Turquoise Hill Resources Ltd.

Turquoise Hill Resources — Investor Presentation (February 2017)

21 slides from Turquoise Hill Resources's investor presentation, February 2017

  1. Slide 1: Investor Presentation February 2017

    Investor Presentation FEBRUARY 2017 Oyu Tolgoi: Creating long-term value at world’s best developing copper project

  2. Slide 2: Turquoise Hill's investment thesis

    Turquoise Hill’s investment thesis Oyu Tolgoi is world’s best developing copper project; expected to be world’s third-largest copper mine with underground Significant cash flow expected from underground Hugo North Lift 1 financing in place1 Early underground production should benefit from expected d

  3. Slide 3: Long-term copper fundamentals strong

    Long-term copper fundamentals strong Copper supply/demand outlook Copper market likely to be in Base Highly Probable Primary Demand Annual avg cu price balance in 2017 30 $4 Forecast Ongoing attrition at existing mines driven by declining Annual average LME copper price (US$/lb) 25 grade $3 Copper s

  4. Slide 4: Oyu Tolgoi underground a Tier 1 asset

    Oyu Tolgoi underground a Tier 1 asset 2025 copper mine C1+royalties+sustaining normal cost curve C/lb, 2016$ 400 Q1 Q2 Q3 Q4 300 Oyu Tolgoi Other Mines 200 100 0 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 Cumulative production (‘000 tonnes) -100 Source: Wood Mackenzie (Q3’16 Cost S

  5. Slide 5: Potential full-production valuation upside

    Potential full-production valuation upside Indicative valuation1 (US$B) EV/Reserves EV/M+I+I Resources5,6 Price/NAV TRQ EV/Reserves ($/lb.) TRQ EV/M+I+I Resources ($/lb.) TRQ P/NAV $0.17 $0.06 0.82x Trading comps2 Average EV/Reserves ($/lb.) Average EV/M+I Resources ($/lb.) Average P/NAV Current EV3

  6. Slide 6: 2016 Reserves Case mining areas

    2016 Reserves Case mining areas Oyut Open Pit ~950Mt (reserve) 0.45% copper; 0.28 g/t gold Hugo North Lift 1, panels 0,1,2 ~500Mt (reserve) 1.66% copper; 0.35 g/t gold Hugo North Lift 1 Underground Open Pit Plant Ramp-up (2020-2027), full production (~33mtpa) Open-pit mine tops-up concentrator when

  7. Slide 7: Underground mining sequence

    Underground mining sequence Initial underground production begins with Panel 0 Hugo North Lift 1, panels 0,1,2 ~500Mt (reserve) Highest copper grades occur 1.66% copper; 0.35 g/t gold during ramp up exceeding 2.5% in several years 2024-2026: Oyu Tolgoi “peak” copper production during period expected

  8. Slide 8: Complete ramp-up expected by 2027

    Complete ramp-up expected by 2027 Sustainable underground production Complete convey to surface Project First draw Complete concentrator Complete re-start bell firing upgrade ramp-up 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 Pre-start Excavation (lateral / mass / vertical) Exc

  9. Slide 9: Key underground components

    Key underground components Shaft 1 Shaft 2 Shaft 5 Shaft 3 Shaft 4 (early development (production and (ventilation) (ventilation) (ventilation) and ventilation) ventilation) Total Depth 1,385 metres 1,284 metres 1,178 metres 1,148 metres 1,149 metres Diameter 6.7 metres 10 metres 6.7 metres 10 metre

  10. Slide 10: 2016 Resources Case

    2016 Resources Case Oyut Open Pit ~950Mt (reserve) 0.45% copper; 0.28 g/t gold Hugo South ~300Mt (resource) Heruga 1.07% copper ~700Mt (resource) 0.06 g/t gold 0.42% copper 0.43 g/t gold; >100Mlb moly Hugo North Lift 1, panels 0,1,2 ~500Mt (reserve) 1.66% copper; 0.35 g/t gold Hugo North Lift 2 ~700

  11. Slide 11: Alternative Production Cases

    Alternative Production Cases Resources 120 Case • ~Year 20, concentrator capacity ~120mtpa • NPV8% $8.8 billion1 • Expansion capex ~$14.9 billion3 Resources 100 Case • ~Year 20, concentrator capacity ~100mtpa • NPV8% $8.9 billion1 • Expansion capex ~$13.5 billion3 Resources 50 Case • Assumes concent

  12. Slide 12: Production highlights

    Production highlights All Injury Frequency Rate Concentrator throughput (per 200,000 hours worked) ('000 tonnes) 0.47 38,152 0.43 34,537 0.33 27,872 20,317 0.22 2013 2014 2015 2016 2013 2014 2015 2016 Industry-leading safety performance Multiple productivity initiatives have led to improved throughp

  13. Slide 13: Financial highlights

    Financial highlights Cash position Operating cash flow ($'000,000) ($'000,000) $1,437 $719 $1,344 $651 $381 $863 Cu:$3.10 Cu:$2.49 Cu:$2.15 Au:$1,266 Au:$1,160 Au:$1,259 2013 2013 2014 2015 Q3'16 YTD Cu:$3.33* Au:$1,411* $78 ($631) 2013 2014 2015 Q3'16 Strong cash position Consecutive periods of pos

  14. Slide 14: Production and financial guidance

    Production and financial guidance 2016 2017 Copper in concentrates 201,300 tonnes (actual) 130,000 – 160,000 tonnes 175,000 – 195,000 tonnes Gold in concentrates 300,000 ounces (acutal) 100,000 – 140,000 ounces 255,000 – 285,000 ounces Operating cash costs $840 million* $720 million Capital expendit

  15. Slide 15: Managing near-term ore grade challenges

    Managing near-term ore grade challenges Phase 3 nearly complete (2017) Phase 6 and lower-grade stockpile ore processed mid-2016 to mid-2018 Phase 4 waste mining critical; uncovers 2017 medium-grade ore and 2018 high-grade ore Primary Crusher 2017-18 Ore (Phase 4a & 6, stockpiles) Waste Dumps Tailing

  16. Slide 16: Oyu Tolgoi's impact in Mongolia

    Oyu Tolgoi’s impact in Mongolia Mongolian Workforce Taxes and Fees In-country Spend 94% $1.6B $6.1B At the end of 2016, ~94% Between 2010 and 2016, Between 2010 and 2016, of Oyu Tolgoi’s workforce Oyu Tolgoi paid $1.6B in Oyu Tolgoi has spent was Mongolian taxes, fees and other $6.1B in Mongolia1 pa

  17. Slide 17: Oyu Tolgoi – a long-term growth opportunity

    Oyu Tolgoi– a long-term growth opportunity Underground development progressing Long-term development optionality and plant expansion opportunities Open-pit mine performing as expected in low gold areas Demonstrated productivity and cost improvements Oyu Tolgoi is the best copper asset in development

  18. Slide 18: Appendix

    Appendix

  19. Slide 19: Approved underground CAPEX

    Approved underground CAPEX $1.3 $1.2 $1.2 $1.0 $0.8 $0.5 $0.5 $0.3 $0.4 $0.4 $0.4 $0.3 Underground expansion capital, VAT and escalation of $5.3 billion Underground sustaining capital, VAT and escalation of $2.8 billion to full ramp-up expected in 2027 19

  20. Slide 20: Project financing – flow of funds

    Project financing – flow of funds At September 30, 20161 At project finance drawdown Payable to Turquoise Hill* Receivable from Oyu Tolgoi* Proceeds: $4.3 billion2 $4.3 billion3 $4.2 billion Shareholder loan: $2.9 billion Shareholder loan: $2.9 billion Payable to Turquoise Hill* Receivable from Oyu

  21. Slide 21: Oyu Tolgoi at China's doorstep

    Oyu Tolgoi at China’s doorstep 21

Turquoise Hill Resources — Investor Presentation (February 2017) on 6ix