Deltic Energy Plc · LSE:DELT

Deltic Energy — Investor Presentation (May 2025)

17 slides from Deltic Energy's investor presentation, May 2025

  1. Slide 1: Building Upon Exploration Success

    BUILDING UPON EXPLORATION SUCCESS MAY 2025

  2. Slide 2: Important Notice

    Important Notice The information contained in this document (the “Presentation”) has been prepared and distributed by Deltic Energy PLC (the “Company”). It has not been fully verified and is subject to material updating, completion, revision, verification and further amendment. This Presentation has

  3. Slide 3: Deltic – Unique investment opportunity within E&P sector

    Deltic – Unique investment opportunity within E&P sector Working towards development of UKCS Selene discovery – 25% Non-Op Interest Shell operated well discovered 174 BCF gas in the Leman Sandstone Management’s post-tax NPV10 is circa USD$83M1 net to Deltic Potential to deliver c. USD$210M of free c

  4. Slide 4: Board & Management

    Board & Management Driven and highly competent management team with >125 years of global experience Andrew Nunn Sarah McLeod Chief Executive Officer Chief Financial Officer Deltic’s COO for 10 years before becoming CEO in 2024 Joined Deltic as Chief Financial Officer in 2020 Chartered Geologist with

  5. Slide 5: Corporate Structure and Major Shareholders

    Corporate Structure and Major Shareholders AIM:DELT CAPITAL STRUCTURE MAJOR SHAREHOLDERS2 % Shares in Issue 93m IPGL (Michael Spencer) 18.8 Options 10m Hargreaves Lansdown 16.2 Free Float 80.8% Interactive Investor 13.2 Cash1 £1.4m Lloyds Banking Group 5.0 Debt NIL A J Bell 3.6 1 as at 31 December 2

  6. Slide 6: Licence P2437 Selene Gas Project

    LICENCE P2437 SELENE GAS PROJECT

  7. Slide 7: Selene Natural Gas Project (25% Deltic)

    Selene Natural Gas Project (25% Deltic) Material gas discovery progressing towards FID with world class operator Selene Barque Clipper 25% WI in Shell operated 48/8b-3Z (drilled 2H 2024) Simple development via licence P2437 in UK SNS Gross 2C Resources existing Barque gas field 174 BCF Bacton Farm-o

  8. Slide 8: Selene Gas Discovery – October 2024

    Selene Gas Discovery – October 2024 Third largest discovery in SNS since Tolmount in 2011 Shell operated discovery well 48/8b-3Z Gross 2C Resources of 174 BCF (1C-3C Range of 128 to 233 BCF) Key producing interval “B Sand” has better reservoir quality than pre-drill expectations c. 53m thick av. por

  9. Slide 9: Selene – Route to FID and Value

    Selene – Route to FID and Value Clearly defined technical and regulatory process to reach FID EXPLORE PLAN & PERMIT BUILD PRODUCE DECOMM YEAR 2024 2025 2026 2027 2028 2029 >2040 DISCOVERY FINAL FIRST GAS CESSATION OF P50 EUR 131 BCF INVESTMENT PRODUCTION DECISION FID is major milestone on route to f

  10. Slide 10: Selene – 2C Resource Economics

    Selene – 2C Resource Economics NPV10 of USD$83M and circa USD$210M of free cash flow in first 5 years – net to Deltic1 Development assumptions – 2C gas volumes, two horizontal development wells via NUI and new pipeline to Barque field Gross development CAPEX of circa USD$285 million with first gas p

  11. Slide 11: Endymion – on block exploration upside

    Endymion – on block exploration upside Deltic GIIP Recoverable Aug 2024 (BCF) Resources Low risk c. 70 BCF recoverable from Endymion Prospect (BCF) Layer P90 P50 P10 P90 P50 P10 A Sand 46.2 76.5 118 11.6 22.9 40.8 Direct analogue / structural extension of former Mimas gas field to south B Sand 55.7

  12. Slide 12: Reshaping the UK Portfolio

    Reshaping the UK Portfolio Minimise cost exposure and retain optionality POLICY CAN CHANGE, ASSET QUALITY REMAINS Licence P2646 – Dewar Prospect (Deltic 100% WI) , CNS AVO supported Forties Sandstone prospect Gross P50 Prospective Resources of 20.8 MMBO and 41% GCoS Effective from March 2024, Phase

  13. Slide 13: Blackadder – The next Selene

    Blackadder – The next Selene Missed pay opportunity de-risked by existing well Deltic GIIP Contingent Resources Q1 2025 (BCF) Development Unclarified (BCF) Deltic award P2672 in the 33rd at 100% WI Blackadder P90 P50 P10 1C 2C 3C Pharos – 47/05d-6 drilled in 2013, proved gas on the structure but wel

  14. Slide 14: Forward Strategy

    FORWARD STRATEGY

  15. Slide 15: Strategic Focus

    Strategic Focus Building a diversified, high impact and self-funding E&P company Reduce costs and extract value from UKCS licences Secure forward funding for Selene gas development to FID and beyond Relinquish non-core licences, reduce and/or defer spend Farm-down prior to Phase A spend on Blackadde

  16. Slide 16: Building a diversified, high impact and self-funding E&P

    Building a diversified, high impact and self-funding E&P Major value disconnect between Deltic share price and Selene project economics Deltic market cap of c. GBP£5M versus Selene Gas Project NPV10 of >GBP£60M net to Deltic Selene could deliver post-tax Free Cash Flow of GBP£135M net to Deltic duri

  17. Slide 17: Deltic Energy contact details

    Deltic E First Floor 150 Water! London — SE1 8SB United Ki

Deltic Energy — Investor Presentation (May 2025) on 6ix