Faraday Copper Corp · TSX:FDY

Faraday Copper — Investor Presentation (March 2024)

29 slides from Faraday Copper's investor presentation, March 2024

  1. Slide 1: Growing U.S. Copper Resources

    Growing U.S. Copper Resources CORPORATE PRESENTATION March 2024 FDY: TSX I CPPKF: OTCQX

  2. Slide 2: Cautionary Statement

    CAUTIONARY STATEMENT Some of the statements in this presentation, other than statements of historical fact, are “forward-looking statements” and are based on the opinions and estimates of management as of the date such statements are made and are necessarily based on estimates and assumptions that a

  3. Slide 3: Investment Highlights

    INVESTMENT HIGHLIGHTS Significant Resource Growth Through New Discoveries ▪ Copper Creek is a large Cu-Mo-Ag resource with over 4.2 Blbs of copper M&I Mineral Resource backstopped by a robust PEA ▪ High-grade near surface breccia mineralization and vein stockwork porphyry at depth ▪ Exploration upsi

  4. Slide 4: Copper Creek Is in a Top Mining Jurisdiction

    COPPER CREEK IS IN A TOP MINING JURISDICTION Arizona Produced ~70% of U.S. Copper in 2023 (USGS) Pinto Valley Arizona, USA ▪ 100% owned property in Pinal ARIZONA Globe-Miami Resolution County, Arizona Ray Copper Morenci ▪ Near mining and service hubs with Cactus Florence Creek Safford Lone Star skil

  5. Slide 5: Corporate Overview

    CORPORATE OVERVIEW Analyst Coverage Dalton Baretto Top Strategic Shareholders Connor Mackay Lundin Family Arun Lamba Murray Edwards Pierre Lassonde Financial Overview Ownership C$89.7 M Market Capitalization C$40.0 M Recent Financing (Feb 14, 2023) 41.0% Strategic Shareholders: 33.4% 33.4% C$20.0 M

  6. Slide 6: Undervalued Mineral Resource Compared to Peers

    COMPELLING INVESTMENT Undervalued Mineral Resource Compared to Peers Relative Price Performance (a) Enterprise Value / M&I Mineral Resources (b) 44.9¢ 12.1¢11.7¢11.3¢ 140% 10.0¢ 120% EV/M&I (US¢/lb CuEq) 100% 7.5¢ 6.2¢ 80% 5.8¢ Average EV/M&I Resources - excl. Faraday: 5.5¢ 60% 5.0¢ 5.0¢ 40% 3.3¢ 2.

  7. Slide 7: Resource Optimization

    RESOURCE OPTIMIZATION Significant Upside to the 4.2 Blbs of Copper M&I Mineral Resource A Open Pit Grade Distribution A’ A Copper Prince Childs Aldwinkle 1,300RL Globe Opportunity Mammoth Copper N Prince Marsha to grow 1,200RL open pits Old Childs 1,100RL where they Reliable Alwinkle are limited 1,0

  8. Slide 8: Phase II Results Show Upside (Post-MRE)

    PHASE II RESULTS SHOW UPSIDE (POST-MRE) Drill Hole Assay Results Copper Grade (%) >2.00 1.00 0.70 High-grade High-grade 0.50 intercept intercept 0.31 below below 0.25 Copper Copper 0.13 Prince Giant 0.05 0.00 Block Model Copper Grade (%) >2.00 1.00 0.70 0.50 0.31 0.25 0.13 Potential for 0.00 Potenti

  9. Slide 9: 2024 Metallurgical Results

    2024 METALLURGICAL RESULTS Unlocking Significant Upside Coarse Grind Additional Optimization Benefits Gold recovery over Over 95% copper 75% supporting sulphide recovery potential to add gold to the resource Oxide copper Grind energy recovery improved significantly reduced significantly Unlocks proc

  10. Slide 10: Gold Program Highlights (Post-MRE)

    GOLD PROGRAM HIGHLIGHTS (POST-MRE) Gold Program Childs Aldwinkle Breccia ▪ Assaying historical material for gold that was not previously tested, for Mammoth Open Pit Shell potential inclusion in future studies CA-5R: 219.46 m at 0.31 g/t Au, Childs Aldwinkle Breccia Results 3.29% Cu ▪ Weighted avera

  11. Slide 11: Resource Expansion Potential

    RESOURCE EXPANSION POTENTIAL Significant Growth Opportunities Rum ~4,000 metres Globe Copper Childs Marsha Prince Aldwinkle Potential for Old expansion of pit Reliable Mammoth Bald mineralization, Area 51 ISOMETRIC VIEW which remains LOOKING NORTHEAST open laterally and at depth American Eagle Poten

  12. Slide 12: Exploration Data Layers

    EXPLORATION DATA LAYERS New Empirical Data Informs Exploration Targeting New Airborne Geophysical Survey (VTEM) New Airborne Spectral Survey N N 500 metres 500 metres New Structural Interpretation New Geophysical Processing (ZTEM) N N 500 metres 500 metres faradaycopper.com I page 12

  13. Slide 13: Potential for New Discoveries

    POTENTIAL FOR NEW DISCOVERIES Significant Growth Opportunities in an Underexplored District Holy Joe Fault Mineral Reserves 8 Mineral Resource Targets 3 Mineral Advanced Targets Resource Area 7 Identified Targets 15 Generative Targets Western Fault 33 high priority targets Area 51 across the propert

  14. Slide 14: New Discovery: Phase III Drill Results

    NEW DISCOVERY: PHASE III DRILL RESULTS Starship Breccia NW (at Area 51) SE NW Starship SE Breccia 25.06 m at 0.78% Cu, 0.03 g/t Au, 1.49 g/t Ag from 50.24 m OPEN 72.01 m at 0.37% Cu, 0.02 g/t Au, 1.35 g/t Ag from 50.24 m Drill Hole Assay Results Copper Grade (%) OPEN >2.00 1.00 0.70 0.50 American Ea

  15. Slide 15: New Discovery: Phase III Drill Results

    NEW DISCOVERY: PHASE III DRILL RESULTS 50 mm Chalcopyrite Quartz Chalcocite Chalcopyrite Chalcopyrite Altered granodiorite clast Chalcopyrite Drill Hole FCD-24-050 Note: For further details refer to the Company’s news release dated March 4, 2024. faradaycopper.com I page 15

  16. Slide 16: Phase III Drill Results

    PHASE III DRILL RESULTS Higher Grade Zones at American Eagle are Open for Expansion Drill Hole Assay Results Copper Grade (%) >2.00 1.00 0.70 0.50 0.31 0.25 0.13 0.05 0.00 Block Model Copper Grade (%) >2.00 1.00 0.70 0.50 0.31 0.25 0.13 0.00 Legend Underground Shapes with Mineral Resource Model (202

  17. Slide 17: Environmental & Stakeholder Engagement

    ENVIRONMENTAL & STAKEHOLDER ENGAGEMENT Baseline Data Collection and Stakeholder Outreach ENVIRONMENT STAKEHOLDER ENGAGEMENT Baseline environmental monitoring Commitment to open dialogue and systems in place for data collection to support for the local economy and social support permitting process pr

  18. Slide 18: Contact Copper

    CONTACT COPPER Copper Oxide Optionality ▪ 100% owned, 5,900+ acres of patented and unpatented mining claims in northern Nevada Contact Copper Elko ▪ Excellent access to a major highway, power and local mining services ▪ Open pit, heap-leach copper oxide opportunity NEVADA ▪ Deposit open in all direc

  19. Slide 19: Opportunities and Next Steps

    OPPORTUNITIES AND NEXT STEPS Phase II drill Gold Phase III drill Asset Exploration program potential program scalability pipeline Demonstrates Targeting gold Focused on resource Metallurgical program Underexplored potential for inclusion in future expansion and testing supports coarser district at C

  20. Slide 20: Contact Us

    Contact Us CONTACT INFORMATION Suite 250, 200 Burrard Street Vancouver, BC Canada www.faradaycopper.com STACEY PAVLOVA, CFA VP Investor Relations 778-730-1067 info@faradaycopper.com

  21. Slide 21: Appendix

    FARADAY COPPER Appendix

  22. Slide 22: Bringing a Senior Mining Company Expertise

    BRINGING A SENIOR MINING COMPANY EXPERTISE Senior Mining Company Talent Who Know Great Projects Management Board of Directors Graham Richardson Dr. Thomas Bissig Audra Walsh Robert Doyle Paul Harbidge Chief Financial Officer VP Exploration Russell Ball Prev. CEO, Minas de Prev. CFO, Pan President, C

  23. Slide 23: Copper Creek: Large Land Package

    COPPER CREEK: LARGE LAND PACKAGE ▪ ~73 km2 Property offers strategic benefits ▪ Mineral claims include patented claims, unpatented claims and state prospecting permits ▪ Optionality for infrastructure placement ▪ Solar power generation potential ▪ Ranch includes ~26,000 acres of surface rights throu

  24. Slide 24: Copper Creek: Mineral Resources (2023)

    COPPER CREEK: MINERAL RESOURCES (2023) Grade Contained Metal Category Tonnes (Mt) Cu Mo Ag CuEq 1 Cu Mo Ag CuEq 1 (%) (%) (g/t) (%) (Mlbs) (Mlbs) (Moz) (Mlbs) Open Pit (OP) Measured 67.2 0.48 0.008 1.2 0.51 710.5 12.5 2.6 751.1 Indicated 59.9 0.31 0.008 0.6 0.33 412.9 10.1 1.1 440.5 M&I 127.1 0.40 0

  25. Slide 25: Copper Creek: Notes to Mineral Resources

    COPPER CREEK: NOTES TO MINERAL RESOURCES ▪ CuEq: Copper equivalent; g/t: Grams per tonne; Mlb: Million pounds; Moz: Million troy ounces; Mt: Million tonnes ▪ The mineral resources in this estimate were prepared in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Stand

  26. Slide 26: Copper Creek: PEA Highlights

    COPPER CREEK: PEA HIGHLIGHTS Life-of-Mine Average Annual Life-of-Mine Payable Measured and Indicated 51,100 tpa Payable CuEq 2 Production 3.4 Blb CuEq 2 Production 4.2 Blb Copper Mineral Resource a KEY FINANCIAL DATA ANTICIPATED PRODUCTION PROFILE Post-tax NPV(7%) $713 million Mine Life b 32 years T

  27. Slide 27: Copper Creek: PEA Economic Sensitivity

    COPPER CREEK: PEA ECONOMIC SENSITIVITY Well-positioned to Leverage the Copper Price $2,000 40% PEA $1,843 29.6% Post-Tax NPV ($ million) $1,500 $1,576 30% Post-Tax NPV (7%) $ M Post-Tax IRR 21.0% Post-Tax NPV (8%) $ M $1,000 20% 15.6% $1,144 $951 Post-Tax IRR % $713 $500 $566 10% $0 0% $3.80 $4.25 $

  28. Slide 28: Endnotes

    ENDNOTES 1. Mineral Resource Estimate (“MRE”) copper equivalent values are calculated using commodity type and price, considering the relevant preliminary recovery rate based on domain. For example, sulphide CuEq = [(Cu grade/100 * 0.92 Cu recovery * 2,204.62 * $3.80) + (Mo grade/100 * 0.78 Mo recov

  29. Slide 29: Contact Information

    CONTACT INFORMATION STACEY PAVLOVA, CFA Suite 250, 200 Burrard Street VP Investor Relations Vancouver, BC Canada 778-730-1067 www.faradaycopper.com info@faradaycopper.com

Faraday Copper — Investor Presentation (March 2024) on 6ix