPULOS INDEPENDENT CONTRACTOR SUPPORTING INFORMATION COMPILED BY TELESTO STAFF TELESTO

  8. Slide 8: Cross Section A

    CROSS SECTION A 14771350 NORTH LOOK NORTH TELESTO

  9. Slide 9: Cross Section B

    CROSS SECTION B 14771650 N LOOKING NORTH TELESTO

  10. Slide 10: Cross Section C

    CROSS SECTION C 14771800 N LOOKING NORTH TELESTO

  11. Slide 11: Underground Development

    UNDERGROUND DEVELOPMENT MAPPED UNDERGROUND WORKINGS IN THE HARTFORD HILL AREA TELESTO

  12. Slide 12: Process Flow Diagram

    PROCESS FLOW DIAGRAM CONCEPTUAL LOW AND HIGH GRADE SIZING CIRCUITS TELESTO

  13. Slide 13: Resource Procedure

    RESOURCE PROCEDURE BLOCK SIZE IS LX10°WX10°H BLOCK MODEL 300 ROWS X 200 COLUMNS X 150 LEVELS ESTIMATION METHOD INVERSE DISTANCE SQUARED MODEL ORIENTATION NORTHWEST 45 DEGREES GEOLOGIC POLYGONS WERE USED TO BOUND MINERALIZATION TELESTO

  14. Slide 14: Modeling Tools

    MODELING TOOLS + VARIOGRAMS — IN FIVE PRINCIPLE DIRECTIONS TO TEST FOR DIRECTIONAL VARIANCES. (STRUCTURES) + STATISTICS — RUN ON 20755 ASSAY INTERVALS + GEOLOGY — THE REVIEW OF 507 DRILL LOGS TO ESTABLISH GEOLOGY. + CROSS SECTIONS — REVIEWED FOR CROSS SECTIONAL CHECKS AGAINST MODELED AREAS. + BENCH

  15. Slide 15: Variograms

    VARIOGRAMS PRODUCTION DRILL HOLES WERE USED TO ESTABLISH THE VARIOGRAM RANGES « A TOTAL OF 754 HOLES WERE USED * A TOTAL OF 1344 ASSAY INTERVALS WERE COMPILED * MAJOR AXIS - N 35 W/ 180 FEET * MINOR AXIS — 70 FEET * Z AXIS —20 FEET (SELF IMPOSED) TELESTO

  16. Slide 16: Statistics

    STATISTICS * STATS WERE RUN ON THE 27 ESTABLISHED ROCK CODES * QUARTZ VEINING AND MANGANESE WERE THE STRONGEST ORE INDICATORS * ROCK TYPES WERE GROUPED AND EVALUATED BY MEANS, LITHOLOGY AND ALTERATION. TELESTO

  17. Slide 17: Geology

    GEOLOGY * EACH ASSAY INTERVAL WAS CODED WITH ROCK TYPE AND ALTERATION * STATS FOR EACH ROCK TYPE ENTERED * STATS WERE RUN ONA COMBINATION OF 27 ROCK TYPES & ALTERATION CODES * ORE AND COUNTRY ROCK TYPES WERE BROKEN OUT TELESTO

  18. Slide 18: Cross Sections

    CROSS SECTIONS * CREATED ON 100 FOOT INTERVALS * OFFERED A CHECK FOR DRILL HOLE ELEVATIONS TELESTO

  19. Slide 19: Bench Plans

    BENCH PLANS * BENCH PLANS HAVE BEEN CREATED ON 10 FOOT LIFTS * THEY ALSO OFFERED A CHECK ON INFILL DRILLING AREAS TELESTO

  20. Slide 20: Drilling

    DRILLING « A TOTAL OF 507 DRILL HOLES WERE USED * 20755 ASSAY INTERVAL VALUES WERE ENTERED * 10782 COMPOSITES INTERVALS WERE CREATED * EACH ASSAY INTERVAL HAD A CORRESPONDING GEOLOGICAL CODE FOR ROCK TYPE AND ALTERATION TELESTO

  21. Slide 21: The Modeled Geological Resource

    THE MODELED GEOLOGICAL RESOURCE aU ORE ‘TONS MEAN AU MILOZ BLOCKS ABOVE.— GRADE. oz curorr curorr ABOVE ABOVE THE RESULTING curore —curorr AU OZ TOTAL zo aio? 7479584 0.072 ste9ss.848 WAS +510,000 ee ee er ee so 3236364656 © 0.105 ——auosan.e CONTAINED so mast. 27asz32—0.122——334918.304 70 1961221965

  22. Slide 22: Scoping Study: Preliminary Open Pit Plans

    Scoping Study Preliminary Open Pit Plans Gold Price Total Ore $250 $300 $400 $600 $800 1,349,000 1,705,000 4,000,000 8,146,000 10,419,000 TELESTO Grade (opt) 0.101 opt Au 0.096 0.076 0.060 0.055 Contain Oz 141,344 oz 164,131 302,615 487,024 573,011 Strip Ratio 3.32 2.24 239 3.36

  23. Slide 23: Mine Scoping Study

    Mine Scoping Study PRELIMINARY PITS. High Grade: 1,688,000 Tons @ 0.176 AUOPT CUTOFF 0.080 Au OF) Low Grade: 8,832,000 @ 0.033 AUOPT CUTOFF 0.017 Au OPT 36,019,000 TONS OF WASTE Stripping Ratio = 3.4