Slide 1: Advancing the Filo del Sol Copper-Gold-Silver Project in South America
ADVANCING THE FILO DEL SOL COPPER-GOLD-SILVER PROJECT IN SOUTH AMERICA Corporate Presentation – March 2020 A Lundin Group Company www.filo-mining.com TSXV: FIL | Nasdaq First North Growth Market: FIL
Slide 2: Cautionary Statement
CAUTIONARY STATEMENT Certain statements made and information contained in this presentation constitutes “forward-looking information” and “forward- Estimates of Mineral Reserves and Mineral Resources looking statements” within the meaning of applicable securities legislation (collectively, “forward-
Slide 3: Filo Mining Corp. Company Profile
FILO MINING CORP. COMPANY PROFILE South American Project – Filo de Sol (100% interest) Current Indicated Resource of: Advanced Exploration » 4.4m Ounces of Gold » 147m Ounces of Silver Company » 3.1b Pounds of Copper 7% CAPITAL STRUCTURE SHARE OWNERSHIP FIL TSXV, Nasdaq First North Growth Market Top
Slide 4: Filo del Sol Project
FILO DEL SOL PROJECT Filo del Sol hosts a high-sulphidation epithermal copper-gold-silver deposit associated with a large porphyry copper-gold system. Located in San Juan, Positive PFS Released Argentina & Chile January 2019 » Pro-mining jurisdictions » Heap Leach – oxides only » Mining Integration
Slide 5: Exploration
EXPLORATION Filo Mining | Corporate Presentation | February 2020
Slide 6: 2019 / 2020 Field Program Plans
2019 / 2020 FIELD PROGRAM PLANS Plans » Approximately 10,000m of drilling planned – diamond & RC » Drone magnetometer & 3D induced polarization ("IP") geophysical surveys Targets Filo Deep Area Tamberias West Filo North Three holes Recently permitted Strong alteration underway & testing epithermal a
Slide 7: 2018/2019 Drilling Results
2018/2019 DRILLING RESULTS See News Release dated March 18, 2019 entitled “Filo Mining Drills 1,025 Metres of See News Release dated May 17, 2019 entitled “Filo Mining Drill 548 0.30% Copper and 0.22 g/t Gold at Filo del Sol – Demonstrating the Presence of a Metres of 0.40% Copper and 0.78 G/T Gold
Slide 8: 2019 / 2020 Initial Drill Results
2019 / 2020 INITIAL DRILL RESULTS PARTIAL ASSAYS FOR THE COMPLETED PORTIONS OF THE FIRST TWO HOLES: » Both holes are planned to a depth of FSDH032: highlight intercept FSDH033: highlight intercept 1,000m: note that the “highlight of 600m @ 0.67% Cu, 0.44 g/t of 50m @ 1.31% Cu, 0.68 intercepts” occur
Slide 9: 2019 / 2020 Results & Additional Targets
2019 / 2020 RESULTS & ADDITIONAL TARGETS ADDITIONAL HOLES UNDERWAY / COMPLETE: Slide 9 Filo Mining | Corporate Presentation |
Slide 10: Comparison with Global Copper Intercepts
COMPARISON WITH GLOBAL COPPER INTERCEPTS Best holes over the past 12 months with Copper as the primary commodity CuEq Grade x Date Hole Number Project Country Company From (metres) To (metres) Interval (metres) CuEq (%) Source Document Interval¹ (%-m) 2019-07-25 AK-19-031 AntaKori Peru Regulus Resou
Slide 11: Potential to Extend Resource
POTENTIAL TO EXTEND RESOURCE FSDH025 TO VRC093 IS 3KM LONG AND REPRESENTS AN UNTESTED TARGET AT DEPTH » Successful 2018/19 drill campaign extended depth of mineralization to 1,025m » Resource remains open North to South and at depth • Continuous mineralization - Potential strike length could increas
Slide 12: Exploration Plan
EXPLORATION PLAN » New interpretation from 2018/19 surface geology mapping » Supported by new 3D IP data » Opens expansion potential to North East (NE) and South West (SW) » SW “Tamberias West” to be tested by RC drilling » NE stepping out from successful FSDH032 Slide 12 Filo Mining | Corporate Pre
Slide 13: Indicated and Inferred Resource
INDICATED AND INFERRED RESOURCE Cu 3.1 Billion lbs Cu Copper INDICATED Cu INFERRED 1.0 Billion lbs Au Au INDICATED 4.4 Million oz Au Gold INFERRED 1.8 Million oz Ag Ag INDICATED 146.9 Million oz Ag Silver INFERRED 34.8 Million oz Refer to slide 13 for additional details regarding the reporting of th
Slide 14: Mineral Resource
MINERAL RESOURCE Tonnes Cu Au Ag Lbs Cu Ounces Au Ounces Au Zone Cutoff Category (millions) (%) (g/t) (g/t) (millions) (thousands) (thousands) Indicated 349.6 0.34 0.32 12.6 2,656 3,623 141,364 Oxide * See notes Inferred 103.9 0.26 0.32 8.7 585 1,083 29,067 Indicated 75.5 0.27 0.34 2.2 451 813 5,374
Slide 15: Positive PFS (Jan 2019)
POSITIVE PFS (JAN 2019) Filo Mining | Corporate Presentation | February 2020
Slide 16: Filo del Sol – PFS Results Summary
FILO DEL SOL – PFS RESULTS SUMMARY Cu Copper After-Tax NPV (8%) $1.28b Avg. Annual Cu Production 67 kt Au Gold After-Tax IRR 23% Payback 3.4 Yrs Avg. Annual Au Production 159 koz Ag Silver C1 Cash Cost $1.23/lb CuEq Avg. Annual Ag Production 8,653 koz Slide 16 Filo Mining | Corporate Presentation |
Slide 17: Pre-Feasibility Results
PRE-FEASIBILITY RESULTS FILO DEL SOL – PFS RESULTS – January 2019 Pre-Tax NPV (8%) ($B) $1.86 ANNUAL METAL Pre-Tax IRR (%) 27% PFS METALS PRODUCTION PROFILES After-Tax NPV (8%) ($B) $1.28 PRICES ASSUMED Payable Copper After-Tax IRR (%) 23% 90 80 70 Undiscounted After-Tax Cash Flow ($B) $3.23 60 Tonn
Slide 18: Probable Mineral Reserves
PROBABLE MINERAL RESERVES FILO DEL SOL MINERAL RESERVE STATEMENT (@ 0.01 $/T NVPT CUT-OFF) Tonnage Grade Contained Metal Category (all domains) (Mt) Cu (%) Au (g/t) Ag (g/t) NVPT ($/t) Cu (M lbs) Au (K oz) Ag (K oz) Proven _ _ _ _ _ _ _ _ Probable 259.1 0.39 0.33 15.1 25.30 2,226 2,764 126,028 Total
Slide 19: Next Steps
NEXT STEPS Execute on 2019/2020 field season; Plan to drill ~10,000m, drilling well underway Drilling results expected through April 2020 Ongoing environmental studies and data collection in support of project permitting Initiate metallurgical testwork on sulphide material Slide 19 Filo Mining | Cor
Slide 20: Experienced Management Team
EXPERIENCED MANAGEMENT TEAM EXPERTISE IN EXPLORATION, PROJECT STUDIES, FINANCING ADAM LUNDIN JAMIE BECK JEFF YIP CEO President Chief Financial Officer » Appointed as President and CEO in » More than 15 years of international » Also CFO of NGEx Minerals Ltd. September 2017, Adam is focused on project
Slide 21: Strong & Reputable Board
STRONG & REPUTABLE BOARD EXPERTISE IN EXPLORATION, PROJECT STUDIES, FINANCING, M&A TRANSACTIONS LUKAS LUNDIN ALESSANDRO BITELLI PABLO MIR Chairman » Over 30 years of experience in the resource » Practices natural resources law with industry and in public accounting, both in North focus on mining. »
Slide 22: A Lundin Group Company
A LUNDIN GROUP COMPANY Creating Value for Shareholders The Lundin Group of Companies has a record of creating substantial value for shareholders. Past projects have generated some $15.8 billion. Shareholder Return on Investment* 1757% 1041% 1091% 961% 850% 558% 609% 352% 139% Lundin Mining Red Back
Slide 23: Contact Us
Filo Mining | Corporate Presentation CONTACT US filo-mining.com Filo Mining Corp. Suite 2000 - 885 West Georgia Street Vancouver, BC, V6C 3E8 Canada FOR MORE INFORMATION CONTACT Amanda Strong Robert Eriksson Investor Relations Canada Investor Relations and Media Sweden info@filo-mining.com reriksson