Oroco Resources Corp. · TSXV:OCO
Oroco Resources — Oroco Resource — Investor Presentation (June 2023)
17 slides from Oroco Resources's investor presentation, June 2023
Slide 1: Oroco Resource Corp. - An Emerging North American Copper Giant
Oroco Resource Corp. An Emerging North American Copper Giant Corporate Presentation June 2023 TSX-V: OCO Frankfurt: OR6 US: ORRCF
Slide 2: Forward Looking Statements
FORWARD LOOKING STATEMENTS This presentation contains certain forward-looking statements that reflect the current views and/or expectations of Oroco Resource Corp. (“Oroco”) with respect to its business and future events including statements regarding Oroco’s business and exploration plans. Forward-
Slide 3: Oroco Resource Corp.
Oroco Resource Corp. Oroco Resource Corp. (TSX-V:OCO, US:ORRCF), founded in 2006, is a Canadian mineral exploration company led by a management team with • Craig Dalziel – Executive Chairman significant experience in exploration, discovery, development, operations, and divestitures in the mineral se
Slide 4: Investment Highlights
INVESTMENT HIGHLIGHTS ➢ Initial NI 43-101 compliant Sulphide Mineral Resource Estimate (May 2023): Indicated Resources of 487.3 million tonnes (“Mt”) of 0.36% CuEq and Inferred Resources of 599.9 Mt of 0.36% CuEq - 3,864 Mlbs CuEq Indicated and 4,697 Mlbs CuEq Inferred ➢ Significant potential to exp
Slide 5: Goldman Sachs Commodities Research: Copper is the new oil
Goldman Sachs Commodities Research: Copper is the new oil ➢ No decarbonization without copper ➢ The green transition will support a surge in copper demand ➢ The copper market is unprepared for this critical role ➢ Sticky supply threatens to deplete copper stocks by 2025 ➢ Copper on a necessary path
Slide 6: Social License to Operate - Established ESG Strategy – Juntos Somos Mas
Social License to Operate - Established ESG Strategy – Juntos Somos Mas The Santo Tomas project is located within a region with a rich mining history and numerous current mining operations. We enjoy strong community support, and we are in turn committed to promoting the best interests of that commun
Slide 7: Santo Tomas Project: District scale mineral title tenure
Santo Tomas Project: Comprehensive mineral title, plant & tailings footprint District scale mineral title tenure accommodated on ~9000 ha (35 sq mile) land package
Slide 8: NI 43-101 Compliant Mineral Resource Estimate (May 2023)
NI 43-101 Compliant Mineral Resource Estimate (May 2023) 3,864 Mlbs CuEq Indicated and 4,697 Mlbs CuEq Inferred Notes: 1. Mineral resources are not mineral reserves and do not have demonstrated economic viability. 2. The Mineral Resources are reported at an in-situ cut-off grade of 0.15% Cu. Notes,
Slide 9: NI 43-101 Compliant Mineral Resource Estimate (May 2023)
NI 43-101 Compliant Mineral Resource Estimate (May 2023) 3. All figures are rounded to reflect the relative accuracy of the estimates. Totals in Table 1 may not sum or recalculate from related values in the table due to rounding of values in the table, reflecting fewer significant digits than were c
Slide 10: Structural Advantage from Highly developed local infrastructure in the La Entrada al Pacífico
Structural Advantage from Highly developed local infrastructure in the La Entrada al Pacífico Capital Expenditure (CAPEX) and Operating Expenses (OPEX) advantages will accrue from Santo Tomas’ favourable location ➢ Located at low elevation in the "La Entrada al Pacífico” corridor, a federal Mexican-
Slide 11: North-South striking ridge: 70% of Mineral Resource is above the valley bottom
North-South striking ridge: 70% of Mineral Resource is above the valley bottom with very positive implications for the strip ratio and energy related mining and costs.
Slide 12: Extensive Phase One Exploration Program Completed Q1 2023
Extensive Phase One Exploration Program Completed Q1 2023 ➢ Phase One Exploration Program: 14 sq km 3D-IP and c.48,500m in c.76 holes of drilling completed as of Q1 2023 ➢ Targeted previously defined higher grade zones to confirm and expand upon Historical resource estimates ➢ Mineralization remains
Slide 13: Technical Work Program: 2020 to 2023. c.CAD$50 million invested
Technical Work Program: 2020 to 2023. c.CAD$50 million invested: Geophysics, Drilling, MRE and PEA ➢ 14 km2 of deep, 3D, Induced Polarization ("DCIP") geophysical survey by Dias Geophysical ➢ Completed c.76 drill holes/c.48,500m of drilling with 5000m of strike length tested by Q1 2023 ➢ Environment
Slide 14: Technical Work Program to 2023: Mineral Resource Estimate and Preliminary Economic Assessment
Technical Work Program to 2023: Mineral Resource Estimate and Preliminary Economic Assessment Study Deliverable Consultant Location Scope PEA Technical Report co-ordination; ensure comprehensive qualified person ("QP") signoffs as defined by PEA Co-ordination & PEA Ausenco Tucson National Instrument
Slide 15: Technical Work Program: Timeline to Pre-Feasibility Study and Beyond
Technical Work Program: Timeline to Pre-Feasibility Study and Beyond 2023 Activity < Q1 Q2 Q3 Q4 North Zone (NZ) Definition Drilling Resource North Zone (NZ) Resource Drilling Possible resource expansion/definition drilling South Zone (SZ) Definition Drilling South Zone (SZ) Resource Drilling Possib
Slide 16: Copper Market Risks Improving ?
Copper Market Risks Improving ?
Slide 17: Oroco Resource Corp.
Oroco Resource Corp. An Emerging North American Copper Giant Corporate Presentation June 2023 TSX-V: OCO Frankfurt: OR6 US: ORRCF