BP plc · LSE:BP.

BP — Technical Presentation

6 slides from BP's technical presentation

  1. Slide 1: Environmental Management – Engineering to prevent LOPC

    Environmental Management – Engineering to prevent LOPC By Ian Pannett, BP AGT Regional Engineering Authority

  2. Slide 2: Engineering to avoid Loss of Primary Containment

    Engineering to avoid Loss of Primary Containment No accidents, no harm to people, no damage to the environment  Integrity Management & Process Safety activities deliver the policy and assure our facilities are managed safely with maintained integrity  Achieved by:  Application of a continuous ass

  3. Slide 3: OMS and Systematic Management

    OMS and Systematic Management 3.1 Risk assessment and management 3.3 Process Safety

  4. Slide 4: Risk Assessment and Ranking

    Risk Assessment and Ranking High RISK EVENT Consequence Severity Risk reduction activity implemented Event Likelihood High 4

  5. Slide 5: Typical Bow Tie Model and Risk Barriers

    Typical Bow Tie Model and Risk Barriers PREVENTION MITIGATION BARRIER CONSEQUENCE CAUSE EVENT BARRIER Hazard Loss of Process Process Blast Fire, Relief Contain Ignition Integrity control SIS Resistant Explosion System ment prevention system buildings LOPC Environmental External impact Physical Contr

  6. Slide 6: OMS and Risk Management Cycle

    OMS and Risk Management Cycle Risk Assessment Planning & Controls & Prioritisation Barriers Planned Risk Study Mitigations MOC Inspection Un-planned Routine Non-routine Incident Assurance Operating Annual Plan Procedures Mobilise Risk Update Resources Management Review Implementation & & Improvement

BP — Technical Presentation on 6ix