Eaton Corporation, PLC · NYSE:ETN

Eaton — Investor Presentation (February 2017)

17 slides from Eaton's investor presentation, Feb 22, 2017

  1. Slide 1: BCMS Branch Circuit Monitoring Solutions: JCOMM & BCMS Hub

    BCMS Branch Circuit Monitoring Solutions JCOMM® & BCMS Hub Slide 1

  2. Slide 2: What is BCMS?

    22-Feb-17 What is BCMS? Provides real time energy usage information down to the branch circuit level.  BCMS = Branch Circuit Monitoring Solution  Increases reliability by alarming before circuit breaker gets close to trip points.  Avoids labor intensive measurements.  “Split Core CT’s” (Current

  3. Slide 3: BCMS JCOMM Retrofit

    BCMS JCOMM® Retrofit Why do customers need to monitor branch circuits? 1. To capture kWh per circuit usage for individual customers – most data center applications 2. To detect stranded capacity and provide overload protection 3. To capture knowledge of usage for energy management How did/do custome

  4. Slide 4: Problems customers have with existing methods

    BCMS JCOMM Retrofit What are the problems customers have with existing methods? • Inaccurate data measurement – with handheld meter prone to human error • Ineffective data – clipboard recording cannot provide data for local measurement only, very hard to port to other system • Costly – hiring a dedi

  5. Slide 5: What is the value of the new and improved JCOMM Solution?

    BCMS JCOMM Retrofit What is the VALUE of the new and improved JCOMM Solution? 1. Pre-engineered cable system saves up to 75% installation time: • Contractor friendly design to significantly reduce installation time. Reduce typical 4 hours installation to 1 hour. • Numbered Molex connectors with matc

  6. Slide 6: BCMS JCOMM Retrofit – Key Features

    BCMS JCOMM Retrofit – Key Features • Easily retrofits any type of distribution unit – PDU, RPP or wall mounted Panel • Each JCOMM enclosure can monitor up to four 42-pole panelboards & four main feeders with neutral & ground • Optional local monitor on each unit (WaveStar® Color Touch Screen) • Pre-

  7. Slide 7: BCMS JCOMM Retrofit - Integration

    BCMS JCOMM Retrofit - Integration How does BCMS JCOMM® integrate into my Data Center? BCMS JCOMM® fits on any manufacturer’s units or panels and connects to any Building Management System via MODBUS, TCP I/P or SNMP. SCADA, BMS DCIM or CPMS Slide 7

  8. Slide 8: BCMS JCOMM Retrofit - Components

    BCMS JCOMM Retrofit - Components JCOMM® Enclosure Branch Circuit Harness & CTs Main Feeder Harness & CT Slide 8

  9. Slide 9: BCMS JCOMM Retrofit – Display Options

    BCMS JCOMM Retrofit – Display Options No Monitor WaveStar® Color Touch Screen Slide 9

  10. Slide 10: WaveStar BCMS Hub

    WaveStar® BCMS Hub Adding the WaveStar® BCMS HUB in conjunction with your JCOMM® retrofit, allows for one centralized monitor to collect up to 70 BCMS devices. MODBUS RTU & MODBUS TCP I/P are standard forms of communications integrated into the HUB. Slide 10

  11. Slide 11: BCMS JCOMM Retrofit - Communications

    BCMS JCOMM Retrofit - Communications MODBUS RTU is standard on all PDI equipment, but we offer MODBUS TCP I/P and SNMP options MODBUS to TCP I/P converter (For faster data collection, add a Modbus TCP I/P Converter to each unit) Slide 11

  12. Slide 12: BCMS JCOMM Retrofit Harness

    BCMS JCOMM Retrofit Harness Slide 12

  13. Slide 13: BCMS JCOMM Retrofit - Installation

    BCMS JCOMM Retrofit - Installation New split core harness reduces installation time & the amount of wires associated with typical split core applications. Split core harnesses are available In 5’, 10’, 15’ & 20’ lengths. Slide 13

  14. Slide 14: BCMS JCOMM Retrofit - Installation

    BCMS JCOMM Retrofit - Installation Slide 14

  15. Slide 15: BCMS JCOMM Retrofit - Installation

    BCMS JCOMM Retrofit - Installation Slide 15

  16. Slide 16: Monitoring Data Points

    22-Feb-17 Monitoring Data Points Parameter Branch Circuit Panelboard Current (A) a a Average Current (A) a a Max Current (A) a a Min. Current (A) a a Voltage (V) a Frequency (Hz) a Power Factor (PF) a Power (kW) a Energy (kWh) a a Apparent Power (kVA) a Power Factor (PF) a THD (%) a % Load a a Break

  17. Slide 17: Qualifying LEED Points

    22-Feb-17 Qualifying LEED Points Office Buildings Usage Based Leases Office Buildings Usage Based Leases Universities Perform Energy Audits Universities Perform Energy Audits Hospitals Hospitals Optimize Energy Efficiency Optimize Energy Efficiency Factory Factory Automation Automation Selectively S

Eaton — Investor Presentation (February 2017) on 6ix