Slide 1: Meteoric Resources - Discovering Gold 2020
METEORIC RESOURCES For personal use only DISCOVERING GOLD - 2020 NOOSA MINING VIRTUAL Investor Presentation 16th July 2020
Slide 2: Disclaimer
DISCLAIMER The material in this presentation has been prepared by Meteoric Resources and is general background information about Meteoric’s activities current as at the date of this presentation. This information is given in summary form and does not For personal use only purport to be complete. Inf
Slide 3: Corporate Overview
CORPORATE OVERVIEW For personal use only Andrew Tunks Managing Director WA Gold project acquisition Dr Tunks is a member of the Australian Institute of Geoscientist holding a B.Sc. (Hons.) from Monash and a Ph.D from the University of Tasmania. Dr Tunks has held numerous senior executive positions i
Slide 4: Growing Footprint Australia – Brazil
GROWING FOOTPRINT AUSTRALIA – BRAZIL For personal use only 4 | INVESTOR PRESENTATION
Slide 5: WA Gold Acquisition – Palm Springs Gold Project
WA GOLD ACQUISITION – PALM SPRINGS GOLD PROJECT For personal use only Palm Springs includes: • Butchers Creek Open Cut • Operated 1995 – 1997 Acquisition of 13 licences - 120km2 • 50,000 oz produced • Ore in floor of pit • Includes 3 granted Mining Leases (MLs) • 60 Gold Prospects in Project • Separ
Slide 6: Butchers Creek Previously Producing Gold Mine
BUTCHERS CREEK PREVIOUSLY PRODUCING GOLD MINE For personal use only Start of 1997 Gold Price Meanwhile AUD Gold Price is Dropped below $AUD 500 up more than 500% 6 | INVESTOR PRESENTATION
Slide 7: Palm Springs Gold Project Historic Data – X Section 10,100 mN
PALM SPRINGS GOLD PROJECT HISTORIC DATA –X SECTION 10,100 mN For personal use only Actual Pit floor 1997 Planned Pit 1996 Inset for next slide 7 | INVESTOR PRESENTATION
Slide 8: Detail section 10,100mN
For personal use only • Historical section 10,100mN • Pencil workings from 1996 • Only drilling data we have • Final Pit Survey - pit depth at 335m (top of this view) • Amazing robust orebody beneath the floor of the abandoned pit – waiting to be RE-discovered! • We will be drilling these targets in
Slide 9: Palm Springs Gold Project Exploration Program
PALM SPRINGS GOLD PROJECT EXPLORATION PROGRAM For personal use only 2020 Drilling Program commencing early August: • 5,000m RC • 1,500m Diamond • Planning for Regional targets • Planning for Geophysics Appointment of Tony Cormack, WA Exploration Manager 9 | INVESTOR PRESENTATION
Slide 10: Palm Springs Gold Project Butchers Creek
PALM SPRINGS GOLD PROJECT BUTCHERS CREEK For personal use only • Abundant potential remains in the floor of the southern end of Butchers Creek Pit • Orebody completely open at depth and down plunge to the south • The entire prospect lies with granted Mining Leases from the early 1990s PLUS • 9Mt Tai
Slide 11: Brazil Juruena History
BRAZIL JURUENA HISTORY For personal use only • Juruena contains extensive artisanal workings • Recorded production in excess of 500,000oz gold • Over 30,000 Garimpeiros worked the Juruena area in 1980s Gold Rush Historic workings at Juruena Gold Project Nugget from Juruena Gold Project • Limited pro
Slide 12: Juruena Gold JORC Resource
JURUENA GOLD JORC RESOURCE For personal use only PROSPECT CATEGORY CUT OFF Tonnes Grade (g/t) Oz Au Indicated 67,800 13.7 29,800 Donna Maria Inferred 2.5 g/t 148,500 12.2 58,200 Sub-total 216,300 12.7 88,000 Indicated 31,200 28.4 28,500 Querosene Inferred 2.5 g/t 188,700 14.7 89,300 Sub-total 219,90
Slide 13: 2019 Drilling JUDD001 – Our First Hole
2019 DRILLING JUDD001 – OUR FIRST HOLE For personal use only 20.6m @ 94.9 g/t Au Including 3.65m @ 508.4 g/t Au JUDD001 • 112.8m Visible Gold • 97m - 113m a broad zone of TOP 5 INTERCEPTS FOR SEPTEMBER - WORLDWIDE alteration chlorite – sericite – pyrite – gold 13 | INVESTOR PRESENTATION
Slide 14: 2019 Significant Intercepts
2019 SIGNIFICANT INTERCEPTS For personal use only Gram.Metres Prospect Hole ID From (m) Interval (m) Au Grade (g/t) (g/t.m) Dona Maria JUDD001 96.8 20.6 94.9 1954 including 107.5 3. 7 508.4 1856 Dona Maria JUDD002 41.2 1.1 22.7 26 Dona Maria JUDD007 124 3.5 15.3 54 Dona Maria JUDD008 141.5 14.0 81.7
Slide 15: Dona Maria 2020 Drilling
DONA MARIA 2020 DRILLING For personal use only • Moderate to steeply dipping ore zones • Average 1m to 4m true width • Bonanza Grades controlled by fault intersections? • Excellent Metallurgy with > 90% recoveries • 2020 Program Extending Resource at Depth • Drilling NOW • Results to flow 15 | INVES
Slide 16: Summary
SUMMARY For personal use only Currently drilling at Juruena Results expected late August Drilling Commencing at Palm Springs Early August Results expected late September/early October Meteoric Resources 2020 • Over 10,000m of drilling across two continents • Generating strong exploration results 16
Slide 17: Thank You
For personal use only THANKYOU Dr Andrew Tunks Managing Director Phone: +61 400 205 555 Email: ajtunks@meteoric.com.au meteoric.com.au 17 | INVESTOR PRESENTATION