Slide 2: Italy and Po Valley
ITALY AND PO VALLEY For personal use only Gas Consumption 3 tcf p.a. Growing at 2-3% p.a High gas prices USD11/mcf Gas Production 27 tcf to date Europe’s 2nd largest Po Valley onshore gas province Europe’s largest Val D’Agri onshore oil field Po Valley/Northern Adriatic was monopoly of
Slide 3: PVE January 2005: Italian gas price and assets
PVE JANUARY 2005 For personal use only ITALIAN GAS PRICE: EUR14cents/cubic metre Castello 100% Undrilled Sillaro 100% Undrilled Sant’Alberto 50% 1 well drilled Page 2
Slide 4: PVE May 2010: Italian gas price and assets
PVE MAY 2010 For personal use only ITALIAN GAS PRICE: EUR27cents/cubic metre Castello 100% 1 well drilled + Surface plant installed + Production Sillaro 100% 2 wells drilled + Surface plant installed + Production Sant’Alberto 100% 1 well drilled + Production concession appl. Bezzecca 100% 1 well dri
Slide 5: Resource Base
RESOURCE BASE Po Valley Assets For personal use only 11 License areas 2 Production projects Sillaro Castello 2 Drilling projects Sant’ Alberto Bezzecca 5 Gas Discoveries for appraisal 12 Gas Exploration prospects 2 Oil opportunities Page 4
Slide 6: Italian ENI gas release price: September update
PRICES RISING DUE TO FALLING EUR AND RISING OIL PRICES For personal use only ITALIAN ENI GAS RELEASE PRICE: SEPTEMBER UPDATE Source: ENI Gas Release and forecast sourced from Alba Soluzioni; Driver parameters and forward curves sourced from Bloomberg Page 5
Slide 7: PVE Reserve & Resource Categorization
PVE RESERVE & RESOURCE CATEGORIZATION For personal use only Page 6
Slide 8: Reserves and Resources Management Assessment
RESERVES AND RESOURCES MANAGEMENT ASSESSMENT For personal use only TIMING OF RESERVES / PROJECT CURRENT ASSESSMENT (BCF) RESOURCES REVIEW RESERVES 1P 2P CASTELLO 0.1 3.7 Completed SILLARO 8.1 8.8 Completed TOTAL RESERVES 8.2 12.5 CONTINGENT RESOURCES 1C 2C SANT’ ALBERTO 8.0 12.9 4Q 2010 BEZZECCA 0.7
Slide 9: 2010/2011 Game Plan
2010/2011 GAME PLAN For personal use only Produce steadily from Sillaro and look to expand through Fantuzza-1 Drill new Castello well and recommence at original target production rates Achieve preliminary development approval for Sant’Alberto and Bezzecca Secure full award of Cadelbosco di S
Slide 10: Sillaro successfully drilled and tested
SILLARO SUCCESSFULLY DRILLED AND TESTED 6 reservoir levels confirmed For personal use only 2 new previously untested levels Well completed safely on schedule on budget Initial Production Page 9
Slide 11: Sillaro plant 100% complete and in production
SILLARO PLANT 100% COMPLETE AND IN PRODUCTION For personal use only On the left side the Major of Medicina town visiting the plant with Po Valley Chairman ON THE LEFT SIDE THE REPRESENTATIVE OF BOLOGNA MINISTRY MR . GIACCHETTA AND THE MAJOR OF THE MEDICINA TOWN MR. RAMBALDI VISITING SILLARO PLANT Pa
Slide 12: Sillaro production summary: May-August 2010
SILLARO PRODUCTION SUMMARY: 18 MAY- 28 AUGUST 2010 For personal use only Page 11
Slide 13: Fantuzza can feed into Sillaro
FANTUZZA CAN FEED INTO SILLARO Targeting 2,600m Miocene For personal use only structure Previously drilled and tested by ENI 50km of seismic acquired and processed Fantuzza-1 site selected, drilling approvals in process, equipment purchased and drilling rig contracted Sillaro surface plant
Slide 14: 2010/2011 Game Plan
2010/2011 GAME PLAN For personal use only Produce steadily from Sillaro and look to expand through Fantuzza-1 Drill new Castello well and recommence at original target production rates Achieve preliminary development approval for Sant’Alberto and Bezzecca Secure full award of Cadelbosco di S
Slide 15: Castello plant inauguration: January 2010
CASTELLO PLANT INAUGURATION: 12 JANUARY 2010 For personal use only Page 14
Slide 16: Castello structure
CASTELLO STRUCTURE For personal use only Page 15
Slide 17: Castello production scenario
CASTELLO PRODUCTION SCENARIO For personal use only Action Plan: Acquire key seismic Plan and secure approval to drill new well Drill Vitalba-1dirA NEW WELL Connect to Castello plant Page 16
Slide 18: 2010/2011 Game Plan
2010/2011 GAME PLAN For personal use only Produce steadily from Sillaro and look to expand through Fantuzza-1 Drill new Castello well and recommence at original target production rates Achieve preliminary development approval for Sant’Alberto and Bezzecca Secure full award of Cadelbosco di S
Slide 19: Sant'Alberto: seismic to be acquired 3rd quarter
SANT’ALBERTO – SEISMIC TO BE ACQUIRED 3rd QRT For personal use only Block 5 Page 18
Slide 20: Bezzecca-2 (Cascina S. Pietro permit)
BEZZECCA-2 (CASCINA S.PIETRO PERMIT) a a’ For personal use only a Target depth 2000m da inserire Pliocene - Miocene Contingent Resources 3.1Bcf a’ Page 19
Slide 21: Bezzecca can feed into Castello
BEZZECCA CAN FEED INTO CASTELLO For personal use only Page 20
Slide 22: 2010/2011 Game Plan
2010/2011 GAME PLAN For personal use only Produce steadily from Sillaro and look to expand through Fantuzza-1 Drill new Castello well and recommence at original target production rates Achieve preliminary development approval for Sant’Alberto and Bezzecca Secure full award of Cadelbosco di S
Slide 23: Correggio: strong addition to the portfolio
CORREGGIO: STRONG ADDITION TO THE PORTFOLIO For personal use only Quaternary potential Pliocene potential Pliocene potential Production to date ~240 bcf Potential P50 gas discoveries ~ 35 bcf Planned 3D seismic coverage Quaternary and Pliocene targets Page 22
Slide 24: Expansion offshore: Azzurra (AR168PY)
EXPANSION OFFSHORE: AZZURRA (AR168PY) Major gas production zone in Italy For personal use only Shallow water depth ~20m Full 3D seismic coverage 4 drilled and tested prospects Azzurra Ginevra Adele Irma/Carola Preliminary award to Po Valley: July 2008 G&G work underway Pipeline
Slide 25: 2010/2011 Game Plan
2010/2011 GAME PLAN For personal use only Produce steadily from Sillaro and look to expand through Fantuzza-1 Drill new Castello well and recommence at original target production rates Achieve preliminary development approval for Sant’Alberto and Bezzecca Secure full award of Cadelbosco di S
Slide 26: New Prospects
12 NEW PROSPECTS For personal use only Page 25
Slide 27: 2010/2011 Game Plan
2010/2011 GAME PLAN For personal use only Produce steadily from Sillaro and look to expand through Fantuzza-1 Drill new Castello well and recommence at original target production rates Achieve preliminary development approval for Sant’Alberto and Bezzecca Secure full award of Cadelbosco di S
Slide 28: Po Valley Capital Structure
PO VALLEY CAPITAL STRUCTURE For personal use only Shares (m) held Substantial Shareholders % as at 31 August 2010 Michael Masterman 26.0 23.6% Hunter Hall 13.3 12.1% Beronia Investments 7.1 6.5% Other Investors 63.7 57.8% TOTAL SHARES 110.1 Market Capitalization (at A$0.25*) (€19.5m) A$27.5m Cash at
Slide 29: Bank of Scotland - Reservoir Facility
BANK OF SCOTLAND - RESERVOIR FACILITY For personal use only Facility Size: €20 million (Current Borrowing base EUR8m) Use of Funds: Put Castello in production (EUR3m) Drill Sillaro 2 and Install Surface plant (EUR7m) Term: 5 years expiring 15 November 2013 Borrowing base limit set on semi annual bas
Slide 30: Board of Directors
BOARD OF DIRECTORS For personal use only Mr Graham Bradley Former CEO - Perpetual, Blake Dawson Waldron Non-executive Chairman Director – Singtel Chairman – HSBC, Stockland, Boart Longyear Mr David McEvoy 33 years Exxon/Esso Non-executive Director Director - Woodside Petroleum, AWE, Innami
Slide 31: Management Team
MANAGEMENT TEAM For personal use only Mr Giovanni Catalano 32 years’ experience in the upstream oil and gas industry Deputy Chief Executive Officer Chief Executive Officer of Mediterranean Oil & Gas plc Prior Business Manager for Woodside Energy Mr Franco Benelli 35 years with ENI Chairman T
Slide 32: Growth and Profit Outlook
GROWTH AND PROFIT OUTLOOK For personal use only Gas Production with strong growth potential Active appraisal and exploration program funded by farmouts Completed reserve review – solid base to build Conservative balance sheet Profit and earnings growth Page 31
Slide 33: Disclaimer
Disclaimer For personal use only This presentation should not be considered as an invitation or recommendation to purchase securities in PVE. PVE has not audited or investigated the accuracy or completeness of the information, statements and opinions contained in this presentation. Accordingly, to t