Carnaby Resources Ltd. · ASX:CNB

Carnaby Resources — Euroz Hartleys Rottnest Conference 2025

27 slides from Carnaby Resources's conference presentation, March 2025

  1. Slide 1: Euroz Hartleys Rottnest Conference

    Euroz Hartleys Rottnest Conference March 2025 PHOTO OF EAST WALL OF TREKELANO OPEN PIT

  2. Slide 2: Statements and Disclaimers

    Statements and Disclaimers Competent Persons Statement The information in this document that relates to all exploration results is based upon information compiled by Mr Robert Watkins. Mr Watkins is a Director and shareholder of the Company and a Member of the AusIMM. Mr Watkins consents to the incl

  3. Slide 3: Corporate Overview

    Corporate Overview STRUCTURED FOR EXPLORATION SUCCESS CORPORATE STRUCTURE1 BROKER COVERAGE Shares on Issue 228.4M Share Price $0.28 Unlisted Options 4.4M Market Cap $64M SHARE PRICE PERFORMANCE1 Cash Position2 $18.9M $2.50 Lady Fanny $2.00 Discovery MAJOR SHAREHOLDERS3 Chalcus Lode Greater Duchess D

  4. Slide 4: ASX Copper Developers and Producers

    ASX Copper Developers and Producers A TIGHT SPACE • Numerous single mine developers and producers • Opportunity for consolidation • Carnaby well placed to transition from explorer to producer 539 1,283 4,780 ASX Copper Producers and Explorers Market Cap (A$M) 219 225 155 100 89 64 65 68 71 49 57 37

  5. Slide 5: Greater Duchess Copper Gold Project

    Greater Duchess Copper Gold Project

  6. Slide 6: Greater Duchess reaches critical mass

    Greater Duchess reaches critical mass Trekelano acquisition to add critical inventory at same high grades as the other deposits 1 Material • +27% increase in consolidated Greater Duchess resources to Pro Increase in forma MRE of; Group Resources 27.0Mt @ 1.5% CuEq for 400,000t CuEq1,2 2 • Increased

  7. Slide 7: Trekelano Acquisition Overview

    Trekelano Acquisition Overview • Acquisition of 100% of the historical Trekelano mine, located within 20km radius of the Greater Duchess deposits. • JORC 2012 Mineral Resource Estimate: 5.2Mt @ 1.6% CuEq, 85kt CuEq1,2 (1.4% Cu, 0.4g/t Au) • Main Inheritance open pit was not mined to its full extent

  8. Slide 8: Trekelano - Inheritance

    Trekelano - Inheritance1 • Historical open pit to ~140m depth • JORC 2012 Mineral Resource Estimate: 2.9Mt @ 1.5% CuEq , 43kt CuEq1,2 (1.3% Cu, 0.3g/t Au) • Significant potential for cut back or underground development • Big unmined drill hits under the historical pit for another ~100m below the pit

  9. Slide 9: Trekelano - Inheritance Cross Sections

    Trekelano - Inheritance Cross Sections1 Inheritance Drill Section 7624310N Inheritance Drill Section 7624280N Note 1: Refer to ASX release dated 28 November 2024. 9

  10. Slide 10: Trekelano Mine

    Trekelano Mine1 • JORC 2012 Mineral Resource Estimate: 1.5Mt @ 2.0% CuEq, 29kt CuEq1,2 (1.7% Cu, 0.5g/t Au) • Big drill hits open below historical workings1: • 8m @ 12.9% CuEq (10.6% Cu, 3.3g/t Au) & 8m @ 4.0% CuEq (3.5% Cu, 0.7g/t Au) • 17m @ 8.4% CuEq (7.2% Cu, 1.7g/t Au) • 15m @ 4.8% CuEq (4.3% C

  11. Slide 11: Mount Hope (CNB:100%)

    Mount Hope (CNB:100%) AN EXCEPTIONAL IOCG DISCOVERY1 • JORC 2012 Mineral Resource Estimate: 10.3Mt @ 1.7% CuEq, 173kt CuEq1,2 (1.5% Cu, 0.2g/t Au) • Excellent metallurgy – historically mined for quartz flux for the Mount Isa smelter in the 1960’s – early 1970’s • Lodes lengths ~250m, widths ~20m thi

  12. Slide 12: Chalcus Lode

    Chalcus Lode MOUNT HOPE CENTRAL1,2 Chalcus Lode is blind to surface, discovered in March 2023 • Discovery hole • 36m (TW~12m) @ 4.5% CuEq (4.2% Cu, 0.5g/t Au) • Results outside of the current Mineral Resource include: • 87m (TW~29m) @ 2.6% CuEq (2.3% Cu, 0.5 g/t Au) • 71m (TW~28m) @ 1.9% CuEq (1.6%

  13. Slide 13: Lady Fanny And Burke & Wills

    Lady Fanny And Burke & Wills (CNB: 82.5-100%) NO RECORDED DRILLING PRIOR TO CARNABY1,2 • JORC 2012 Mineral Resource Estimate: 3.1Mt @ 1.5% CuEq, 46kt CuEq1,2 (1.3% Cu, 0.2g/t Au) • Lady Fanny Recent intersections of; 19.5m (~10m TW) @ 1.4% CuEq (1.2% Cu, 0.3g/t Au) • Burke & Wills Recent results of;

  14. Slide 14: Nil Desperandum (CNB:82.5%)

    Nil Desperandum (CNB:82.5%) IP GEOPHYSICS AND GEOLOGY LED DISCOVERY1 JORC 2012 Mineral Resource Estimate: 4.3Mt @ 1.4% CuEq, 61kt CuEq1,2 (1.3% Cu, 0.2g/t Au) Including Underground MRE of 1.7Mt @ 2.3% CuEq, 39kt CuEq1,2 (2.0% Cu, 0.4g/t Au) Discovery hole NLDD044 • 41m @ 4.4% CuEq (4.1% Cu, 0.5 g/t

  15. Slide 15: Project Development

    Project Development

  16. Slide 16: Prefeasibility Study in Progress

    Prefeasibility Study in Progress ACQUISITION OF TREKELANO HAS THE POTENTIAL TO EXTEND MINE LIFE AND INCREASE THE ANNUAL PRODUCTION TARGET Annual Estimated Mining Production of CuEq Metal by Mining • Scoping Study Results (NOT YET INCLUDING TREKELANO)1,2: Source 30,000 3 • 9-year production target 7.

  17. Slide 17: Greater Duchess Development

    Greater Duchess Development LOW CAPEX DIRECT RAIL HAULAGE OPTION1 • Low Estimated Pre-Production Capex: ~A$35M • Carnaby is focussed on a low CAPEX, low risk and low dilutionary third party processing start up to get into production • Toll milling and offtake agreements are in place with Glencore In

  18. Slide 18: Greater Duchess Copper Gold Project

    Greater Duchess Copper Gold Project TARGETING A LOW CAPEX START UP AS EARLY AS 20261 • PFS study on track to be completed H2 CY 2025 CY'24 CY'25 CY'26 CY'27 CY'28 CY'29 Work Program H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 • Resource extension and infill drilling – completed*. H1 • MRE update – in progress*

  19. Slide 19: Exploration

    Exploration

  20. Slide 20: Mount Hope Region (CNB 51-100%)

    Mount Hope Region (CNB 51-100%) Exceptional VTEM Conductors Light Up Mount Hope Region1,2 • Mohawk Discovery hole 9 September 2024; Jude • 21m @ 2.4% CuEq (2.0% Cu, 0.6g/t Au) • 194 line km VTEM survey completed • >4km Mohawk Corridor, numerous VTEM conductors not yet drill tested • Every VTEM condu

  21. Slide 21: Mohawk Discovery (CNB 100%)

    Mohawk Discovery (CNB 100%) New High-Grade Discovery 1.5km SE Of Mount Hope1,2 • First drill hole MKRC001 yielded high grade intersection: • 21m @ 2.4% CuEq (2.0% Cu, 0.6g/t Au) from 43m, Incl 12m @ 3.9% CuEq (3.3% Cu, 0.9g/t Au) • Open along strike and at depth. Note 1: Refer to ASX releases dated

  22. Slide 22: Magna Lynn Southern Corridor (CNB:100%)

    Magna Lynn Southern Corridor (CNB:100%)1 • Structural and stratigraphic corridor over 75 km of strike • Interpreted southern continuation of the Mount Hope to Nil Desperandum IOCG corridor • Virtually unexplored with no historic drilling or soil sampling. • Numerous historical workings. • Carnaby ha

  23. Slide 23: Rio Tinto Devoncourt Project Farm-in

    Rio Tinto Devoncourt Project Farm-in VERY ENCOURAGING SIGNS FROM MAIDEN DRILLING PROGRAM1,2 Wimberu Prospect • Maiden drill program intersected highly encouraging breccia style mineralisation of 17.3m @ 0.52% CuEq (0.46% Cu, 0.09g/t Au). • The new 17m downhole breccia and vein zone is completely ope

  24. Slide 24: Outlook and Value Drivers

    Outlook and Value Drivers

  25. Slide 25: Investment Highlights

    Investment Highlights Critical Mass Reached 27.0Mt @ 1.5% CuEq for 400,000t CuEq1,2 Binding Tolling and Offtake Agreements with Processing Solution Glencore International AG PFS to be completed H2 CY 2025 Development Pathway (incorporating Trekelano) including Greater Duchess Mineral Resource update

  26. Slide 26: Office Contact

    Office Contact 78 Churchill Avenue P +61 8 6500 3236 SUBIACO WA 6008 E info@carnabyresources.com.au

  27. Slide 27: Appendix

    Appendix 1 Carnaby Resources Limited Greater Duchess Copper Project - Cu Equivalent Cut-off1 Mineral Resource Inventory as at 27 November 2024 Indicated Inferred Total COG Deposit Tonnes Cu Au CuEq Cu Au CuEq Tonnes Cu Au CuEq Cu Au CuEq Tonnes Cu Au CuEq Cu Au CuEq CuEq% Mt % g/t % t oz t Mt % g/t