Meteoric Resources Nl · ASX:MEI

Meteoric Resources Nl — Meteoric Resources — Noosa Mining Virtual Conference 2020

17 slides from Meteoric Resources Nl's conference presentation, Jul 16, 2020

  1. Slide 1: Meteoric Resources - Discovering Gold 2020

    METEORIC RESOURCES For personal use only DISCOVERING GOLD - 2020 NOOSA MINING VIRTUAL Investor Presentation 16th July 2020

  2. Slide 2: Disclaimer

    DISCLAIMER The material in this presentation has been prepared by Meteoric Resources and is general background information about Meteoric’s activities current as at the date of this presentation. This information is given in summary form and does not For personal use only purport to be complete. Inf

  3. Slide 3: Corporate Overview

    CORPORATE OVERVIEW For personal use only Andrew Tunks Managing Director WA Gold project acquisition Dr Tunks is a member of the Australian Institute of Geoscientist holding a B.Sc. (Hons.) from Monash and a Ph.D from the University of Tasmania. Dr Tunks has held numerous senior executive positions i

  4. Slide 4: Growing Footprint Australia – Brazil

    GROWING FOOTPRINT AUSTRALIA – BRAZIL For personal use only 4 | INVESTOR PRESENTATION

  5. Slide 5: WA Gold Acquisition – Palm Springs Gold Project

    WA GOLD ACQUISITION – PALM SPRINGS GOLD PROJECT For personal use only Palm Springs includes: • Butchers Creek Open Cut • Operated 1995 – 1997 Acquisition of 13 licences - 120km2 • 50,000 oz produced • Ore in floor of pit • Includes 3 granted Mining Leases (MLs) • 60 Gold Prospects in Project • Separ

  6. Slide 6: Butchers Creek Previously Producing Gold Mine

    BUTCHERS CREEK PREVIOUSLY PRODUCING GOLD MINE For personal use only Start of 1997 Gold Price Meanwhile AUD Gold Price is Dropped below $AUD 500 up more than 500% 6 | INVESTOR PRESENTATION

  7. Slide 7: Palm Springs Gold Project Historic Data – X Section 10,100 mN

    PALM SPRINGS GOLD PROJECT HISTORIC DATA –X SECTION 10,100 mN For personal use only Actual Pit floor 1997 Planned Pit 1996 Inset for next slide 7 | INVESTOR PRESENTATION

  8. Slide 8: Detail section 10,100mN

    For personal use only • Historical section 10,100mN • Pencil workings from 1996 • Only drilling data we have • Final Pit Survey - pit depth at 335m (top of this view) • Amazing robust orebody beneath the floor of the abandoned pit – waiting to be RE-discovered! • We will be drilling these targets in

  9. Slide 9: Palm Springs Gold Project Exploration Program

    PALM SPRINGS GOLD PROJECT EXPLORATION PROGRAM For personal use only 2020 Drilling Program commencing early August: • 5,000m RC • 1,500m Diamond • Planning for Regional targets • Planning for Geophysics Appointment of Tony Cormack, WA Exploration Manager 9 | INVESTOR PRESENTATION

  10. Slide 10: Palm Springs Gold Project Butchers Creek

    PALM SPRINGS GOLD PROJECT BUTCHERS CREEK For personal use only • Abundant potential remains in the floor of the southern end of Butchers Creek Pit • Orebody completely open at depth and down plunge to the south • The entire prospect lies with granted Mining Leases from the early 1990s PLUS • 9Mt Tai

  11. Slide 11: Brazil Juruena History

    BRAZIL JURUENA HISTORY For personal use only • Juruena contains extensive artisanal workings • Recorded production in excess of 500,000oz gold • Over 30,000 Garimpeiros worked the Juruena area in 1980s Gold Rush Historic workings at Juruena Gold Project Nugget from Juruena Gold Project • Limited pro

  12. Slide 12: Juruena Gold JORC Resource

    JURUENA GOLD JORC RESOURCE For personal use only PROSPECT CATEGORY CUT OFF Tonnes Grade (g/t) Oz Au Indicated 67,800 13.7 29,800 Donna Maria Inferred 2.5 g/t 148,500 12.2 58,200 Sub-total 216,300 12.7 88,000 Indicated 31,200 28.4 28,500 Querosene Inferred 2.5 g/t 188,700 14.7 89,300 Sub-total 219,90

  13. Slide 13: 2019 Drilling JUDD001 – Our First Hole

    2019 DRILLING JUDD001 – OUR FIRST HOLE For personal use only 20.6m @ 94.9 g/t Au Including 3.65m @ 508.4 g/t Au JUDD001 • 112.8m Visible Gold • 97m - 113m a broad zone of TOP 5 INTERCEPTS FOR SEPTEMBER - WORLDWIDE alteration chlorite – sericite – pyrite – gold 13 | INVESTOR PRESENTATION

  14. Slide 14: 2019 Significant Intercepts

    2019 SIGNIFICANT INTERCEPTS For personal use only Gram.Metres Prospect Hole ID From (m) Interval (m) Au Grade (g/t) (g/t.m) Dona Maria JUDD001 96.8 20.6 94.9 1954 including 107.5 3. 7 508.4 1856 Dona Maria JUDD002 41.2 1.1 22.7 26 Dona Maria JUDD007 124 3.5 15.3 54 Dona Maria JUDD008 141.5 14.0 81.7

  15. Slide 15: Dona Maria 2020 Drilling

    DONA MARIA 2020 DRILLING For personal use only • Moderate to steeply dipping ore zones • Average 1m to 4m true width • Bonanza Grades controlled by fault intersections? • Excellent Metallurgy with > 90% recoveries • 2020 Program Extending Resource at Depth • Drilling NOW • Results to flow 15 | INVES

  16. Slide 16: Summary

    SUMMARY For personal use only Currently drilling at Juruena Results expected late August Drilling Commencing at Palm Springs Early August Results expected late September/early October Meteoric Resources 2020 • Over 10,000m of drilling across two continents • Generating strong exploration results 16

  17. Slide 17: Thank You

    For personal use only THANKYOU Dr Andrew Tunks Managing Director Phone: +61 400 205 555 Email: ajtunks@meteoric.com.au meteoric.com.au 17 | INVESTOR PRESENTATION

Meteoric Resources — Noosa Mining Virtual Conference 2020 on 6ix