18 slides from Eagle Mountain Mining's investor presentation, Oct 6, 2022

  1. Slide 1: Oracle Ridge Mineral Resource Update

  2. Slide 2: Disclaimer

    This presentation has been prepared by Eagle Mountain Mining Limited (ACN 621 541 204) (Eagle Mountain) and should be read in conjunction the Company’s Annual Report, issued by Eagle Mountain 22 October 2021 and subsequent ASX announcements made by the company. This presentation is not investment ad

  3. Slide 3: Underground refurbishment works in progress – September 2022

    • • • • • Underground refurbishment works in progress – September 2022

  4. Slide 4: Resource update highlights

    • • • • • Refer Appendix 1 Refer ASX Announcement 6 October 2022

  5. Slide 5: 11.9m at 2.94% Cu, 42.6g/t Ag, 0.49g/t Au

    − 11.9m at 2.94% Cu, 42.6g/t Ag, 0.49g/t Au, including ▪ 3.3m at 7.0% Cu, 98g/t Ag and 1.01g/t Au − 19.1m at 2.23% Cu, 34.1g/t Ag, 0.43g/t Au, including ▪ 9.3m @ 3.63% Cu, 59.6g/t Ag and 0.76g/t Au − 0.7m at 16.9% Cu, 136g/t Ag and 0.25g/t Au − 10.7m at 1.97% Cu, 23.4/t Ag and 0.32/t Au − 3.3m at 3.

  6. Slide 6: Improving grades with higher confidence categories

    Improving grades with higher confidence categories Resource Tonnes Cu Ag Au Contained Cu Contained Ag Contained Au Category [Mt] [%] [g/t] [g/t] [t] [Oz] [Oz] Measured 2.1 1.57 16.42 0.21 33,000 1,111,000 14,000 65% of the Resource is Indicated 8.7 1.49 14.94 0.21 129,000 4,178,000 59,000 in Measure

  7. Slide 7: October 2022 Updated JORC Resources

    Refer ASX Announcement 6 October 2022 October 2022 Updated JORC Resources (Measured + Indicated + Inferred)

  8. Slide 8: JORC Resources at 1% Cu cut-off

    Refer ASX Aannouncements 14 December 2020, 10 March 2022 and JORC Resources at 1% Cu cut-off (Measured + Indicated) 6 October 2022

  9. Slide 9: Refer ASX Announcement 6 October 2022

    Refer ASX Announcement 6 October 2022

  10. Slide 10: Significantly improved geological model

    SIGNIFICANTLY JMPROVED GEOLOGICAL MEL wa EAGLE MOUNTAIN MINING 95 new diamond holes since previous update Significantly improved drill targeting Many prospective areas remain untested 23 holes pending assays - ongoing expansion and upgrade potential Drilling continues with focus on upgrading and exp

  11. Slide 11: Refer ASX Announcement 6 October 2022

    Refer ASX Announcement 6 October 2022

  12. Slide 12: Refer ASX Announcement 5 October 2022

    Refer ASX Announcement 5 October 2022

  13. Slide 13: October 2022 timeline

    October 2022 Underground Commence JORC Resource Refurbishment Underground Update Tailings Dam Commence Pre- commenced Drilling Design / Permitting Feasibility Study Underground Commenced Sampling Metallurgical Testwork Commenced OREX Drilling Commences (subject to permits) 2022 Surface Drilling Prog

  14. Slide 14: Artisanal Mine at OREX target area

    • • Artisanal Mine at OREX target area (outside resource) • • Refer ASX Announcement 16 April 2021 Outcropping mineralisation near the Daily Mine area (outside resource)

  15. Slide 15: Appendix: Drilling results references

    Refer ASX Announcements 16 April 2021, 29 July 2021, 31 August 2021, 12 January 2022, 3 March 2022, 15 March 2022 and 20 April 2022

  16. Slide 16: The Eagle Mountain Opportunity

    THE EAGLE MOUNTAIN OPPORTUNITY Copper: in-demand commodity in short supply Limited copper projects in development Low disturbance as an underground operation Low emission mine potential Tier 1 jurisdiction Prospective geology JORC Resources continue to grow Previously mined Existing infrastructure f

  17. Slide 17: Announcement approved for release by the Board

    This Announcement has been approved for release by the Board of Eagle Mountain Mining Limited

  18. Slide 18: Competent Person and JORC compliance statement

    The Company’s Mineral Resource Statement has been compiled in accordance with the Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code 2012) and Chapter 5 of the ASX Listing Rules and ASX Guidance Note 31. The Company has no Ore Reserve estimates. T

Eagle Mountain Mining — Investor Presentation (October 2022) on 6ix