Ssr Mining Inc. · NASDAQ:SSRM

Ssr Mining — Silver Standard Resources — Investor Presentation (August 2015)

36 slides from Ssr Mining's investor presentation, August 2015

  1. Slide 1: Right Company, Right Time

    RIGHT COMPANY, RIGHT TIME August 2015 Corporate Presentation SSRI:NDAQ | SSO: TSX 1

  2. Slide 2: Cautionary Notes

    Cautionary Notes Cautionary Note Regarding Forward-Looking Statements This presentation contains “forward-looking information” within the meaning of Canadian securities laws and “forward-looking statements” within the meaning of the U.S. Private Securities Litigation Reform Act of 1995 (collectively

  3. Slide 3: Why Silver Standard?

    Why Silver Standard? ASSETS CAPITAL MANAGEMENT Free cash flow $217M in cash Experienced team Two large mines ~$100M in marketable In-country expertise securities Focused portfolio Deliver to plan Strong balance sheet Strong operating performance & free cash flow SSRI:NASDAQ SSRI:NDAQ ||SSO: SSO:TSX

  4. Slide 4: Strong Start to 2015

    Strong Start to 2015  Delivered strong production at lower costs in Q2  Marigold: 49Koz gold at $717/oz cash cost  Pirquitas: 2.4Moz silver at record low $9.45/oz cash cost  $52.3M of cash generated by operating activities in H1  $1.8M net income in H1  Cost improvements from Operational Excel

  5. Slide 5: Strong Production and Cost Profile

    Strong Production and Cost Profile 8.0 $16 $14.34 $14.29 6.9 6.0Moz 6.8 $12.36 Silver Equivalent Production (Moz) Silver Equivalent Cash Costs ($/oz) 6.0 6.0 $10.78 $12 5.1 Silver Eq. Production in 2Q15 $9.57 $9.74 4.0 $8 3.5 1.9 $9.74/oz 2.0 $4 0.0 $0 Silver Eq. Cash Costs in 2Q15 Q1 Q2 Q3 Q4 Q1 Q2

  6. Slide 6: Marigold: Established Gold Mine

    MARIGOLD ESTABLISHED GOLD MINE SSRI:NDAQ | SSO: TSX 6

  7. Slide 7: Improved Operating and Political Profile

    Improved Operating and Political Profile  Open pit, run-of-mine heap leach gold operation  Continuous production since 1988  Strong safety and environmental practices Twin Creeks Goldstrike MARIGOLD Maverick Springs Phoenix  Excellent infrastructure Cortez Carlin Trend  Probable Mineral Reserve

  8. Slide 8: Invested $160M in 2012 and 2013

    Invested $160M in 2012 and 2013 Shovel Capacity Hauling Capacity Haul Truck Maintenance (Cubic Yards) (Tonnes) (Hours) 150 5,000 20 Maintain Wash 18 Trucks 100 3 Shovels 12 Trucks 2,500 2 Shovels 10 50 0 0 0 2012 2014 2012 2014 2012 2014 Operational Excellence for increased efficiency and lower cost

  9. Slide 9: Loading Trends Leading to Lower Costs

    Loading Trends Leading to Lower Costs Rope Shovel Availability Rope Shovel Utilization +20% 100% +36% 90% 90% 80% 80% 70% 70% 60% 60% 50% 50% Q1 Q2 Q3 Q4 Q1 Q2 Q1 Q2 Q3 Q4 Q1 Q2 2014 2014 2014 2014 2015 2015 2014 2014 2014 2014 2015 2015 Tonnes Moved per Day +18% 210 190 170 150 Q1 Q2 Q3 Q4 Q1 Q2 20

  10. Slide 10: Operational Excellence: Long-term Cost Savings

    Operational Excellence: Long-term Cost Savings $1.92 Total cost per tonne mined $1.74 $1.70 $1.61 $1.62 $1.57 $1.48 2013 Q1 2014 Q2 2014 Q3 2014 Q4 2014 Q1 2015 Q2 2015 Savings of 1₵ cost per tonne mined = $700,000 annually Notes: Annual savings of $700,000 based on assumption of 70 million tonnes o

  11. Slide 11: Improved 2015 Gold Guidance

    Improved 2015 Gold Guidance Gold Production (Koz) Cash Cost per Ounce of Capital ($M) Gold Sold ($/oz) $50 195 - 205 200 $900 $838 $725 - $800 160 - 175 $40 $700 - $750 $20 150 130 $11 $30 $600 $25 100 $20 $300 $25 $25 $10 50 $13 $0 0 $0 2014 Previous Revised 2014 Previous Revised 2014 Previous Revi

  12. Slide 12: Marigold Going Forward

    Marigold Going Forward  Operational excellence to drive costs down  Assay Program increases 2015 gold production by 12%  Add oxide Mineral Reserves through drilling  Explore depth for sulphide mineralization Focused on increasing reserves and margin SSRI:NASDAQ SSRI:NDAQ ||SSO: SSO:TSX TSX 12

  13. Slide 13: Resource Discovery and Reserve Conversion

    Resource Discovery and Reserve Conversion  Added Mineral Reserves in the W Reserve Pit E Resource Shell Mackay pit area in 2014 … expect (2 ) trend to continue  8 South: Recent drill program extends mineralization; goal to 500 feet Cross-section A – A’ convert to Mineral Reserves Reserve Pits Mine

  14. Slide 14: Assay Program – Increases Ore Zones

    Assay Program – Increases Ore Zones Pit Outline as of April 2015 Mackay Phase 3 Pit Outline Mineralized Ore as at December 2014 250 feet W E SSRI:NASDAQ SSRI:NDAQ ||SSO: SSO:TSX TSX 14

  15. Slide 15: Assay Program – Increases Ore Zones

    Assay Program – Increases Ore Zones Pit Outline as of April 2015 Mackay Phase 3 Pit Outline Mineralized Ore as at December 2014 Additional Ore Tonnage and Ounces 250 feet W E Increases tonnage 21%; Increases ounces 12% Notes: See news release dated July 6, 2015 for additional information on the Mari

  16. Slide 16: Pirquitas: Large Open-Pit Silver Mine

    PIRQUITAS LARGE OPEN-PIT SILVER MINE SSRI:NDAQ | SSO: TSX 16

  17. Slide 17: Proven Capability and Delivery

    Proven Capability and Delivery  100% owned and operated silver and zinc mine  2010: Invested capital  2011/12: Delivered predictable production  2013: Improved cost structure, completed push back Pirquitas Mine Jujuy, Argentina  2014: Repositioned on cost curve, record annual production Diablil

  18. Slide 18: Actively Managing Costs Down for Long Term

    Actively Managing Costs Down for Long Term $19.70 Cash costs per payable $16.88 ounce of silver sold $12.87 $11.50 - $12.50 $12.08 $11.25 $10.50 - $11.50 $9.45 2011 2012 2013 2014 Q1 2015 Q2 2015 Previous Revised Guidance Guidance 2015 2015 Cash costs declined 16% sequentially Note: Cash costs are a

  19. Slide 19: Strong Sustainable Operating Performance

    Strong Sustainable Operating Performance Q2 2015 Q1 2015 Q4 2014 Q3 2014 Q2 2014 Q1 2014 Strip ratio w/o 3.0 3.4 4.9 7.9 7.1 10.4 Silver mined grade g/t 172 184 150 160 167 163 Silver mill feed grade g/t 262 267 222 248 213 204 Silver recovery % 83.7% 83.9% 83.8% 78.7% 74.3% 72.1% Zinc recovery (zin

  20. Slide 20: Improved 2015 Silver Guidance

    Improved 2015 Silver Guidance Silver Production (Moz) Cash Cost per Ounce of Capital ($M) Silver Sold ($/oz) 12.0 9.5 - 10.5 $11.50 - 9.0 - 10.0 $12.08 $12.50 $10.50 - $11.50 $20 8.7 8.0 $10 $11 $10 4.0 $5 $10 $10 0.0 $0 $0 2014 Previous Revised 2014 Previous Revised 2014 2015 Guidance Guidance Guid

  21. Slide 21: Exploration Emphasis at Pirquitas

    Exploration Emphasis at Pirquitas 2015 Exploration Goals  Upgrade San Miguel UG Mineral Resources San Miguel Open Pit  Drilling surface targets  Permit additional properties  Highlighted drill results  6.9 meters at 1,038 g/t silver Acquired exploration  18 meters at 517 g/t silver access in 2

  22. Slide 22: Properties, Projects and Production

    Properties, Projects and Production 10 1 8 7 7. Candelaria 11 3 9 1. Marigold 8. Maverick Springs 5. Diablillos 3. Pitarrilla 9. San Marcial 2. Pirquitas 6. Berenguela 4 4. San Luis 6 10. Sunrise Lake 2 5 11. Parral + $570M SSRI:NASDAQ SSRI:NDAQ ||SSO: SSO:TSX TSX 22

  23. Slide 23: San Luis: Dual Option to Value

    San Luis: Dual Option to Value Ancash Region, Peru  High grade mineralization N with Mineral Resources of:  8.9M oz Ag at 595.5 g/t  0.35M oz Au at 25.2 g/t  Already secured Ecash Community  EIA Ayelén Vein  Feasibility study  Going forward  Pursuing community San Simon Vein agreements Bonit

  24. Slide 24: Pitarrilla: Large Option

    Pitarrilla: Large Option Parral Mining District  Open pit project Chihuahua  Conventional flotation and leaching Pitarrilla Project Durango  695 Moz silver Mineral Resources Mexico (Measured and Indicated)  Evaluating optimization of mine plan  Continued exploration of land position  Water mor

  25. Slide 25: Why Silver Standard in 2015

    Why Silver Standard in 2015  Management team  Corporate level that delivers free cash flow  Focus on operational  Strong balance excellence sheet  Cost discipline  Strategy for growth SSRI:NASDAQ SSRI:NDAQ ||SSO: SSO:TSX TSX 25

  26. Slide 26: Authentic

    (2) Authentic SSRI:NASDAQ SSRI:NDAQ ||SSO: SSO:TSX TSX 26

  27. Slide 27: Mineral Reserves

    Mineral Reserves (as at December 31, 2014) Mineral Reserves Location Tonnes Silver Gold Zinc Silver Gold millions g/t g/t % million oz million oz Proven Mineral Reserves San Luis Peru 0.06 604.5 28.3 1.1 0.05 Total 1.1 0.05 Probable Mineral Reserves Pirquitas Argentina 5.37 220.10 0.47 38.0 Pirquita

  28. Slide 28: Mineral Resources: Measured and Indicated

    Mineral Resources: Measured and Indicated (as at December 31, 2014) Mineral Resources Location Tonnes Silver Gold Lead Zinc Copper Silver Gold millions g/t g/t % % % million oz million oz Measured Mineral Resources (Inclusive of Proven Mineral Reserves) Pitarrilla Mexico 20.30 95.40 62.3 San Luis Pe

  29. Slide 29: Mineral Resources: Inferred

    Mineral Resources: Inferred (as at December 31, 2014) Mineral Resources Location Tonnes Silver Gold Lead Zinc Copper Silver Gold millions g/t g/t % % % million oz million oz Inferred Mineral Resources Pirquitas UG Argentina 2.85 174.0 3.61 15.9 Marigold U.S. 18.20 0.44 0.26 Pitarrilla Mexico 22.10 6

  30. Slide 30: Reserves & Resources: Notes to Tables

    Reserves & Resources: Notes to Tables All estimates set forth in the Mineral Reserves and Mineral Resources tables have been prepared in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects (“NI 43-101”). The estimates of Mineral Reserves and Mineral Resources fo

  31. Slide 31: Marigold Exploration Drill Program

    Marigold Exploration Drill Program Selected drillhole highlights from the 8 South Extension (8SX) and 8D areas: From To Width Gold Grade Hole ID Deposit Area (metres) (metres) (metres) (g/tonne) MRA6034 140.2 231.6 91.4 2.48 8SX Including 178.3 214.9 36.6 5.86 8SX MR6042 210.3 259.1 48.8 1.17 8D Inc

  32. Slide 32: Valmy Property Location

    Valmy Property Location Notes: See news release dated August 11, 2015 announcing the acquisition of the Valmy Property at Marigold. See also “Cautionary Notes” in this presentation. SSRI:NASDAQ SSRI:NDAQ ||SSO: SSO:TSX TSX 32

  33. Slide 33: San Luis Project

    San Luis Project San Luis Feasibility Study Results (June 2010)  3.5-year life: Underground mine  Avg. annual 1.9M oz Ag production: 78,000 oz Au  Cash cost: $313 / oz Au  Resources (M+I): 9.0M oz Ag at 578.1 g/t 0.35M oz Au at 22.4 g/t  Capital: $90 -$100M  Mill throughput: 400 tpd  NPV: $39

  34. Slide 34: Increased Financial Strength

    Increased Financial Strength $390M $265M Cash, Marketable Securities and Credit Facility Convertible Notes Source: $390 million includes $217 million of Cash and Cash Equivalents, $98 million of marketable securities and $75 million of undrawn senior secured credit facility. Cash and marketable secu

  35. Slide 35: Notes

    Notes SSRI:NASDAQ SSRI:NDAQ ||SSO: SSO:TSX TSX 35

  36. Slide 36: Corporate Presentation

    CORPORATE PRESENTATION SSRI:NDAQ | SSO: TSX 36

Silver Standard Resources — Investor Presentation (August 2015) on 6ix