  1. Slide 1: Paladin Energy Ltd Annual General Meeting

    Paladin Energy Ltd Annual General Meeting 25 November 2009

  2. Slide 2: The New Energy In The Market: Uranium Market

    Paladin Energy Ltd The Ne New Energ Energy In The Market Uranium Market Dustin Garrow, Executive General Manager g - Marketing g Annual General Meeting V.1L 25 November 2009

  3. Slide 3: Disclaimer

    Disclaimer This presentation includes certain statements that may be deemed “forward-looking statements”. All statements in this presentation, other than statements of historical facts, that address future production, reserve or resource potential, exploration drilling, exploitation activities and e

  4. Slide 4: World Nuclear Capacity - Growth is Assured

    World Nuclear Capacity - Growth is Assured number of reactors expected to be operating by 2030 Status as of 1 October 2009 Current Nuclear Under Construction Planned Capacity Reactors / (Capacity) 436 (372.5GWe) 52 (44.3GWe) [43] 135 (150GWe) [108] 170Mlb U3O8 required q (WNA Estimate) Countries 30

  5. Slide 5: Global Uranium Production 2000-2008

    Global Uranium Production 2000 - 2008 130 430 120 360 50 112 315 110 50 100 90 nds U3O8 80 70 million poun 125 60 115 120 104.7 108.9 107.1 50 102.3 91.5 94.5 93.7 92.6 40 30 20 10 0 20 20 20 20 20 20 20 20 20 20 00 01 02 03 04 05 06 07 08 09 Actual production Forecast production 430 Planned and pro

  6. Slide 6: Uranium Price Trend

    Uranium Price Trend 2006 - Present

  7. Slide 7: Paladin Energy Ltd

    PALADIN PALADIN ENERGY LTD

  8. Slide 8: Operations Update

    Operations Update Wyatt Buck E Executive ti General G l Manager M – Production P d ti Paladin Energy Ltd Annual General Meeting g 25 November 2009

  9. Slide 9: Safety

    Safety • First priority – “zero harm at work” • Management understands “Actions Actions speak louder than words words” • Require to build onto the Malawian Kayelekera operation with the experience gained at Langer Heinrich • NOSA system at all Paladin Operations • “Right people on the ground” will m

  10. Slide 10: General

    General • Current design nameplate from combined LHM and KM operations of 7Mlb pa to be realised over the next few months. • Langer Heinrich Mine (LHM) now ramping up quickly, currently to 90% of design. • Kayelekera Mine (KM) is improving monthly and realistically expected to get to design in next

  11. Slide 11: Langer Heinrich Project

    Langer Heinrich Project staged growth • Stage 1 – Alkaline leach, CAPEX US$100M – design 2.6Mlb pa – operating above design capacity for 5 consecutive quarters • Stage 2 – production ramp-up – design 3.7Mlb pa, CAPEX US$59M – design production at approximately 90% • Stage S g 3 expansion p approved

  12. Slide 12: Langer Heinrich Ramp-up

    Langer Heinrich Ramp-up LHM Production in lb U3O8 Accounting Design 400,000 Stage 2 target 300,000 200,000 100,000 0

  13. Slide 13: Kayelekera

    Kayelekera • Ramp–up fully under way • Expect 75 to 80% of design in December, ramp-up to design next qtr Kayelekera Downtime 400 350 300 Hours downttime 250 200 Sept Qtr Oct 150 100 50 0 RIP RIP elution Water MMD sizer Power/Inst Mill Tails contactor thickener

  14. Slide 14: Production Forecast

    Production Forecast Kayelekera Production in lb U3O8 300,000 Accounting Design 250,000 200,000 150,000 100,000 50,000 0

  15. Slide 15: Paladin Energy Ltd

    PALADIN PALADIN ENERGY LTD

  16. Slide 16: Corporate Social Responsibility Programme

    Corporate C t S Social i l Responsibility Programme Gregg Walker General Manager - International Affairs Paladin Energy Ltd Annual General Meeting 25 November 2009

  17. Slide 17: Flagship Water Project Nearing Completion

    Flagship Water Project Nearing Completion

  18. Slide 18: Trench Digging Provided Local Jobs

    Trench Digging Provided 265 Local Jobs

  19. Slide 19: New Kayelekera Village Teacher's Housing

    New Kayelekera Village Teacher’s Housing

  20. Slide 20: Kayelekera Primary School – Before

    Kayelekera Primary School – Before

  21. Slide 21: Kayelekera Primary School – After

    Kayelekera Primary School – After “What you have built here is more than what I would call a beautiful modern school. Paladin has kept its promise and we are grateful.” Kayelekera Village Headman Mweso

  22. Slide 22: Paladin is Funding Local Teachers' Salaries

    Paladin is Funding Local Teachers’ Salaries

  23. Slide 23: Health Clinic is a Vital Community Service

    Health Clinic is a Vital Community Service

  24. Slide 24: Local Food Buying is a Major Stimulus

    Local Food Buying is a Major Stimulus

  25. Slide 25: Employees' Charity Funds Local Child Care

    Employees’ Charity Funds Local Child Care

  26. Slide 26: Charity Ensures Orphaned Children are Fed

    Charity Ensures Orphaned Children are Fed

  27. Slide 27: Funding Provides Youth Vocational Training

    Funding Provides Youth Vocational Training

  28. Slide 28: And Supports Visually-Impaired Childcare

    And Supports Visually-Impaired Childcare

  29. Slide 29: LHM Supports Namibian Education Projects

    LHM Supports Namibian Education Projects

  30. Slide 30: Including National Mathematics Congress

    Including National Mathematics Congress

  31. Slide 31: Paladin Energy Ltd

    PALADIN PALADIN ENERGY LTD

  32. Slide 32: Paladin Status & Future Outlook

    Paladin P l di Status St t & Future Outlook John Borshoff M Managing i Director/CEO Di t /CEO Paladin Energy Ltd Annual General Meeting g 25 November 2009

  33. Slide 33: Paladin's Suite of Uranium Properties

    Paladin’s Suite of Uranium Properties staged for sequential development

  34. Slide 34: Paladin – A Mining House in the Making

    Paladin – A Mining House in the Making NOV 07 NOV 08 NOV 09 Cash on hand US$160M US$280M US$464M Shares on issue 601M 613M 716M Mkt Capital US$3.9bn US$1.2bn US$2.8bn LHM Stage 1 50% design 100% design 100% design Stage 2 - Construction 90% design Stage 3 - Feasibility Design/construction Stage 4 -

  35. Slide 35: Paladin: Multi-staged Parallel Activities

    Paladin proceeding with multi-staged multi staged parallel activities Developing a complete company • Sustained production - LHM Stage 1 • Ramping up production - LHM Stage 2 & KM • E Expansion i (immediate) (i di t ) - LHM St Stage 3 • Expansion (mid term) - LHM Stage 4 & Stage 2 KM • Development/a

  36. Slide 36: Value Proposition

    Value Proposition Paladin offers an extremely attractive investment offering at a time when the uranium market outlook remains uniquely positive. Uranium Producer Paladin is an emerging Tier I global uranium producer Fully Independent Paladin is the only non-aligned pure uranium producer Increasing

  37. Slide 37: Future Outlook

    Future Outlook

  38. Slide 38: Year Production Outlook

    4 Year Production Outlook 15 13 8 13.8 14 Actual Forecast 13 12.8 12 Stage 3 Langer Heinrich 11 Production 10.0 10 8.5 9.0 9 8.0 Stage 4 Mlb 8 U3O8 7 6.1 6 I 5 5.6 4 2.70 3 2 1 71 1.71 1 0 07/08 08/09 09/10 10/11 11/12 12/13 13/14 14/15 15/16 Langer Heinrich Actual Langer Heinrich Production Kayelek

  39. Slide 39: Project Pipeline

    Project Pipeline assets acquired & projects developed Stage 3 Expansion Langer Heinrich Mine LHM LHM Stage 4 Expansion Kayelekera Mine Inventory U3O8 376 5Mlb 376.5Mlb New production with staged g organic g growth 2007 to 2013

  40. Slide 40: Key Takeaways

    Key Takeaways • Multi-mine/multi-country operating status • M i t i i strong Maintaining t production d ti profile fil – FY10 growth for Paladin (2.7Mlb to 5.6Mlb – 6.1Mlb) • Langer Heinrich Stage 3 expansion increasing production to 5.2Mlb pa – commissioning start up Dec qtr 2010 • Stage 4 expansio

  41. Slide 41: Paladin Energy Ltd

    gALADIW PALADIN ENERGY LTD

  42. Slide 42: Proxy Votes

    Proxy Votes For Against Abstain R Resolution l ti 1 – Remuneration R ti R Reportt 354 099 004 354,099,004 9 373 446 9,373,446 2 147 155 2,147,155 Resolution 2 – Re-election of Donald Shumka 344,825,577 19,031,481 1,752,687 Resolution 3 – Employee Performance Share Rights Plan 310,642,003 22,997,800

  43. Slide 43: Paladin Energy Ltd

    PALADIN PALADIN ENERGY LTD

Paladin Energy — Shareholder Meeting (November 2009) on 6ix