B2gold Corp. · TSX:BTO

B2gold — Investor Presentation (August 2025)

53 slides from B2gold's investor presentation, August 2025

  1. Slide 1: A Responsible International Senior Gold Producer

    A Responsible International TSX BTO NYSE AMERICAN BTG NSX B2G Senior Gold Producer CORPORATE PRESENTATION AUGUST 2025 ACQUIRE DISCOVER FINANCE BUILD OPERATE 1

  2. Slide 2: Cautionary Statements

    CAUTIONARY STATEMENTS Production results and production guidance presented in this presentation reflect total production at the mines B2Gold operates on a the lack of sole decision-making authority related to Filminera Resources Corporation, which owns the Masbate Project; challenges to title 100% p

  3. Slide 3: Globally Diversified Senior Gold Producer

    GLOBALLY DIVERSIFIED SENIOR GOLD PRODUCER BACK RIVER GOLD DISTRICT Nunavut, Canada CENTRAL LAPLAND JV Finland HEAD OFFICE Vancouver, Canada FEKOLA COMPLEX1 MASBATE GOLD PROJECT GRAMALOTE Mali Philippines Colombia OTJIKOTO MINE Namibia Producing Mine Development Project Exploration Project Headquarte

  4. Slide 4: Health & Safety Performance

    HEALTH & SAFETY PERFORMANCE Q2 2025 Consolidated Highlights1 LTIFR TRIFR Severity Rate Masbate Fekola 0.08 0.42 4.52 Zero LTI Zero LTI Lost Time Injury Total Recordable Lost Time + Restricted 2,418 days (+6 years) 514 (+1year) Frequency Rate Injury Frequency Rate Workdays +43.1 million hours worked

  5. Slide 5: Strong & Profitable Production Profile

    STRONG & PROFITABLE PRODUCTION PROFILE Robust Production Levels Expected in 2025 1,400 $1,490 - $1,600 $1,550 4 1,200 970 - 1,075 $1,400 1,061 $1,465 1,041 1,047 1,028 980 $1,201 Guidance Range 1,000 954 $1,033 $1,200 $1,201 Fekola Gold Production (koz) $947 805 $1,000 800 Otjikoto AISC ($/oz Au) $8

  6. Slide 6: Corporate Strategy

    CORPORATE STRATEGY Maintain the highest standards of Maximize profitable gold production from responsible mining, government existing mines while increasing Mineral relationships, Health, Safety & Reserves and Mineral Resources Environment stewardship and Corporate Social Responsibility (“CSR”) prog

  7. Slide 7: Corporate Structure

    CORPORATE STRUCTURE SNAPSHOT (as of August 13, 2025) ANALYST COVERAGE SHAREHOLDERS3 TSX: BTO NYSE AMERICAN: BTG Bank of America Securities C$4.70 Share Price C$5.33 BMO Capital Markets C$7.50 Institutional Basic Shares Outstanding 1,322M Canaccord Genuity C$8.00 Basic Market Capitalization C$7.0B CI

  8. Slide 8: Q2 2025 Results & 2025 Guidance

    Q2 2025 RESULTS & 2025 GUIDANCE Gold Production, Cash Operating Costs & All-In Sustaining Costs Q1 2025 Q2 2025 Q3 2025 Q4 2025 Fekola 93,805 oz 126,361 oz Masbate 46,369 oz 50,738 oz Otjikoto 52,578 oz 51,663 oz Goose - 692 oz TOTAL 192,752 oz 229,454 oz 2025 YTD Production 422,206 oz YTD 2025 ACTU

  9. Slide 9: 2025 Production & Cost Guidance

    2025 PRODUCTION & COST GUIDANCE 2025 UPDATED GUIDANCE Gold production 970 koz - 1,075 koz Cash operating costs1,3 $795 - $855 /oz AISC1,3 $1,490 - $1,550 /oz FEKOLA COMPLEX Mali 52% MASBATE GOLD PROJECT The Philippines 18% 52% Type Open Pit / Underground Type Open Pit Gold production 515 koz - 550 k

  10. Slide 10: Organic Production Pipeline

    ORGANIC PRODUCTION PIPELINE Potential to bring on over 750,000 ounces of new annual production within the next 5 years GOOSE PROJECT (2026 - 2031) Potential new production through end of decade ~300,000 oz / year +750,000 oz First production achieved in Q2 2025 Ramp up underway to full production, e

  11. Slide 11: Back River Gold District Overview

    BACK RIVER GOLD DISTRICT OVERVIEW GOOSE PROJECT Nunavut, Canada1 Type Open Pit / Underground B2Gold Ownership 100% Processing Throughput (design) 1.5 Mtpa (4,000 tpd) Mineral Reserve Grade 6.82 g/t Au Gold Recovery (estimate) 92.5% Gold Production (estimate) 300,000 oz per year (2026 to 2031) 120 -

  12. Slide 12: Back River Gold District Highlights

    BACK RIVER GOLD DISTRICT HIGHLIGHTS Large, High-Grade Resource1 Measurable Exploration Upside Tier-1 Jurisdiction With an estimated average head grade of Back River is a multigenerational district with Canada ranks consistently as one of the ~6.82 g/t gold, the Goose Project ranks among the 11 claim

  13. Slide 13: Back River Gold District Map

    BACK RIVER GOLD DISTRICT MAP GOOSE (152 km2 license) Hosts 6 gold deposits fully permitted for mining; additional targets being tested GEORGE (168 km2 license) ~50 km northwest of Goose, consists of over 20 km of iron formation BOOT (100 km2 license) Hosts multiple mineralized structures intersectin

  14. Slide 14: Mineral Reserve & Resource Estimate

    MINERAL RESERVE & RESOURCE ESTIMATE Strong Resource Base with Unrealized Exploration Upside Mineral Reserve 1 Robust Mineral Resource TONNES GRADE GOLD OZ 16% improvement in Indicated Mineral Resource grade & 14% AREA (x 1,000) (g/t Au) (x 1,000) improvement in Inferred Mineral Resource grade versus

  15. Slide 15: Goose Project Mineral Reserve Life of Mine

    GOOSE PROJECT MINERAL RESERVE LIFE OF MINE Summary Results of the Updated Mineral Reserve Life of Mine Plan Mineral Reserve Life of Mine Plan Results 1,2,3 Technical Report Overview Steady State Years Mineral Reserve Evaluates recovery of gold from 4 open pit deposits and 1 (2027 – 2031) Life of Min

  16. Slide 16: Goose Technical Report Highlights

    GOOSE TECHNICAL REPORT HIGHLIGHTS1 Robust Mineral Resource Meaningful Gold Production Profile Attractive AISC Anticipated 16% improvement in Indicated Mineral Resource Initial Mineral Reserve mine life of approx. 9 From 2025 through 2027 AISC are impacted by grade & 14% improvement in Inferred Miner

  17. Slide 17: Goose Project Opportunities

    GOOSE PROJECT OPPORTUNITIES B2Gold has begun multiple optimization studies with the goal of maximizing the long-term value of the Back River Gold District, including: Evaluating a flotation / concentrate leach process; potential option to increase gold recovery and reduce processing and operating co

  18. Slide 18: Goose Project Exploration

    GOOSE PROJECT EXPLORATION1 Goose Project Long Section: Open-Ended Exploration Potential Umwelt Mineral Reserve Llama Mineral Reserve Open Pit: 650,000 oz @ 7.75 g/t Au Echo Mineral Reserve Goose Main Mineral Reserve 290,000 oz @ 6.39 g/t Au Underground: 1,010,000 oz @ 8.30 g/t Au 30,000 oz @ 5.69 g/

  19. Slide 19: Goose Project Exploration

    GOOSE PROJECT EXPLORATION Exploration and Infill Drill Result Highlights from B2Gold’s 2024 Goose Project Drilling Campaign NEAR MINE EXPLORATION TARGETS 7,361 m of drilling over 14 drill holes completed 26,209 m DRILLED IN 69 HOLES in 2024 Nuvuyak Deposit: 24GSE-683Z1 6.39 g/t Au over 28.80 m, incl

  20. Slide 20: Goose Mine Progress

    GOOSE MINE PROGRESS Commercial Production Expected September 2025 WINTER ICE ROAD MARINE LAYDOWN AREA GOOSE SITE PROCESS PLANT GOOSE PROJECT SITE 2025 WIR opened February 18, 2025 Sealift offloading performance Mill commissioning progressing on Echo pit mining concluded May (3 weeks improvement comp

  21. Slide 21: Goose Optimization & Development

    GOOSE OPTIMIZATION & DEVELOPMENT With the first gold pour having been achieved on June 30, 2025, the Company is now turning focus to ramping up to commercial production in the third quarter 20251 First ore was introduced to the Goose Mine processing facilities on June 24, 2025 Current activities rem

  22. Slide 22: Goose Mine Updates

    GOOSE MINE UPDATES Goose Project Site Area Marine Laydown Area New Hardwall Camp Lower Laydown Expansion 22

  23. Slide 23: Fekola Overview

    FEKOLA OVERVIEW FEKOLA COMPLEX Mali Type Open Pit B2Gold Ownership 80% / 65%1 Processing Throughput 9.0 Mtpa Mineral Reserve Grade 1.73 g/t Au2 Gold Recovery ~92.0% 515 - 550 koz $1,595 - $1,655 2025 gold production 2025 AISC3 guidance guidance 2014 2015 2017 2019 2025 Acquired Construction Open Pit

  24. Slide 24: Fekola Complex Map

    FEKOLA COMPLEX MAP MEDINANDI (75 km2 exploitation license) Hosts Fekola deposit (including Fekola Underground) and Cardinal zone MENANKOTO (162 km2 exploration permit) Approx. 20 km north of Fekola Hosts southern portion of Mamba, northern portion of Cobra Hosts the northern strike extension of the

  25. Slide 25: Fekola Complex Growth

    FEKOLA COMPLEX GROWTH Fekola Regional and Fekola Underground to Significantly Increase Gold Production in 2025 Initial gold production from Fekola underground achieved in Q3-2025 Mining and trucking operations anticipated to commence at Fekola Regional in H2 2025 FEKOLA MILL Existing Sources Develop

  26. Slide 26: Mali Agreement on Fekola Complex

    MALI AGREEMENT ON FEKOLA COMPLEX1 STATE OF MALI TO ISSUE FEKOLA MINE GOVERNED BY EXPLOITATION PERMITS FOR 2012 MINING CODE; FEKOLA FEKOLA REGIONAL AND REGIONAL GOVERNED BY FEKOLA UNDERGROUND2 2023 MINING CODE Fekola Regional expected to contribute 20,000 to Fekola Mine governed by 2012 Mining Code 2

  27. Slide 27: Fekola Complex Mineral Resources

    FEKOLA COMPLEX MINERAL RESOURCES Mineral Resources1 TONNES GRADE GOLD OZ AREA (x 1,000) (g/t Au) (x 1,000) Resource (Indicated) Fekola Open Pit 82,770 1.28 3,400 Cardinal Zone 11,720 1.43 540 FNE Zone 4,510 1.24 180 Total Fekola Mine 99,000 1.29 4,110 Anaconda Area 56,860 1.11 2,030 Dandoko Area 8,5

  28. Slide 28: Otjikoto Overview

    OTJIKOTO OVERVIEW OTJIKOTO MINE Namibia Type Open Pit / Underground B2Gold Ownership 90% Processing Throughput 3.4 Mtpa Mineral Reserve Grade 3.24 g/t Au1 Gold Recovery ~98.0% 165 - 185 koz $965 - $1,025 2025 gold production 2025 AISC2 guidance guidance 2014 2013 2014 2022 2023 Acquired Construction

  29. Slide 29: Otjikoto Growth – Antelope Deposit

    OTJIKOTO GROWTH – ANTELOPE DEPOSIT Initial Inferred Mineral Resource Estimate for the Springbok Zone meets threshold for PEA High-grade, Otjikoto-style mineralization discovered ~4 km southwest of the existing open pit at Otjikoto Over 36,000 m drilled at the Springbok Zone to inform the initial Inf

  30. Slide 30: Antelope Deposit – PEA Overview

    ANTELOPE DEPOSIT – PEA OVERVIEW Enhanced Production Profile PRODUCTION PROFILE 2025 PEA1 65,000 ounces average annual gold Life of Mine (years) 5 production over a 5 year mine life Ore Tonnes Processed (Mt) 1.9 Average Gold Grade Processed (g/t) 5.75 Strong Project Economics Process Gold Recovery (%

  31. Slide 31: Antelope Deposit – PEA Production Profile

    ANTELOPE DEPOSIT – PEA PRODUCTION PROFILE Incremental Production and Cost Profile 1 120,000 $1,800 5 years $1,600 100,000 Life of Mine $1,400 327 koz Gold Production (oz) 80,000 $1,200 AISC (US$/oz) Life of Mine gold $1,000 production 60,000 $800 65 koz 40,000 $600 Average annual gold production $40

  32. Slide 32: Masbate Overview

    MASBATE OVERVIEW MASBATE GOLD PROJECT The Philippines Type Open Pit B2Gold Ownership 100%1 Processing Throughput 8.0 Mtpa Mineral Reserve Grade 0.73 g/t Au2 Gold Recovery ~74.0% 170 - 190 koz $1,245 - $1,305 2025 gold production 2025 AISC3 guidance guidance 2008 2009 2013 2016 2025 Construction Open

  33. Slide 33: Gramalote Project – FS Overview

    GRAMALOTE PROJECT – FS OVERVIEW PRODUCTION PROFILE 2025 FS 6.0 Mtpa1 Significant Production Profile Life of Project (years) 13 Total Processed Tonnes (t) 76,700,000 177,000 ounces average annual gold production over a 13 year project life Processing Rate (tpa) 6,000,000 Processed Feed Grade (g/t) 0.

  34. Slide 34: Gramalote Project – FS Production Profile

    GRAMALOTE PROJECT – FS PRODUCTION PROFILE1 2025 FS 6.0 Mtpa - Gold Production 300 EST. 2.5 YEAR CONSTRUCTION 13 years 250 Life of Project 2.3 Moz Gold Production (koz) 200 Life of Project gold production 150 227 koz Average yearly gold production 100 over first 5 years 177 koz 50 Average Life of Pro

  35. Slide 35: 2025 Exploration Budget

    2025 EXPLORATION BUDGET BACK RIVER | NUNAVUT, CANADA FEKOLA COMPLEX1 | MALI OTJIKOTO | NAMIBIA MASBATE | THE PHILIPPINES Budget $32M Budget $9M Budget $7M Budget $3M Program 25,000 meters Program 16,000 meters Program 44,000 meters Program 4,200 meters • Drilling will target extensions of the • Ongo

  36. Slide 36: Strategic Investments

    STRATEGIC INVESTMENTS Portfolio value of over $300M ~$110M ~$15M ~$1.5M ~$1.5M ~$175M SNOWLINE GOLD1 FOUNDERS METALS2 AuMEGA METALS3 PROSPECTOR METALS4 VERSAMET ROYALTIES5 Exploration | Yukon Exploration | Suriname Exploration | Newfoundland Exploration | Yukon Diversified Metals Royalties ~9.9% Own

  37. Slide 37: Organic Growth Catalysts Being Advanced

    ORGANIC GROWTH CATALYSTS BEING ADVANCED 2024 Q1 2025 Q2 2025 Q3 2025 Q4 2025 Gramalote Project  Antelope Deposit  Goose Project  Fekola Underground  Fekola Regional Preliminary Economic Preliminary Economic First Gold Pour Initial Production Initial Production Assessment Assessment Gramalote Pro

  38. Slide 38: Appendix

    APPENDIX

  39. Slide 39: Executive Team Experience

    EXECUTIVE TEAM EXPERIENCE Majority of executive team working together over 25 years with Bema Gold / B2Gold Clive T. Johnson Mike Cinnamond William Lytle Randall Chatwin Victor King Dennis Stansbury President & CEO SVP, Finance & CFO SVP & COO SVP, Legal & Corporate SVP, Exploration SVP, Engineering

  40. Slide 40: Board of Directors

    BOARD OF DIRECTORS Kelvin Dushnisky Clive T. Johnson Greg Barnes Kevin Bullock Liane Kelly Jerry Korpan Chair of the Board President & CEO Director Director Director Director Thabile Makgala Basie Maree Mary-Lynn Oke Lisa Pankratz Robin Weisman Director Director Director Director Director 40

  41. Slide 41: Environmental, Social and Governance

    ENVIRONMENTAL, SOCIAL AND GOVERNANCE Raising the Bar – Our Approach RESPONSIBLE RESPECTFUL AND CLIMATE RISK LOCAL ENVIRONMENTAL PRACTICES SAFE WORKPLACES MANAGEMENT COMMUNITIES Highlighted text Implementation of PROGRESSIVE 96.8% national employment1,3 Target to reduce Scope 1 and 2 Invested approxi

  42. Slide 42: Our People

    OUR PEOPLE 2025 WORKFORCE as of June 30, 2025 6,546 97% 54.5% employees globally national employment senior management (Q1: 6,564) (Q1: 96.8%)1,3 roles filled by national employees (Q1: 49%) 2,3 EQUITY, DIVERSITY AND INCLUSION as of June 30, 2025 13.3% 25% of workforce of senior positions identify a

  43. Slide 43: Employment Spotlight

    EMPLOYMENT SPOTLIGHT Inuit Employment, Training, and Community Initiatives Second Quarter 2025 Employment and Community Statistics > 204 Inuit worked at the Goose Project completing 96,948 hours of work > ~$6.5 million in value committed to Kitikmeot Qualified Business Registry firms in Q2 2025 Kiti

  44. Slide 44: Local Communities

    LOCAL COMMUNITIES MALI Investment into better access to health care, education and water supply for local villages; Ongoing livelihood initiatives such as smallholder farms and poultry and fish farming projects Strengthening communities through the Goungouboto Agricultural Project, a socio-economic

  45. Slide 45: Local Communities

    LOCAL COMMUNITIES PHILIPPINES Community investment initiatives focused on education, access to health services & facilities, enterprise development, livelihood development and vocational training In 2024, generated over 600 local jobs through various training and employment initiatives: Building loc

  46. Slide 46: Biodiversity Conservation

    BIODIVERSITY CONSERVATION Achieving No Net Loss of Critical Habitat FEKOLA MASBATE OTJIKOTO GOOSE COMPLEX GOLD PROJECT MINE PROJECT Extensive study of West Over 3,800 reef balls with 15,000-hectare Otjikoto B2Gold Nunavut has African chimpanzee 66,500 coral fragments Nature Reserve is home to implem

  47. Slide 47: Climate Risk Management

    CLIMATE RISK MANAGEMENT Target to reduce Scope 1 and 2 GHG emissions by 30% by 20301 FEKOLA MINE MASATE GOLD PROJECT OTJIKOTO MINE GOOSE PROJECT In 2024, expanded the solar Rooftop solar panel project: In Power purchase agreement The proposed Back River plant by 22 MW 2024, we installed eight with a

  48. Slide 48: The Back River Project Energy Centre

    THE BACK RIVER PROJECT ENERGY CENTRE The Back River Project Energy Wind Generation System 13 4.5 MW ~55 MW Centre is a clean energy facility WIND TURBINE GENERATORS POWER CAPACITY EACH ELECTRICITY with the potential to OFFSET UP TO 50% OF PROJECT Electrical transmission lines will be laid directly o

  49. Slide 49: Potential to Harness Renewable Energy

    POTENTIAL TO HARNESS RENEWABLE ENERGY Opportunity to utilize wind energy to reduce diesel dependence and lower carbon emissions DIAVIK (RIO TINTO) RAGLAN (GLENCORE) HOPE BAY (AGNICO) Diamond mine with operating wind farm Glencore signed a 20-year power purchase Agnico signed a memorandum of in Yello

  50. Slide 50: Experienced Operators in the Arctic

    EXPERIENCED OPERATORS IN THE ARCTIC B2Gold technical team advanced Kupol from exploration to construction while at Bema Gold Bema announces Releases Kupol Kinross to acquire Bema Kinross announces agreement to acquire Preliminary Economic (Bema team to complete first production interest in Kupol pro

  51. Slide 51: Fekola Regional – Mamba Zone

    FEKOLA REGIONAL – Mamba Zone1 Mamba Long Section: West-Facing MSD_241 8.6 g/t Au over 46.0m; BND_149 12.0 g/t Grade / width combinations and a well-defined Au over 16.2m; and MSD_184 13.1 g/t Au over 9.2m: geometry reinforce the consideration of an excellent examples of high-grade sulphide shoot, wi

  52. Slide 52: Fekola Pit

    FEKOLA PIT Fekola Pit Long Section: West-Facing Potential Underground Development 52

  53. Slide 53: Contact Details

    CONTACT DETAILS B2Gold Corp. Suite 3400 CLIVE JOHNSON 666 Burrard Street President, CEO & Director Vancouver, BC +1 604 681 8371 Canada, V6C 2X8 RANDALL CHATWIN Tel: +1 604 681 8371 SVP, Legal & Corporate Communications Fax: +1 604 681 6209 +1 604 681 8371 Email: investor@b2gold.com MICHAEL MCDONALD

B2Gold — Investor Presentation (August 2025) on 6ix