  1. Slide 1: Berrima Colliery - Closure Working Group Meeting #9

    DRAFT for CWG Pre-meeting Review – Not for external distribution outside of CWG Berrima Colliery - Closure Working Group Meeting #9 >Welcome Online/Boral Cement Procurement Training Room 23 March 2021

  2. Slide 2: Agenda

    DRAFT for CWG Pre-meeting Review – Not for external distribution outside of CWG Agenda 1. Welcome and Apologies - Introductions 2. Terms of Reference - Conduct of CWG Members 3. Review of minutes & actions 4. Water Quality Results update - Greg Johnson 5. Water treatment update- Greg Johnson/David S

  3. Slide 3: Welcome - CWG Representatives, Apologies & Guests

    DRAFT for CWG Pre-meeting Review – Not for external distribution outside of CWG 1. Welcome - CWG Representatives, Apologies & Guests ● Boral - Girish Yadwad, Greg Johnson, David Spears, Jenny Smilie (apology) ● Resource Regulator - Greg Kininmonth, Peter McMillan ● Environment Protection Authority -

  4. Slide 4: Terms of Reference - Code of Conduct of CWG Members

    DRAFT for CWG Pre-meeting Review – Not for external distribution outside of CWG 2. Terms of Reference - Code of Conduct of CWG Members Titlefefefefeffff4g45g4545

  5. Slide 5: Review of Minutes – suggested amendments

    DRAFT for CWG Pre-meeting Review – Not for external distribution outside of CWG 3. Review of Minutes – suggested amendments Titlefefefefeffff4g45g4545

  6. Slide 6: Review of Minutes – actions

    DRAFT for CWG Pre-meeting Review – Not for external distribution outside of CWG 3. Review of Minutes – actions Summary of Meeting Actions: 1. Amend river graphs to include the adit discharge results between the 100 m up and 300 m down sample results. – see water quality update. 2. Make available the

  7. Slide 7: Review of Minutes – actions – Seam Contours

    DRAFT for CWG Pre-meeting Review – Not for external distribution outside of CWG 3. Review of Minutes – actions – Seam Contours Titlefefefefeffff4g45g4545

  8. Slide 8: Surface Water Monitoring Update

    DRAFT for CWG Pre-meeting Review – Not for external distribution outside of CWG 4. Surface Water Monitoring Update Titlefefefefeffff4g45g4545

  9. Slide 9: Water Quality Guidelines

    DRAFT for CWG Pre-meeting Review – Not for external distribution outside of CWG Water Quality Guidelines In order to interpret and give context to the water quality monitoring results from the Colliery we are now including details, where applicable, against the Australian Water Quality Guidelines fo

  10. Slide 10: Adit discharge update

    DRAFT for CWG Pre-meeting Review – Not for external distribution outside of CWG Adit discharge update Volume discharged – 1.8-1.9 ML per day, down on long term average of 2.6 ML pH – at the low end of range EC – trending towards 1000us/cm Titlefefefefeffff4g45g4545

  11. Slide 11: Adit discharge update

    DRAFT for CWG Pre-meeting Review – Not for external distribution outside of CWG Adit discharge update Iron – remains low, below laboratory detection levels. Manganese – slight trend up, Titlefefefefeffff4g45g4545 within historical mining release levels

  12. Slide 12: Adit discharge update

    DRAFT for CWG Pre-meeting Review – Not for external distribution outside of CWG Adit discharge update Nickel –still trending up, above historical levels. Titlefefefefeffff4g45g4545 Zinc – still trending up, above historical mining discharge levels Commentary – pH, while within range, has trended dow

  13. Slide 13: River Quality Update

    DRAFT for CWG Pre-meeting Review – Not for external distribution outside of CWG River Quality Update Titlefefefefeffff4g45g4545

  14. Slide 14: River Quality Update

    DRAFT for CWG Pre-meeting Review – Not for external distribution outside of CWG River Quality Update (note: River monitoring has reverted back to licence points every 2 months) pH – Mine discharges are not altering river pH. Titlefefefefeffff4g45g4545 EC – Mine discharges are influencing river elect

  15. Slide 15: River Quality Update - Cont.

    DRAFT for CWG Pre-meeting Review – Not for external distribution outside of CWG DRAFT for CWG Pre-meeting Review – Not for external distribution outside of CWG River Quality Update - Cont. Iron – levels managed in discharge, other factors impacting iron in waters. Titlefefefefeffff4g45g4545 Manganes

  16. Slide 16: River Quality Update - Cont.

    DRAFT for CWG Pre-meeting Review – Not for external distribution outside of CWG River Quality Update - Cont. Nickel – Mine discharges appear to be influencing levels within the mixing zone. Returning to WQ guidelines (95% protection) within the mixing zone. River water meeting drinking water guideli

  17. Slide 17: River Quality Update - Cont.

    DRAFT for CWG Pre-meeting Review – Not for external distribution outside of CWG River Quality Update - Cont. Sulphate – The mine appears to be influencing sulphate levels immediately downstream, however there are also other natural sources downstream influencing. Titlefefefefeffff4g45g4545 Commentar

  18. Slide 18: Underground Water Treatment Update

    DRAFT for CWG Pre-meeting Review – Not for external distribution outside of CWG 5. Underground Water Treatment Update • As noted last meeting the pH of mine waters has been trending down • Testing of waters underground has indicated that the pH behind the lower bulkheads has deteriorated, with the l

  19. Slide 19: Bulkhead Water level update

    DRAFT for CWG Pre-meeting Review – Not for external distribution outside of CWG 5.1 Bulkhead Water level update Discharge constant at 1.6-1.75ML/day January 2021 to March 2021

  20. Slide 20: Stage MOP Status

    DRAFT for CWG Pre-meeting Review – Not for external distribution outside of CWG 6. Stage 2 MOP Status ● The Stage 1 Closure MOP covers the period ending 31 December 2020 or until such time as the Stage 2 Closure MOP is approved. ● Stage 2 Closure MOP submitted in November 2020 which was to cover the

  21. Slide 21: Proposed Long Term Pit Top Treatment Solution Update

    DRAFT for CWG Pre-meeting Review – Not for external distribution outside of CWG 7. Proposed Long Term Pit Top Treatment Solution Update The proposed pit top treatment solution will require appropriate development approvals. Boral will seek approval through the Department of Planning Industry and the

  22. Slide 22: Long Term Pit Top Treatment Proposed Location

    DRAFT for CWG Pre-meeting Review – Not for external distribution outside of CWG 7. Long Term Pit Top Treatment Proposed Location Titlefefefefeffff4g45g4545

  23. Slide 23: Environmental Protection Licence/ CCL 748 Updates

    DRAFT for CWG Pre-meeting Review – Not for external distribution outside of CWG 8. Environmental Protection Licence/ CCL 748 Updates EPL 608 No updates. CCL 748 2020 AEMR submitted to Resources Regulator late Feb 2021 Stage 2 Closure MOP submission requires updated hydrological study, Stage 2 MOP ex

  24. Slide 24: Mandemar Lane Update - Bore Locations

    DRAFT for CWG Pre-meeting Review – Not for external distribution outside of CWG 9. Mandemar Lane Update - Bore Locations Titlefefefefeffff4g45g4545

  25. Slide 25: Mandemar Lane Groundwater Monitoring - Update

    DRAFT for CWG Pre-meeting Review – Not for external distribution outside of CWG 9. Mandemar Lane Groundwater Monitoring - Update ● Belbin Bore (below mine workings) – Belbin bore indicates that the overall groundwater level has declined slightly since September 2020. However, the bore has been pumpi

  26. Slide 26: Mandemar Lane Groundwater Monitoring - Update

    DRAFT for CWG Pre-meeting Review – Not for external distribution outside of CWG 9. Mandemar Lane Groundwater Monitoring - Update ● B63 Vibration monitor – 3 sensors. 85m upper Hawkesbury sandstone, 133m lower Hawkesbury sandstone, 177m zone above coal seam. ➢ Deepest sensor at 177m indicates the str

  27. Slide 27: Communications Update

    DRAFT for CWG Pre-meeting Review – Not for external distribution outside of CWG 10. Communications Update •Objective: Continue the flow of information with regard to the closure plan updates and activity, and provide forums for the community to easily raise and discuss questions with Boral. •Deliver

  28. Slide 28: Other business

    DRAFT for CWG Pre-meeting Review – Not for external distribution outside of CWG 11. Other business Titlefefefefeffff4g45g4545

  29. Slide 29: Next meeting date

    DRAFT for CWG Pre-meeting Review – Not for external distribution outside of CWG 12. Next meeting date Proposing - mid June 2021 Location – Procurement Building Berrima Cement and Online Titlefefefefeffff4g45g4545 For further information on the Berrima Colliery Closure process please feel fee to visi

  30. Slide 30: DRAFT for CWG Pre-meeting Review – Not for external distribution outside of CWG

    DRAFT for CWG Pre-meeting Review – Not for external distribution outside of CWG