Desert Gold Ventures Inc. · TSXV:DAU

Desert Gold Ventures — Investor Presentation (February 2012)

34 slides from Desert Gold Ventures's investor presentation, February 2012

  1. Slide 1: Desert Gold

    Slide 1: Desert Gold

    DESERT GOLD February 2012

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    DISCLAIMER All statements in this presentation, other than historical facts, that address exploration activities and mining potential are forward-looking statements. Although Desert Gold Ventures Inc. believes that the expectations expressed in such forward–looking statements are based on reasonable

  3. Slide 3: Investment Summary

    Slide 3: Investment Summary

    INVESTMENT SUMMARY  Exciting west African projects on the rich Senegal Mali Fault Zone  Fast resource development in Rwanda  Raising funding to develop Mali properties 3

  4. Slide 4: Investment Highlights

    Slide 4: Investment Highlights

    INVESTMENT HIGHLIGHTS  Business combination transaction with TransAfrika Belgique concluded  Increasing stock liquidity planned.  Management team has extensive experience in both operations and capital markets.  The Byumba Project in Rwanda has an initial inferred resource of 5.5 million tonnes

  5. Slide 5: Corporate Information

    Slide 5: Corporate Information

    CORPORATE INFORMATION 5

  6. Slide 6: Transaction Concluded

    Slide 6: Transaction Concluded

    TRANSACTION CONCLUDED  Desert Gold has acquired all of the issued and outstanding shares of TransAfrika Belgique (the “vendor”) in exchange for the issuance of 20 000 000 common shares of Desert Gold.  Desert Gold will be required to issue a further 12 000 000 common shares, in aggregate, to the v

  7. Slide 7: Capital Structure / Share Info

    Slide 7: Capital Structure / Share Info

    CAPITAL STRUCTURE / SHARE INFO Desert Gold Ventures Inc. share info Exchanges: TSX-V OTC-QX Ticker: DAU DAUGF New Investors NewCo Common 19,118,370 20,000,000(1) 4,949,665(2) 44,068,035 Shares Warrants - - 2,474,833(2) 2,474,833 Options 5,652,250 - - 5,652,250 Fully Diluted 24,770,620 20,000,000 7,4

  8. Slide 8: Executive Management & Directors

    Slide 8: Executive Management & Directors

    EXECUTIVE MANAGEMENT & DIRECTORS Ayub Khan Non-executive Chairman Ayub Khan was appointed to the board of directors of Desert Gold Ventures Inc., on Jan. 9, 2007. Mr. Khan brings over 20 years of experience in operations, public markets and finance to Desert Gold. Over the last 20 years he has been

  9. Slide 9: Executive Management & Directors (Continued)

    Slide 9: Executive Management & Directors (Continued)

    EXECUTIVE MANAGEMENT & DIRECTORS (CONTINUED) Thomas R. Tough, P.Eng. Director Mr. Tough joined the board of Desert Gold Ventures in 2003. He has more than 40 years experience as a self-employed consulting Professional Engineer in 40 different countries, in both the western and eastern hemispheres. I

  10. Slide 10: Use of Funds

    Slide 10: Use of Funds

    USE OF FUNDS COUNTRY PROJECT (USD) MALI Farabantourou 4 090 000 • Geological mapping • Metallurgical test work • Geophysical surveys • Environmental studies and audits • Exploration drilling • Resource statement • Resource drilling MALI Segala-Ouest 410 000 • Identify drill targets • Geophysical sur

  11. Slide 11: Use of Funds (Continued)

    Slide 11: Use of Funds (Continued)

    USE OF FUNDS (CONTINUED) Logistics & Field staff & Project Drilling Laboratories Capex Other Total Administration Consulting Farabantourou 2 260 000 680 000 740 000 290 000 120 000 4 090 000 Segala Quest 50 000 280 000 80 000 410 000 Djimbala 50 000 280 000 80 000 410 000 Byumba 2 830 000 490 000 47

  12. Slide 12: Exploration Program: Building a Gold Resource Base

    Slide 12: Exploration Program: Building a Gold Resource Base

    EXPLORATION PROGRAM BUILDING A GOLD RESOURCE BASE 12

  13. Slide 13: Mali Geological Setting

    Slide 13: Mali Geological Setting

    MALI GEOLOGICAL SETTING  Underlain by favourable gold hosting Birimien rocks and structures essential for gold deposits in West Africa  Located within Western Mali and South- western Mali Gold Belts  Farabantourou located on the Senegal-Mali Shear, a fundamental structure controlling gold mineral

  14. Slide 14: Farabantourou – Geology

    Slide 14: Farabantourou – Geology

    MALI FARABANTOUROU – GEOLOGY  Au mineralization is related to the Senegal Mali Fault Zone (SMFZ) structural event.  Mineralized structures:  Parallel to the SMFZ: Barani, Keniegoulou, Keniegoulou South  Northeast trending splay of the SMFZ : Barani East.  Northwest striking structures (thrust f

  15. Slide 15: Farabantourou - Results

    Slide 15: Farabantourou - Results

    MALI FARABANTOUROU - RESULTS Results to date  Drilling identified Au mineralization on 6 prospects  240 holes drilled gave an average grade of 2.50g/t Au  Majority of holes are short holes – scope for new discoveries  Highest value of 42g/t Au over 1m  IP surveys identify 15 drill targets on th

  16. Slide 16: Farabantourou – Results from Barani

    Slide 16: Farabantourou – Results from Barani

    MALI FARABANTOUROU – RESULTS FROM BARANI Barani East surface drill plan showing selected Au intersections Barani East drill section showing exploration potential down dip with high grade intersections in the deepest hole. 16

  17. Slide 17: Farabantourou - IP Survey Results

    Slide 17: Farabantourou - IP Survey Results

    MALI FARABANTOUROU - IP SURVEY RESULTS  IP data show potential for significantly increasing tonnages in areas of known mineralization:  Chargeable bodies coincide and extend laterally beyond gold mineralization intersected in boreholes – drilling did not test the full extend of the mineralized zon

  18. Slide 18: Segala-Ouest - Geology

    Slide 18: Segala-Ouest - Geology

    MALI SEGALA-OUEST - GEOLOGY Mines adjacent to Segala Ouest  west: Randgold ‘s Loulo Mine resource, 11.5Moz resource  east: Avion’s Segala Mine  south: Avion’s Tabakoto Mine  Segala & Tabakoto resource, 3.3Moz Gold mining on Segala Ouest:  artisanal mining along strike of the Segala Mine extend

  19. Slide 19: Segala-Ouest - Results

    Slide 19: Segala-Ouest - Results

    MALI SEGALA-OUEST - RESULTS Resistivity map of Loulo-Est showing borehole intersections above 1g/t correlating to north-south chargeable bodies and resistivity highs Drilling results:  29 holes intersected >1g/t Au  highest grade: 21.8g/t Au over 1m  other intersections: 1m @ 7.67g/t Au, 2m @ 7.3

  20. Slide 20: Segala-Ouest – Results (Continue)

    Slide 20: Segala-Ouest – Results (Continue)

    MALI SEGALA-OUEST – RESULTS (CONTINUE) Mapping:  Hard rock artisanal workings occur on the continuation of the Segala Mine and on a north-south structure at Baroya Hard rock artisanal mining at Baroya  Sub soil artisanal workings cover an area of 4 km in the south of the permit area.  Artisanal w

  21. Slide 21: Segala-Ouest - Program

    Slide 21: Segala-Ouest - Program

    MALI SEGALA-OUEST - PROGRAM In order to identify and prioritize drill targets:  Extend the IP survey to cover the granite greenstone contact  Identify mineralized structures under the sub soil diggings by covering the diggings with IP  Soil sampling continues  Trenching continues  Lay out drill

  22. Slide 22: Djimbala - Geology

    Slide 22: Djimbala - Geology

    MALI DJIMBALA - GEOLOGY Potential of the permit highlighted by:  Located within the Yanfolila Gold Belt  Favourable host rocks  Fundamental structures  Artisinal mining in five separate areas on Djimbala confirm gold mineralization on the property  50km north of Kodieran and Kalana Mines  10km

  23. Slide 23: Djimbala – Local Setting

    Slide 23: Djimbala – Local Setting

    MALI DJIMBALA – LOCAL SETTING Adjacent projects  East: Komana – Gold Fields Mali 750,000 oz of Au  West: Early stage projects  Faliko  Solana  Niechelila  Fogan Infrastructure  Easy access  220km from Bamako – accessed through 195km tarred road and 20km all weather dirt road  Connected to t

  24. Slide 24: Djimbala - Results

    Slide 24: Djimbala - Results

    MALI DJIMBALA - RESULTS Progress and Results  Successful application – Permit granted in December 2012  Reconnaissance visit completed:  5 large areas with artisanal mining  easy access to priority areas  Dialafara artisanal workings most active  New discovery by artisanal miners  Mining quar

  25. Slide 25: Djimbala - Program

    Slide 25: Djimbala - Program

    MALI DJIMBALA - PROGRAM To identify and prioritize drill targets:  Fly an Airborne Magnetic and EM survey over the permit  Carry out geological mapping and soil sampling  Cover areas with artisanal workings with IP  Test soil anomalies with trenching  Integrate data and prepare drill plan Gold

  26. Slide 26: Rwanda Geological Setting

    Slide 26: Rwanda Geological Setting

    RWANDA GEOLOGICAL SETTING  Within the Great Lakes Gold Province  Lies within the Central African Kibaran Orogen  The Kibaran hosts Banro’s Twangiza, Namoya, Lugushwa and Kamitunga deposits  Au Resources of deposits in a similar setting:  Twangiza/Kamituga 6.9Moz  Lugushwa 2.7Moz  Namoya 1.5Mo

  27. Slide 27: Rwanda Progress

    Slide 27: Rwanda Progress

    RWANDA PROGRESS  Current program targets 1Million ounces of gold  Only 6 months from start of field work to discovery  Byumba (gold)  13 028 soil samples  199 stream sediment samples  18.5 line km of IP  6 735m drilled in 40 boreholes – ongoing  6 814 core samples – ongoing  Inferred Resour

  28. Slide 28: Rwanda Byumba - Resource Definition

    Slide 28: Rwanda Byumba - Resource Definition

    RWANDA BYUMBA - RESOURCE DEFINITION Byumba Project Inferred Mineral Resource Estimate at 0.5g/t Au Cut off Facies Tonnage (Mt) Au (g/t) Density Au ounces Oxide 0.701 1.22 2.35 27 000 Transition 2.606 1.38 2.55 115 000 Fresh 2.245 1.69 2.75 122 000 Total 5.551 1.48 2.61 265 000 28

  29. Slide 29: Rwanda Byumba - Upside Potential

    Slide 29: Rwanda Byumba - Upside Potential

    RWANDA BYUMBA - UPSIDE POTENTIAL 1Moz Au target: Drill section  Mineralization is open in depth and along strike  Current drilling confirms mineralization to continue northwards  Grade increases down dip  Grade in fresh ore 1.69g/t Au 1.48g/t Au average grade  Au soil anomalies along same trend

  30. Slide 30: Rwanda Program

    Slide 30: Rwanda Program

    RWANDA PROGRAM To increase the resource  Currently increasing the gold resource by drilling on strike to the NNW  5 holes completed  30 holes planned in total for 8500m Plan and drill section showing drill progress, drilling planned and some results 30

  31. Slide 31: Goldbanks Project: 50/50 Joint Venture with Kinross

    Slide 31: Goldbanks Project: 50/50 Joint Venture with Kinross

    GOLDBANKS PROJECT: 50/50 JOINT VENTURE WITH KINROSS Nevada:  Over 30 high grade intercepts on property  13 high grade holes in the lower basement rock over acceptable mining widths  Outstanding grade values from 0.7 to 3.5 ozs. (19.6g - 98g) per ton in the basement rock  Excellent mining widths

  32. Slide 32: Milestones / Timelines

    Slide 32: Milestones / Timelines

    MILESTONES Geological Mapping Drill Planning Exploration Drilling Resource Drilling Modelling Metallurgiccal Test Work Resource Drilling Environmetnal Studies Modelling Drill Planning Mobilization Resource Drilling Environmetnal Studies Metallurgiccal Test Work Modelling Soil Sampling ie = Drill Pla

  33. Slide 33: Desert Gold Project Summary

    Slide 33: Desert Gold Project Summary

    DESERT GOLD PROJECT SUMMARY  West Africa  3 projects in highly prospective gold belts in Mali  Proven gold mineralization on all properties  Drill ready targets developed with drill holes planned  Funding for resource development required  Rwanda  Drilling continues to increase the current re

  34. Slide 34: Desert Gold Contact

    Slide 34: Desert Gold Contact

    DESERT GOLD CONTACT TransAfrika Resources Limited Desert Gold Ventures , inc Suite 510 5th Floor 1250 Hastings street Barkly Wharf Vancouver BC Le Caudan Waterfront V6E 2M4 Louis, Mauritius Roeland HH van Kerckhoven Jared Scharf Tel +230 211 862511 8625 Tel +1 +1 604 566-92404 566-9240 Fax +230 210

Source: Internet Archive copy of desertgold.ca

More decks from Desert Gold Ventures Inc.

All 20 Desert Gold Ventures decks