Slide 1: Investor Presentation February 2017
Investor Presentation FEBRUARY 2017 Oyu Tolgoi: Creating long-term value at world’s best developing copper project
Slide 2: Turquoise Hill's investment thesis
Turquoise Hill’s investment thesis Oyu Tolgoi is world’s best developing copper project; expected to be world’s third-largest copper mine with underground Significant cash flow expected from underground Hugo North Lift 1 financing in place1 Early underground production should benefit from expected d
Slide 3: Long-term copper fundamentals strong
Long-term copper fundamentals strong Copper supply/demand outlook Copper market likely to be in Base Highly Probable Primary Demand Annual avg cu price balance in 2017 30 $4 Forecast Ongoing attrition at existing mines driven by declining Annual average LME copper price (US$/lb) 25 grade $3 Copper s
Slide 4: Oyu Tolgoi underground a Tier 1 asset
Oyu Tolgoi underground a Tier 1 asset 2025 copper mine C1+royalties+sustaining normal cost curve C/lb, 2016$ 400 Q1 Q2 Q3 Q4 300 Oyu Tolgoi Other Mines 200 100 0 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 Cumulative production (‘000 tonnes) -100 Source: Wood Mackenzie (Q3’16 Cost S
Slide 5: Potential full-production valuation upside
Potential full-production valuation upside Indicative valuation1 (US$B) EV/Reserves EV/M+I+I Resources5,6 Price/NAV TRQ EV/Reserves ($/lb.) TRQ EV/M+I+I Resources ($/lb.) TRQ P/NAV $0.17 $0.06 0.82x Trading comps2 Average EV/Reserves ($/lb.) Average EV/M+I Resources ($/lb.) Average P/NAV Current EV3
Slide 6: 2016 Reserves Case mining areas
2016 Reserves Case mining areas Oyut Open Pit ~950Mt (reserve) 0.45% copper; 0.28 g/t gold Hugo North Lift 1, panels 0,1,2 ~500Mt (reserve) 1.66% copper; 0.35 g/t gold Hugo North Lift 1 Underground Open Pit Plant Ramp-up (2020-2027), full production (~33mtpa) Open-pit mine tops-up concentrator when
Slide 7: Underground mining sequence
Underground mining sequence Initial underground production begins with Panel 0 Hugo North Lift 1, panels 0,1,2 ~500Mt (reserve) Highest copper grades occur 1.66% copper; 0.35 g/t gold during ramp up exceeding 2.5% in several years 2024-2026: Oyu Tolgoi “peak” copper production during period expected
Slide 8: Complete ramp-up expected by 2027
Complete ramp-up expected by 2027 Sustainable underground production Complete convey to surface Project First draw Complete concentrator Complete re-start bell firing upgrade ramp-up 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 Pre-start Excavation (lateral / mass / vertical) Exc
Slide 9: Key underground components
Key underground components Shaft 1 Shaft 2 Shaft 5 Shaft 3 Shaft 4 (early development (production and (ventilation) (ventilation) (ventilation) and ventilation) ventilation) Total Depth 1,385 metres 1,284 metres 1,178 metres 1,148 metres 1,149 metres Diameter 6.7 metres 10 metres 6.7 metres 10 metre
Slide 10: 2016 Resources Case
2016 Resources Case Oyut Open Pit ~950Mt (reserve) 0.45% copper; 0.28 g/t gold Hugo South ~300Mt (resource) Heruga 1.07% copper ~700Mt (resource) 0.06 g/t gold 0.42% copper 0.43 g/t gold; >100Mlb moly Hugo North Lift 1, panels 0,1,2 ~500Mt (reserve) 1.66% copper; 0.35 g/t gold Hugo North Lift 2 ~700
Slide 11: Alternative Production Cases
Alternative Production Cases Resources 120 Case • ~Year 20, concentrator capacity ~120mtpa • NPV8% $8.8 billion1 • Expansion capex ~$14.9 billion3 Resources 100 Case • ~Year 20, concentrator capacity ~100mtpa • NPV8% $8.9 billion1 • Expansion capex ~$13.5 billion3 Resources 50 Case • Assumes concent
Slide 12: Production highlights
Production highlights All Injury Frequency Rate Concentrator throughput (per 200,000 hours worked) ('000 tonnes) 0.47 38,152 0.43 34,537 0.33 27,872 20,317 0.22 2013 2014 2015 2016 2013 2014 2015 2016 Industry-leading safety performance Multiple productivity initiatives have led to improved throughp
Slide 13: Financial highlights
Financial highlights Cash position Operating cash flow ($'000,000) ($'000,000) $1,437 $719 $1,344 $651 $381 $863 Cu:$3.10 Cu:$2.49 Cu:$2.15 Au:$1,266 Au:$1,160 Au:$1,259 2013 2013 2014 2015 Q3'16 YTD Cu:$3.33* Au:$1,411* $78 ($631) 2013 2014 2015 Q3'16 Strong cash position Consecutive periods of pos
Slide 14: Production and financial guidance
Production and financial guidance 2016 2017 Copper in concentrates 201,300 tonnes (actual) 130,000 – 160,000 tonnes 175,000 – 195,000 tonnes Gold in concentrates 300,000 ounces (acutal) 100,000 – 140,000 ounces 255,000 – 285,000 ounces Operating cash costs $840 million* $720 million Capital expendit
Slide 15: Managing near-term ore grade challenges
Managing near-term ore grade challenges Phase 3 nearly complete (2017) Phase 6 and lower-grade stockpile ore processed mid-2016 to mid-2018 Phase 4 waste mining critical; uncovers 2017 medium-grade ore and 2018 high-grade ore Primary Crusher 2017-18 Ore (Phase 4a & 6, stockpiles) Waste Dumps Tailing
Slide 16: Oyu Tolgoi's impact in Mongolia
Oyu Tolgoi’s impact in Mongolia Mongolian Workforce Taxes and Fees In-country Spend 94% $1.6B $6.1B At the end of 2016, ~94% Between 2010 and 2016, Between 2010 and 2016, of Oyu Tolgoi’s workforce Oyu Tolgoi paid $1.6B in Oyu Tolgoi has spent was Mongolian taxes, fees and other $6.1B in Mongolia1 pa
Slide 17: Oyu Tolgoi – a long-term growth opportunity
Oyu Tolgoi– a long-term growth opportunity Underground development progressing Long-term development optionality and plant expansion opportunities Open-pit mine performing as expected in low gold areas Demonstrated productivity and cost improvements Oyu Tolgoi is the best copper asset in development
Slide 18: Appendix
Appendix
Slide 19: Approved underground CAPEX
Approved underground CAPEX $1.3 $1.2 $1.2 $1.0 $0.8 $0.5 $0.5 $0.3 $0.4 $0.4 $0.4 $0.3 Underground expansion capital, VAT and escalation of $5.3 billion Underground sustaining capital, VAT and escalation of $2.8 billion to full ramp-up expected in 2027 19
Slide 20: Project financing – flow of funds
Project financing – flow of funds At September 30, 20161 At project finance drawdown Payable to Turquoise Hill* Receivable from Oyu Tolgoi* Proceeds: $4.3 billion2 $4.3 billion3 $4.2 billion Shareholder loan: $2.9 billion Shareholder loan: $2.9 billion Payable to Turquoise Hill* Receivable from Oyu
Slide 21: Oyu Tolgoi at China's doorstep
Oyu Tolgoi at China’s doorstep 21