Blue Thunder Mining Inc

Blue Thunder Mining — Investor Presentation (December 2020)

21 slides from Blue Thunder Mining's investor presentation, Dec 23, 2020

  1. Slide 1: The right location, time and team for an exciting new discovery

    The right location, time and team for an exciting new discovery DECEMBER 23, 2020

  2. Slide 2: Forward Looking Statements

    Forward Looking Statements This document contains forward-looking statements and forward-looking information (collectively, "forward-looking statements") within the meaning of applicable Canadian securities legislation. All statements, other than statements of historical fact, included herein includ

  3. Slide 3: Investment Highlights

    Investment Highlights 2020 Exploration Program Complete! ▪ 9 trenches at Fancamp – completed Large land package •51,000 ha south of the Chibougamau- — 12.37 g/t Au over 3.0 m, including in an emerging Chapais Mining Camp o 22.99 g/t over 1.0 m (produced >3B lbs Cu and 4M oz Au)3 — 6.23 g/t Au over 2

  4. Slide 4: Capital Markets Profile

    Capital Markets Profile Ticker TSXV:BLUE ▪ $2.4 M financing closed on Dec 11, OTCQB: BLTMF 2020 to fund next phase of exploration Share Price (December 21, 2020) C$0.12 on the Muus Project Basic Shares Outstanding 102.61M Options 7.28M1 ▪ Highly supportive shareholder base Warrants 13.38M2 ▪ Compell

  5. Slide 5: Our Muus Project at a Glance

    Our Muus Project at a Glance 51,000 ha of ground near Geological Hot Spot Chibougamau, Québec Exploration Thesis Recent Gold Discoveries ▪ Muus Project comprised of five properties ▪ Nelligan (Iamgold/Vanstar JV) ▪ Most of the Property not actively explored (Fancamp, Muus, Muus East, Nisk, Embry) si

  6. Slide 6: 2020 has been busy… but we are just getting started

    2020 has been busy… but we are just getting started February ▪ Blue Thunder Mining formed through RTO 2020 ▪ Listed on TSXV under symbol “BLUE” May 2020 ▪ Strategically expanded holdings in the area to 51,000 ha of prime exploration ground, culminating with acquisition of the Fancamp and Embry prope

  7. Slide 7: Located in an Emerging Gold Camp

    Located in an Emerging Gold Camp Revived Gold District South of Historic Chibougamau-Chapais Mining Camp Produced over 3 billion lbs of copper and over 4 million oz of gold Chibougamau Historic Chibougamau-Chapais Mining Camp (2): BLUE 3 billion pounds of copper and Muus 4 million ounces of gold pro

  8. Slide 8: Muus Project History

    Muus Project History Historic Exploration Blue Thunder Exploration Activities ▪ Acquired Muus property (12,000 ha) in 2017 ▪ Muus Property explored 1950’s to 1980’s ▪ Expanded landholdings to ~51,000 ha through ▪ Fancamp mostly drilled 1950’s to 1990’s staking, low-cost option agreements and ▪ Nisk,

  9. Slide 9: Priority Target Areas

    Priority Target Areas Chevrier Main Zone Deposit (3): Ind: 11Mt @ 1.2 g/t = 423Koz Inf: 6.3 Mt @ 1.3 g/t = 259Koz Fancamp Monster Lake Deposit (1): Inf: 1.1Mt @ 12 g/t = 433Koz Au 1 Joe Mann Mine Muus East Historical Production (4): 1.8Moz @ 8.5 g/t Au Muus 2 3 Meston Deposit (4): 1.2Mt @ 6.3g/t = 2

  10. Slide 10: Target Area 1: Fancamp Property

    Target Area 1: Fancamp Property ▪ Discovered by Teck in 1950’s SELECTED HISTORICAL DRILL AND TRENCH RESULTS ▪ Over 2 kilometre strike length – A to E-Zone 3.05 m of 4.60 g/t Au ▪ 105 historical core holes, mostly pre-1990’s, (MF-88-1 at 108.84 m) narrow diameter drill core, and to vertical depths <1

  11. Slide 11: Target Area 1: Fancamp Property

    Target Area 1: Fancamp Property Fancamp A, B and D-Zones Drilling, 2020 Trenching and Historical IP (Chargeability) Note: Vein Corridor projected to surface bluethundermining.com 11 TSXV:BLUE | OTCQB: BLTMF

  12. Slide 12: Target Area 1: Fancamp Property

    Target Area 1: Fancamp Property Fancamp A, B and D-Zones Plan View - 2020 Channel Sampling Results A-Zone B-Zone D-Zone Two newly discovered mineralized structur s w st f th “V i C rrid r” New zone between A and B-Zones New Zone at TR-03: 0.88 g/t Au over 2.3 m 0.50 g/t Au over 1.0 m (Including 1.50

  13. Slide 13: Target Area 1: Fancamp Property

    Target Area 1: Fancamp Property Fancamp B-Zone Plan View - 2020 Channel Sampling and Drill Hole Results Significant Drill Results (>0.5 g/t Au) Gold From To Width(1) Drill Hole Grade (m) (m) (m) (g/t) FAN20-01 115.2 117.4 2.2 0.52 Incl. 115.2 115.7 0.5 1.02 Western extension of veins: 2.0m @ 6.23 g/

  14. Slide 14: Target Areas 2 & 3: Muus Property

    Target Areas 2 & 3: Muus Property ▪ Target Area 2: covers ~18 km segment of the Guercheville Deformation Zone (“GDZ”) along the west-northwest trending sediment-volcanic contact extending from the Nelligan gold deposit ▪ Target Area 3: occurs at the Lac Bernard 2020 IP/Resistivity Grid intersection

  15. Slide 15: Other Companies in the Chibougamau District

    Other Companies in the Chibougamau District Trading at a fraction of the market cap of explorers in the region Potential for a big re-rating upon exploration success Market Cap1 C$12.3M C$65.0M C$29.1M C$78.1M Key Project(s) Muus Project Nelligan (25%) Corner Bay, TPK, (Fancamp & Muus Cedar Bay, Lac

  16. Slide 16: Strong Management Team, Accomplished Board

    Strong Management Team Accomplished Board Chad Williams Elaine Ellingham Director Executive Chairman & Director ▪ Over 30 years as a mining executive and geologist ▪ Founder and Chairman of Red Cloud Securities ▪ At Toronto Stock Exchange from 1997 to 2005 culminating as ▪ Former CEO of Victoria Gol

  17. Slide 17: Why Invest?

    Why Invest? • Largest land position in an emerging gold district with significant historical production and major new Right Location discoveries in one of the best mining jurisdictions in the world • 2020 exploration complete with initial trenching & drill program testing a high grade gold target at

  18. Slide 18: Contact Us

    Aerial photo of target area on the Fancamp Property Contact Us Blue Thunder Mining Inc. 401 Bay Street Suite 2100, P.O. Box 55 Toronto, ON, M5V 2Y4 info@bluethundermining.com 1-647-848-1009 bluethundermining.com 18 TSXV:BLUE | OTCQB: BLTMF

  19. Slide 19: Adjacent Properties

    Adjacent Properties Locations of the adjacent property boundaries are approximate bluethundermining.com 19 TSXV:BLUE | OTCQB: BLTMF

  20. Slide 20: Muus Project Airborne Surveys

    Muus Project Airborne Surveys Monster Lake Deposit (1): Fancamp Inf: 1.1Mt @ 12 g/t = 433Koz Au Muus East Joe Mann Mine Historical Production (3): 1.8Moz @ 8.5 g/t Au Muus Philibert Deposit (3): Meston Deposit (3): 1.4Mt @ 5.3g/t = 200Koz Au 1.2Mt @ 6.3g/t = 200Koz Au Nelligan Deposit (2): January 2

  21. Slide 21: New Game Changing Discovery at Nelligan

    New Game Changing Discovery at Nelligan Nelligan Maiden Resource Estimate Mineralization is not typical of the Abitibi ▪ Joint venture that is 75% owned by IAMGOLD ▪ Gold hosted in ductile-deformed sedimentary and 25% owned by Vanstar Mining units within the Druillette syncline and ▪ Inferred resour

Blue Thunder Mining — Investor Presentation (December 2020) on 6ix