  1. Slide 1: 2018 Karowe Mineral Resource Update

    2018 KAROWE MINERAL RESOURCE UPDATE June 27, 2018 1

  2. Slide 2: Cautionary Statement

    Cautionary Statement Forward‐looking information CAUTIONARY NOTE REGARDING FORWARD LOOKING STATEMENTS Certain of the statements made and contained herein and elsewhere constitute forward-looking statements as defined in applicable securities laws. Generally, these forward- looking statements can be

  3. Slide 3: 2018 Updated Mineral Resource

    2018 Updated Mineral Resource • Mineral Resource Update prepared in accordance with National Instrument M/PK(S) 43-101 (NI 43-101) EM/PK(S) • Successful reclassification to Indicated Resource of the AK06 kimberlite between 600 and 400 metres above Base LoM OP sea level (masl) 600 masl OLD Base IND •

  4. Slide 4: Mineral Resource Statement

    Mineral Resource Statement Table 1: Statement of Remaining Mineral Resources in the AK06 kimberlite The reported resources are those remaining (including stockpile material) as of 26 December 2017. 1. m3 = million cubic metres, 2. tpm3 = tonnes per cubic metre, 3. Mt = million tonnes, 4. Mct = milli

  5. Slide 5: Mineral Resource Statement: South Lobe

    Mineral Resource Statement: South Lobe Table 1: Statement of Remaining Indicated Mineral Resources in the South Lobe: AK06 kimberlite The reported resources are those remaining (including stockpile material) as of December 2017. 1. m3 = million cubic metres, 2. tpm3 = tonnes per cubic metre, 3. Mt =

  6. Slide 6: Highlights

    Highlights • 7.9 million carats hosted in 57.85 million tonnes, at an average grade of 13.7 cpht with an average diamond value of US$ 673 per carat • New base of the Indicated Mineral Resource is at 400 masl (600 metres below surface) • Updated size distribution and value models which reflect diamon

  7. Slide 7: Geological Model Update

    Geological Model Update • The 2018 pipe shell model is defined by a total of 154 pierce points in 71 core drill holes North • The shell extends from surface (1000 masl) to an elevation of 256 masl Centre • The EM/PK(S) domain represents approximately 23% (by mass) of the South pipe infill above 600

  8. Slide 8: South Lobe Geological Model Update

    South Lobe Geological Model Update 2018 Model with 2013 EM/PK(S) 2018 Model 923 Elev M/PK(S) M/PK(S) EM/PK(S) 2 0 1 3 E Base LOM Pit 720masl M 720masl P 2013 Base IND K 600masl S 600masl EM/PK(S) EM/PK(S) 400masl 2013 Base INF 2018 Base IND 400masl 2018 Base INF 8

  9. Slide 9: Grade Estimates

    Grade Estimates • Grade estimates above 600 masl are restated with minor modifications from the previous Mineral Resource Estimate. Grades are based on a well-distributed LDD sample dataset that supports the interpolation of a local grade model into the block model • Below 600 masl grade has been es

  10. Slide 10: Mining: Impact of EM/PK(S)

    Mining: Impact of EM/PK(S) • Gain in mining along SE quadrant of South Lobe, 472 ct recovered grade circa 17- 20cpht, coarse SFD (>6 wt.% up to 10 wt.%), good plant throughput, moderate yield 327 ct • Recovery of a number of high value diamonds, major contribution to Q2 revenue has been realized, on

  11. Slide 11: EM/PK(S) Impact

    EM/PK(S) Impact South Lobe Plan View : 920masl TR_O1 Nov/15 • 02/18 Sampling of EM/PK(S), coarse SFD (9.5wt.% specials), MPKS • 47 diamonds > 10.8ct, 6>50ct, 1>100ct • Observed price per carat of $753/ct • Nov 2015 – TR_O1 – now shown to to lie within EMPKS : circa $150 million in EMPKS revenue, pro

  12. Slide 12: Recoverable Grade Models with depth

    Current Sump Recoverable Grade Models with depth LoM Pit Base Above 600masl –soft boundaries 2013 INF Below 600masl – hard boundaries Increase in South Lobe grade results from greater 2018 IND Base volume of EM/PK(S) 12

  13. Slide 13: Diamond Value / SFD’s

    Diamond Value / SFD’s • In excess of 2 million carats of diamond produced from AK6 have been sold up to the end of Q1 2018 generating revenues of US$1.25 billion for an average price of US$606 per carat • 168 diamonds have sold for > US$1 million each

  14. Slide 14: Consistency

    Ns LUCARA DIAMOND Consistency $/CT CONTRIBUTION TO OVERALL AVERAGE PRICE * REGULAR $/Total Ct Sold EXCEPTIONAL $/Total Ct Sold 700 600 500 400 300 200 100 2012 2013 2014 2015 2016 2017 2018** 14 Sct °

  15. Slide 15: Production Data for SFD Models

    Production Data for SFD Models 15

  16. Slide 16: Value Models

    Nise Value Models i LUCARA DIAMOND Size Class Value estimate (USS per carat) Value distribution model (USS per carat) North Centre South North Centre South +10.8ct' 1,425 5,849 20D 1,600 6,050 6-10ct 1,033 1,082 1,064 1,127 1,357 1,218 3-5ct 753 623 671 808 651 677 8-10er 451 406 438 484 436 445 3-6

  17. Slide 17: Recoverable Average Price Models

    Recoverable Average Price Models Average value Lobe (US$/ct) North 222 Centre 367 South 716 A single size distribution model and a single value distribution model has been used to estimate average value in the South Lobe. This approach may be revised as more discrete production and sales results bec

  18. Slide 18: Summary

    Summary • Consistent recovery of large high-value diamonds through top 100 m of mining in South Lobe • Confirmation of large high-value diamonds in both main kimberlite units of the South Lobe • Continuity of these main units throughout the open pit resource and now down to at least 400 masl • Conti

  19. Slide 19: Next Steps

    Next Steps • Mineral Resource Update will be used for mine planning and to support the preparation of feasibility- level studies for the potential development of an underground mine • An updated LOM open pit plan will be developed • Additional studies to determine a drill program to increase geologi