Mcfarlane Lake Mining Limited · CSE:MLM

Mcfarlane Lake Mining — Investor Presentation (October 2025)

32 slides from Mcfarlane Lake Mining's investor presentation, October 2025

  1. Slide 1: Corporate Presentation October 2025

    CORPORATE PRESENTATION O C TO B E R 2 0 2 5

  2. Slide 2: Cautionary Note Regarding Forward-Looking Statements

    Cautionary Note Regarding Forward-Looking Statements This presentation of McFarlane Lake Mining Incorporated (the “Company” or “McFarlane Lake”) is for information only and shall not constitute an offer to buy, sell, issue or subscribe for, or the solicitation of an offer to buy, sell or issue, or s

  3. Slide 3: Cautionary Note Regarding Historical Estimates

    **Cautionary Note Regarding Historical Estimates • The historical production figures and resource estimates presented in this presentation release for the Juby Gold Project and Tyranite properties are considered historical in nature and have not been verified by a qualified person under NI 43-101. M

  4. Slide 4: Latest MRE – September 29, 2025

    Latest MRE – September 29,2025 US$2500/oz Au: 3.17 million inferred ounces gold at 0.89 gpt gold 1.01 million indicated ounces gold at 0.98 gpt gold (See Table 1 and note 1) Resource Sensitivities at US $3750/oz gold yield: Juby Timmins 4.22 million inferred ounces at 0.85 gpt gold 1.2 million indic

  5. Slide 5: The Juby Project has all infrastructure to support a district scale mining camp

    The Juby Project has all infrastructure to support a district scale mining camp IT CHECKS ALL THE BOXES ✓ INFRASTRUCTURE – POWER, ROADS ✓ POPULATION BASE 25,000 WITHIN 100 KM ✓ +90% METALLURGICAL RECOVERIES ✓ PRODUCTION OPTIONALITY ✓ HIGH GRADE OPEN PIT STARTER OPTION WITH DIRECT SHIPPING OF ORE ✓ 1

  6. Slide 6: Located amongst Canada's Largest Gold Mines in Prolific Abitibi Greenstone Belt

    Located amongst Canada’s Largest Gold Mines in Prolific Abitibi Greenstone Belt that has produced >200Moz Major Fault Zones ➢ 116,000 meters drill to date ➢ Drill core and drill logs in tack for review CSE: MLM OTCQB: MLMLF 6

  7. Slide 7: Community & Environment

    Community & Environment First Nations Early Exploration • Discussion on Exploration Agreements • Transparency on plans with regular updates Employment and training • Employing skilled First Nations talent for upcoming programs • Implementing best-in-class advanced training programs Environmental Ini

  8. Slide 8: Table 1 – Detail Mineral Resource Estimate

    Table 1 – Detail Mineral Resource Estimate within pit shell + underground shapes (OP= Open Pit, UG= Underground, Mt= Millions tonnes, Moz= Millions Ounces, Au= Gold metal) Cut-Off Grade Contained Tonnage Constraints Grade (Au Metal (Mt) (Au g/t) g/t) (Moz) Indicated OP 0.25 30.78 0.94 0.93 Indicated

  9. Slide 9: Table – Gold Price Sensitivities

    Table 2 – Gold Price Sensitivities (OP= Open Pit, UG= Underground, Mt= Millions tonnes, Moz= Millions Ounces, Au= Gold metal) Gold Revenue Cut-Off Tonnage Grade Contained Price Factor Classification Constraints Grade (tonnes) (Au g/t) Metal Oz ($USD) (RF) (Au g/t) Indicated OP/UG 0.25/1.90 27,317,00

  10. Slide 10: Potential MRE Growth

    +10Moz Potential Target +10.0MAT oz Au MRE Growth 8Moz ~ 1 g/t Au Potential 6Moz Resource 2025 Based on Geological 4Moz 0.25 COG @ $2500 Au Modeling Review this 2Moz IND: 1.01 M oz Au @ 0.98 g/t is what we are INF: 3.17 M oz Au @ 0.89 g/t targeting *MINERAL RESOURCE ESTIMATE FOR THE JUBY GOLD PROJEC

  11. Slide 11: Prolific Abitibi Greenstone Belt >200 Moz Au

    Prolific Abitibi Greenstone Belt >200 Moz Au JUBY PROPERTY Excellent access to infrastructure and experienced workforce CSE: MLM OTCQB: MLMLF 11

  12. Slide 12: Shining Tree Geology

    SHINING TREE GEOLOGY Ridout-Tyrrell JUBY PROPERTY Deformation Zone (RTDZ) Porcupine Assemblage 2690-2680 Ma Sediments and Felsic Intrusions CSE: MLM OTCQB: MLMLF 12

  13. Slide 13: Four Gold Deposits

    FOUR GOLD DEPOSITS HYRDO CREEK BIG DOME GOLDEN LAKE JUBY CSE: MLM OTCQB: MLMLF 13

  14. Slide 14: RTDZ – What Does It Look Like?

    RTDZ – WHAT DOES IT LOOK LIKE? Deformation - Shearing - Folding JUBY HYDRO CREEK CSE: MLM OTCQB: MLMLF 14

  15. Slide 15: More Gold - Parallel Structures

    MORE GOLD - PARALLEL STRUCTURES A – 826 Zone 0.85 g/t Au over 36.30m B B – Byberg Mining Lease Grabs up to 7.54 g/t D Au C – Juby Mining C Lease Grabs up to 17.60 g/t Au PARALLEL STRUCTURES? A 2.5km D – What is under the glacial sand and gravel CSE: MLM OTCQB: MLMLF 15

  16. Slide 16: Top Drill Hole Intersections that make Juby Golden

    Top 10 Drill Hole Intersections that make JUBY Golden (Data below is considered historical see note regarding historical estimate referenced herein**) GT Hole ID From (m) To (m) Length Au g/t (grade x Deposit thickness) G05-22 199.20 202.64 3.44 130.06 447.41 Big Dome High Grade Potential GL-18-44 1

  17. Slide 17: Cross-Section

    CROSS-SECTION 1.12 g/t Au over 1.20 g/t Au over 37.38m 47.70m 1.38 g/t Au over 42.41m 1.14 g/t Au over 1.23 g/t Au over 94.04m 75.13m CSE: MLM OTCQB: MLMLF 17

  18. Slide 18: Many Rock Types Host Gold

    MANY ROCK TYPES HOST GOLD QUARTZ FELDSPAR PORPHYRY MAFIC VOLCANICS 2.86 g/t Au over 6.63m (191.12m-197.75m) 5.78 g/t Au over 12.50m (46.4m-60.40m) DIORITE-MONZONITE-GRANODIORITE SEDIMENTS (HARE LAKE AND MILLY CREEK INTRUSIONS) 0.29 g/t Au over 78.75m (447.00m-525.75m) 5.53 g/t Au over 3.20m (426.30m

  19. Slide 19: High Grade Open Pit Potential – Early Ore Shipping

    HIGH GRADE OPEN PIT POTENTIAL – EARLY ORE SHIPPING ( Over 1 million ounces of HIGH GRADE GOLD within open pit shells Resource Contained Resource Contained Cut-Off Au g/t Cut-Off Au g/t Classification Metal Au Oz Classification Metal Au Oz indicated 1.25 2.09 inferred 1.25 2.11 479,000 1,081,000 indi

  20. Slide 20: Open at Depth

    OPEN AT DEPTH Gold deposits in Abitibi Greenstone Belt can extend well below depth of 3,000m Deepest ore body 750m 8.7km Hydro Creek Big Dome Golden Lake Juby ~300 m 750m Open at depth & along strike 0.25 g/t Au cutoff 1 Km 20

  21. Slide 21: More Gold - Conceptual HG Targets @ Juby Main

    More Gold - Conceptual HG Targets @ Juby Main • Potential to step-out from higher grade areas at Juby Main (green below) • Estimated ~5,000 m in 9 drillholes to test targets Mineralization >3 gpt Au Grade Shells at 1.5 gpt Au CSE: MLM OTCQB: MLMLF 21

  22. Slide 22: Excellent metallurgy recoveries

    Excellent metallurgy 93.4% 91% recoveries Au Re c ove r y C ya n i d e + GOLD RECOVERY GOLD RECOVERY G r av i t y w i t h provides process 25 microns Juby GOLDEN plant optionality Deposit LAKE Partical Head Au Au Recovery Zone Size P80 Grade Recovery CN + Gravity mircon Au Gravity OPPORTUNITY Pa s t

  23. Slide 23: Juby Gold Project Ontario Site Infrastructure Concept

    Juby Gold Project Ontario Site Infrastructure Concept ( Data below is considered historical see note regarding historical estimate referenced herein**) What would it look like? CSE: MLM OTCQB: MLMLF 23

  24. Slide 24: Potential MRE Growth

    +10Moz Potential Target +10.0MAT oz Au MRE Growth 8Moz ~ 1 g/t Au Potential 6Moz Resource 2025 Based on Geological 4Moz 0.25 COG @ $2500 Au Modeling Review this 2Moz IND: 1.01 M oz Au @ 0.98 g/t is what we are INF: 3.17 M oz Au @ 0.89 g/t targeting *MINERAL RESOURCE ESTIMATE FOR THE JUBY GOLD PROJEC

  25. Slide 25: The Path to Developing Ontario's Next Gold Deposit

    The Path to Developing Ontario's Next Gold Deposit 2025 Q3 Q4 2026 ✓ Acquisition + 43-101 Q1 Q2 2026 update (completed) ✓ Infill & exploration drilling Q3 Q4 ~ 10-20k meters 2027 ✓ Drilling by Dec 2025 ✓ Advanced Exploration Permit Q1 Q4 (permit application in) ✓ Baseline water study ✓ Feasibility ✓

  26. Slide 26: Capital Structure

    Capital Structure Rob McEwen and Frank Giustra participated in Past Financings As of May 2025 Shares Outstanding 419,000,000 Warrants 102,000,000 Options 24,525,000 Fully Diluted 545,525,000 Market Capitalization $50-60 M (fully diluted) 26

  27. Slide 27: Questions?

    QUESTIONS? CSE: MLM OTCQB: MLMLF McFarlane Lake Mining Limited 27

  28. Slide 28: Proven Management Team

    Proven Management Team LED BY A TEAM WITH EXPERIENCE Mark Trevisiol Brad Boland Winston Whymark Andrew McLellan, MSc President, CEO, Chair of Board CFO, Secretary Manager Exploration Senior Geologist Andrew is a geologist with 15 years Over 30 years of experience in mining and Over 25 years of exper

  29. Slide 29: Experienced Board

    Experienced Board Perry Dellelce Amanda Fullerton Deborah Battiston Director Director Director Mr. Dellelce is a founder and the managing Ms. Fullerton has been the Vice President, Ms. Battiston is a CPA and an ICD.D (“Institute of partner of Wildeboer Dellelce LLP, one of Legal & Corporate Secretar

  30. Slide 30: Experienced Board

    Experienced Board Fergus Kerr Dario Zulich Roger Emdin P.Eng Director Director Director Mr. Zulich is an accomplished entrepreneur and community 30+ years of senior management and Mr. Kerr is a Professional Mining Engineer and is leader who has made significant contributions to the sports operating

  31. Slide 31: Notes to MRE Tables

    NOTES TO MRE for Tables 1 and 2 (OP= Open Pit, UG= Underground, Mt= Millions tonnes, Moz= Millions Ounces, Au= Gold metal) Note 1: Mineral Resource Statement Notes 1. CIM definition standards were followed for the resource estimate. 2. This Mineral Resource has an effective date of September 29, 202

  32. Slide 32: Project Chronology – Three Decades Later

    PROJECT CHRONOLOGY – THREE DECADES LATER 116,000 METERS OF DRILLING Temagami Land 1998-2012 Caution 1973-1995 2021 2002-2013 Shining Tree area 2018 withdrawn from mineral exploration CSE: MLM OTCQB: MLMLF 32

McFarlane Lake Mining — Investor Presentation (October 2025) on 6ix