Jubilee Metals Group Plc · LSE:JLP
Jubilee Metals — Jubilee Platinum — Investor Presentation (November 2015)
19 slides from Jubilee Metals's investor presentation, November 2015
Slide 1: Jubilee Platinum Plc
JUBILEE PLATINUM Plc Jubilee Platinum Plc (“JPL”) is an AIM and AltX listed exploration and development company focussed on platinum in South Africa. 1
Slide 2: Disclaimer
Disclaimer Jubilee WO Platinum IMPORTANT NOTICE All reasonable care has been taken to ensure that the facts stated in these presentation materials are accurate and that any forecasts, opinions and expectations contained therein are fair and reasonable. Accordingly, no representation or warranty expr
Slide 3: Overview
Overview Platinum focused mines to metal company Division Ownership Tjate Platinum 63% owned Attributable 44Moz 6PGE+Au (targeted over total area) Two Platinum Surface Projects 100% owned 4.4 million tons at surface 40 000 oz PGE annually ConRoast 100% owned Platinum recovery process EXECUTED ASSET
Slide 4: Overview: Tjate Platinum
Overview Platinum focused mines to metal company PLATINUM EXPLORATION & MINING PROJECT Tjate Platinum • Attributable 44Moz 6PGE+Au (targeted over total area) • Concluded exploration drilling with 70 boreholes drilled • Top mining address • Mine Right application submitted
Slide 5: Overview: ASA Surface Platinum
Overview Platinum focused mines to metal company PLATINUM SURFACE PROJECT No 1 ASA Surface Platinum Material • 1.1 million tons already at surface and growing • Zero mining risk • Commenced constructing of 25 000 tons per month processing facility • Targeting 12 000 oz PGE per annum • Front end comm
Slide 6: Overview: Hernic Surface Platinum
Overview Platinum focused mines to metal company PLATINUM SURFACE PROJECT No 2 Hernic Surface Platinum Material • 3.3 million tons at surface and growing at 17 000 tons per month • Zero mining risk • Detail design concluded for processing facility of 55 000 tons per month • Targeting 31 000 oz PGE p
Slide 7: Jubilee's Strategy
Jubilee’s Strategy Platinum focused mines to metal company • Develop the two acquired surface platinum projects in the shortest time possible commensurate with quality engineering practice – construction underway targeting commissioning in 2016 • Earnings potential of USD 12 million per annum • 80 0
Slide 8: Jubilee's Surface Platinum Projects
Jubilee’s Surface Platinum Projects At-Surface Platinum Projects • Jubilee’s subsidiary Pollux Investments (Pty) Ltd a was awarded the rights by ASA Metals (ASA) to beneficiate the platinum from their Dilokong Chrome Mine (DCM) surface material and current arisings Estimated at 1 100 000 tons (Nov 2
Slide 9: Surface Platinum Projects: Hernic
Jubilee’s Surface Platinum Projects Hernic Hernic Dump and Surface stocks • 3.3 million tons resource estimate: 1.7 million tons SAMREC compliant in dump (1.6 million in measured category) 1.6 million tons surface stock – (Hernic estimate) • Further tailings being deposited onto the dam at estimated
Slide 10: Hernic Status
Jubilee’s Surface Platinum Projects Hernic Status • Jubilee executed a Heads of Agreement with Hernic to recover the PGM’s and chrome contained in the Hernic surface tailings material and current chrome tail arisings • Mining Right with Environmental Management Program granted. Surface Layouts for p
Slide 11: Surface Platinum Projects: ASA (DCM)
Jubilee’s Surface Platinum Projects ASA (DCM) ASA Dump and Surface stocks • 1.1 million tons resource estimate: 800 000 million tons fully drilled 1.1 million surface stock Nov 2014 – (ASA surveyed estimate) • Further tailings being deposited onto the dam at estimated rate of 11 500 tpm • Total 88 0
Slide 12: ASA (DCM) Status
Jubilee’s Surface Platinum Projects ASA (DCM) Status • Jubilee’s 100 % owned subsidiary Pollux Investments Pty Ltd a (Pollux) secured the exclusive right to recover the PGM’s and chrome contained in the Dilokong Chrome Mine (DCM) tailings • JTTC (Pollux) has Access Agreement with ASA & DCM to secure
Slide 13: Processing Plant (3D Layout)
Jubilee’s Processing Plant (3D Layout) Processing Plants Schematic PLATINUM AT SURFACE 13
Slide 14: Jubilee Surface Platinum Operations
Jubilee Surface Platinum Operations Combined Projects Overview • Targeted Combined Processing Capacity • Chrome beneficiation circuits 80 000 tpm • PGM recovery plants approximately 51 000 tpm • Estimated monthly ounce production 3 300 oz 4E (3PGM+Au) (39 600 oz per annum) • Capital Estimation • Cap
Slide 15: Strategy Threats
Strategy Threats Threat Comment • Platinum Price Outside our control but project de-risked by having no mining component with associated risk and cost • South African labour Small skilled operating labour teams easier to manage • Execution risk Projects turn key supervised by engineer who has built
Slide 16: Directors and Key Officers
Directors and Key Officers Leon Coetzer Chief Executive Officer BSc (Chemical Engineering), University of Stellenbosch Leon is a qualified chemical engineer. He joined Jubilee in August 2009 as Managing Director Refining and Smelting from Braemore Resources, where he was CEO. He has previously worke
Slide 17: Directors and Key Officers
Directors and Key Officers Andrew Sarosi Executive Director MSc Eng, MIIMM, CIMM (University of Witwatersrand, South Africa) Andrew is a mineral processing engineer and consultant with 35 years’ experience in developing, managing, commissioning and troubleshooting in gold and silver ore, tungsten, t
Slide 18: Compelling Investment Case
Compelling Investment Case • Jubilee a company with clear direction and focus • Process rights acquired to two significant bankable platinum surface projects • Forecasted earnings significant and sustainable • Tjate – One of the world’s largest undeveloped block of PGM’s: ascribed little value to co
Slide 19: Thank you
Thank you Jubilee Platinum
Jubilee Platinum — Investor Presentation (November 2015) on 6ix