Slide 1: Laver, Exploration update
Laver, Exploration update Capital Markets Day November 23rd 2012 Hans Årebäck Exploration Director Boliden CMD 2012 1 2012-11-23
Slide 2: It all started with exploration in the early 1920's
It all started with exploration in the early 1920’s Oscar Falkman (later CEO) and Eric Wesslau (Exploration Manager) somewhere in northern Sweden 1923. Boliden CMD 2012 2 2012-11-23
Slide 3: The Laver story: Location
The Laver story Location Boliden CMD 2012 3 2012-11-23
Slide 4: The Laver Story: Exploration permits
The Laver Story Exploration permits Boliden CMD 2012 4 2012-11-23
Slide 5: Initial Discovery and Development
The Laver Story Initial Discovery and Development 1929 ‒ A Cu-rich boulder was found about 10 km south east of Laver by Boliden exploration. 1930 ‒ Laver deposit was discovered. 1933 ‒ The company decided to open the Laver Mine ‒ The average grade of the Laver deposit was in fact too low but t
Slide 6: Historical Production
The Laver Story Historical Production Mining was performed in small open pit but primarily underground. The Laver mine operated between 1938-1946. The ore consisted of narrow zones with “high” Cu-grade. In total 1.3 Mt @ 1.5% Cu, 0.2 g/t Au and 36 g/t Ag was mined. Boliden CMD 2012 6 2012-11-2
Slide 7: Exploration restarts
The Laver Story Exploration restarts Old mining areas have potential N 1970-1972 Old Laver mine ‒ Boliden performed a new exploration campaign. 1997 ‒ Boliden was there again… End of 1990‟s ‒ Viscaria AB performed some minor exploration. 2004-2007 ‒ Phelps Dodge had the exploration permit, b
Slide 8: New exploration ideas
The Laver story New exploration ideas Old mining areas have potential… N 2007 ‒ Boliden New ideas - new potential ‒ Earlier exploration campaigns Laver area was known to have anomalous Cu-grades ‒ Exploration target was now large volume, low grade, porphyry-style Cu- mineralization (Aitik-type). ‒
Slide 9: The Laver story: Today
The Laver story Today Boliden CMD 2012 9 2012-11-23
Slide 10: Today: Drilling 2009-2012
The Laver story Today 2008-2012 ‒ Compilation of data, fieldwork, geophysical surveying and core drilling 2009-2012 ‒ Drilling Year Drilled m No 2009 4,804 15 2010 5,039 13 2011 6,342 15 2012 18,858 48 Total 35,043 91 Boliden CMD 2012 10 2012-11-23
Slide 11: The new Laver discovery
The Laver Story The new Laver discovery Drill hole used for the Mineral Resource estimation Inferred Mineral Resource (Cu- Au-Mo) Old mine Lake Road Boliden CMD 2012 11 2012-11-23
Slide 12: The new Laver discovery: vertical cross section
The Laver Story The new Laver discovery N B A Vertical cross section 1 km m.a.s.l. A B +350 +250 +150 +50 100 m Soil Cu-Au-Mo Mineralization Drill hole Boliden CMD 2012 12 2012-11-23
Slide 13: Mineral Resource Estimation and near future activities
The Laver Story Mineral Resource Estimation and near future activities Exploration results presented May 2012 (Q1 presentation) Drilling for Inferred Mineral Resource completed in mid June 2012 Inferred Mineral Resource estimate presented here Mineralization not defined at depth and strike e
Slide 14: Exploration information
Exploration information MINERAL MINERAL RESOURCES RESERVES INFERRED Increasing INDICATED PROBABLE level of geological knowledge and confidence MEASURED PROVEN Consideration of mining, metallurgical, economic, marketing, legal, environmental, social and governmental factors The ”modifying factors” Bo
Slide 15: Mineral Resource Defined
Mineral Resource Defined Inferred Mineral Resource Nov 2012 Mt Cu Au Ag Mo S (%) (g/t) (g/t) (g/t) (%) Inferred Mineral Resource 690 0.20 0.12 2.8 35 0.53 Exploration results May 2012 Mt Cu Au Ag Mo S (%) (g/t) (g/t) (g/t) (%) Exploration results 500- 0.15- 0.10- 700 0.25 0.15 Boliden CMD 2012 15 20
Slide 16: Metals for modern life
Revisioner Under 2011 gjordes två revisioner en av dom I Indien. Metals for modern life Bilden visar en medarbetare från AVA Chemicals i Indien samtala med revisorn Camilla Ottosson. Till vänster i bilden syns den indiske tolken. 16 2012
Slide 17: Appendix: Mineral resource (JORC)
Appendix Mineral resource (JORC) A „Mineral Resource‟ is a concentration or occurrence of material of intrinsic economic interest in or on the Earth‟s crust in such form, quality and quantity that there are reasonable prospects for eventual economic extraction. The location, quantity, grade, geologi
Slide 18: Appendix: Mineral reserve, Ore reserve (JORC)
Appendix Mineral reserve, Ore reserve (JORC) A „Mineral Reserve‟ is the economically mineable part of a Measured and/or Indicated Mineral Resource. It includes diluting materials and allowances for losses, which may occur when the material is mined. Appropriate assessments and studies have been carr
Slide 19: The Laver Story: The village
The Laver Story The village Boliden CMD 2012 19 2012-11-23
Slide 20: The Village
The Laver Story The Village In 1946, a modern village for staff and their families was built in Laver, inhabiting 242 citizens. The village consisted of about 20 houses, school, food store, Community Hall etc. The houses were built with, for the time being, very high standard - central water a
Slide 21: The first mining period stop
The Laver Story The first mining period stop In 1946 Boliden decided to close the Laver mine Mining occurred at that time at about 200 m level The staff was transferred to other operations. The village and industrial buildings were removed to other operations In 1947 the whole village was
Slide 22: Geology: Rock types and mineralization
The Laver story Geology Rock types and mineralization Laver consists mainly of ca 1.9 Ga old volcanic rocks. The mineralization comprise mainly of sulphides in dissemination and veins. The main minerals are chalcopyrite, pyrrhotite, pyrite, molybdenite, magnetite and sphalerite. Boliden CMD 2012
Slide 23: Continued drilling: Inferred Mineral Resource
• Continued drilling • Potential volume and grades can be estimated • Too spaced drilling to allow interpretation of geological continuity • Inferred Mineral Resource Boliden CMD 2012 23 2012-11-23
Slide 24: Continued drilling: Indicated Mineral Resource
• Continued drilling • Geology and grade continuity assumed • Quantity delineated with reasonable probability • Design of geology and grade model • Indicated Mineral Resource Boliden CMD 2012 24 2012-11-23
Slide 25: Boliden CMD 2012
0 0.5 km Boliden CMD 2012 25 2012-11-23
Slide 26: Boliden CMD 2012
0 0.5 km Boliden CMD 2012 26 2012-11-23