Fathom Nickel, Inc. · CSE:FNI

Fathom Nickel — Investor Presentation (October 2022)

23 slides from Fathom Nickel's investor presentation, Oct 3, 2022

  1. Slide 1: Fathom Nickel Inc. Corporate Presentation

    “Finding Nickel in the Shadows of Historic Deposits” October, 2022 Fathom Nickel Inc. Corporate Presentation Nickel Exploration in Saskatchewan, Canada CSE:FNI FSE:6Q5 OTC:FNICF

  2. Slide 2: Notice to Reader

    Notice to Reader Certain information set forth in this presentation contains “forward-looking information”, including Although forward-looking statements contained in this presentation are based upon what “future oriented financial information” and “financial outlook”, under applicable securities la

  3. Slide 3: Fathom Nickel Inc.

    Fathom Nickel Inc. Exploration Focused on Two Historic Exploration Company Focused on New Discovery at Flagship Albert Lake Nickel Sulphide Deposits in Discovering Battery Metals to Support Project a 300m Mineralized Corridor Saskatchewan; Top Tier Mining the Green Economy Similar to Past Producer o

  4. Slide 4: Nickel Supply & Demand Imbalance

    Nickel Supply & Demand Imbalance Nickel Demand Growth (Mt) Supply Lag in Nickel Production 400 507.0 ▪ Nickel and PGE’s are experiencing an unprecedented demand 9.2 as part of the global electrification and decarbonisation effort ▪ Canada’s federal budget will include a $1.6B investment to execute o

  5. Slide 5: Fathom’s Properties Geological Setting

    Fathom’s Properties Geological Setting Trans Hudson Lynn Lake (Ni) Corridor Albert Lake (Ni) Thompson (Ni) ` Seabee (Au) Snow Lake (VMS, Au) Flin Flon (VMS, Au) Gochager (Ni) ` ▪ Host to numerous world-class Nickel mining camps including ▪ Thompson Nickel Belt (operating) ▪ Lynn Lake; and, Homestake

  6. Slide 6: Albert Lake Property

    ALBERT LAKE PROPERTY Fathom Nickel | 6

  7. Slide 7: Flagship Nickel Exploration Project: Albert Lake

    Flagship Nickel Exploration Project: Albert Lake ▪ Well-situated land package of 91,545 hectares in Trans Hudson Corridor – host to numerous world-class mining camps ▪ Recently added to disposition by staking the “strategic” Tremblay- Olson mineral claims ▪ Home to Historic Rottenstone Mine ▪ Rotten

  8. Slide 8: Historic Rottenstone Deposit Part of Significant Magmatic Nickel Sulphide System

    Historic Rottenstone Deposit Part of Significant Magmatic Nickel Sulphide System The “Hill of Rottenstone” – Small (26,000 tonnes: 3.28% Ni, 1.83% Cu, 9.63 g/t Pd-Pt+Au) Isolated Magmatic Ni Sulphide Showing Rottenstone Deposit (1960) (1882 ppm Ni, 842 ppm Cu 122 ppm Co, 228 ppb Pd-Pt / 2.4 m) >300m

  9. Slide 9: Bay – Island Trend

    Bay – Island Trend ▪ New mineralized UM intrusive 400 – 500m west-northwest of historic Rottenstone deposit ▪ “Keel-like” body defined 300+ meters of strike, open along strike to NE and SW and open across strike ▪ Consistent mineralized intervals up to 18.0m thick ▪ AL22052: intersected 0.62% Ni, 0.

  10. Slide 10: Summer 2022 and Historical Drill Holes

    Summer 2022 and Historical Drill Holes Drillhole Id Location From (m) To (m) Interval (m) Ni% Cu % Co (ppm) 3PE (g/t) NiEq % AL22060 Bay-Island 74.00 75.00 1.00 0.20 0.20 133 0.17 0.33 AL22061 Bay-Island 65.72 70.25 4.53 0.15 0.08 80 0.65 0.21 AL22062 Bay-Island 104.13 109.85 5.72 0.23 0.11 127 0.21

  11. Slide 11: Intersections of Magmatic Nickel Sulphide Textures (Q1 – Q3 2022)

    Intersections of Magmatic Nickel Sulphide Textures (Q1 – Q3 2022) AL22040_121.14m; 0.44% Ni, 0.36% Cu, 0.31 g/t PGE AL22052_99.03m; 1.19% Ni, 0.46% Cu, 0.54 g/t PGE Barnes, Lightfoot (2005) ▪ 2017 Metallurgical study*: ▪ 23kg of Rottenstone Matrix AL22051_108.99m; 2.13% Ni, 0.22% Cu, 1.73 g/t PGE Te

  12. Slide 12: Bay – Island Trend Mineralized Corridor and Beyond

    Bay – Island Trend Mineralized Corridor and Beyond ▪ Current geologic model defines mineralization Bay-Island Trend – Additional occurring in “keel-like" Mineralized UM Sills Favourable Stratigraphy fold hinges within a broad synformal The Bay– Island Trend (parasitic) fold structure ▪ Strong suppor

  13. Slide 13: Gochager Lake Property

    GOCHAGER LAKE PROPERTY Fathom Nickel | 13

  14. Slide 14: Gochager Lake Nickel Project

    Gochager Lake Nickel Project ▪ Nickel-Copper-Cobalt project consisting of 4,696 hectare in north-central Saskatchewan ▪ Approx. 75 km north of the town of La Ronge ▪ Estimated 149+ historic drillholes totaling ~27,000 meters ▪ Historical resource estimates in 1968 and 1990 (1) ▪ 1968: resource estim

  15. Slide 15: Gochager Notable Drilling Results

    Gochager Notable Drilling Results Drillhole From (m) To (m) Width (m) Ni% Cu% Co% NiEq %* I-12 3.70 294.10 290.40 0.581 0.113 - 0.62 Including 88.80 123.10 34.30 1.040 0.217 - 1.11 Including 150.00 157.60 7.60 1.503 0.326 0.103 1.83 Including 282.90 292.60 9.70 2.369 0.350 0.143 2.79 Including 99.50

  16. Slide 16: Gochager Lake Deposit Engulfed by Significant Untested Conductors

    Gochager Lake Deposit Engulfed by Significant Untested Conductors Maxwell Plate Modelling of Conductors Associated Note Maxwell Plate Model(s) associated with deposit, with the Gochager Lake Deposit and Surrounding depth to top -14m, steep dip, and slightly oblique to Conductors ( on EM BF Ch 20 Gri

  17. Slide 17: Albert Lake Exploration Program – Moving Forward

    Albert Lake Exploration Program – Moving Forward Heli – EM Survey Data interpretation Completed Planning Mid-September field program – mapping, Planning – Q1 2023 Surface prospecting, B-horizon soil Drilling Program at s Exploration geochemistry at Tremblay- Rottenstone North, Bay- Olson claims Isla

  18. Slide 18: Fathom Leadership Team

    Fathom Leadership Team Ian Fraser, P.Geo. – CEO, VP Exploration, Director Doug Porter, CPA, CA – President, CFO, Director ▪ Co-founder of Fathom Nickel, 35+ Years of mineral ▪ Senior Financial/ Accounting executive with specific exploration, managing / implementing exploration emphasis in resource c

  19. Slide 19: Capitalization Structure

    Capitalization Structure Current Cap Table Shares % Management & Insiders 4,762,296 7.1% Investors 50,549,097 75.1% Total Basic Shares Outstanding 55,311,393 82.6% Management & Insider Options 3,075,000 4.5% Broker Compensation Options 1,351,699 2.0% Warrants(1) 7,594,349 11.3% Interest Bearing Debt

  20. Slide 20: Appendix

    Appendix. Fathom Fathom Nickel | 20

  21. Slide 21: Soil – Treetop Geochemistry Integral Step in Defining the Bay Area Corridor

    Soil – Treetop Geochemistry Integral Step in Defining the Bay Area Corridor – More to Discover Ni, Cr, Pd-Pt in Soils Powerful Tool in the Fathom Exploration Toolbox Fathom Nickel | 21

  22. Slide 22: 3000m x 500m of Prospective Ground – Tremblay Olson

    3000m x 500m of Prospective Ground – Tremblay Olson Pyroxenite Island Bay Area Corridor Rottenstone Mine Bay Area Conductive Corridor Rottenstone Mine Tremblay-Olson Target Area defined by complex folding and favourable geologic contact. Fold nose “keels” of fold structures the target for additional

  23. Slide 23: Thank You.

    Thank You. For more Information, please contact: Ian Fraser Doug Porter Manish Grigo CEO, VP Exploration, Director President & CFO Corporate Development ifraser@fathomnickel.com dporter@fathomnickel.com mgrigo@fathomnickel.com Suite 730, 521 – 3rd Ave SW Calgary, Alberta T2P 3T3 CSE:FNI FSE:6Q5 OTC:

Fathom Nickel — Investor Presentation (October 2022) on 6ix