Slide 1: DeGrussa Copper Mine – Broker and Investor Site Visit - 14 November 2013
A Premier Australian Copper Producer DeGrussa Copper Mine – Broker and Investor Site Visit - 14 November 2013 S a n d f I r e R e s o u r c e s - A P r e m I e r A u s t r a l I a n C o p p e r P r o d u c e r
Slide 2: Important Information and Disclaimer
Important Information and Disclaimer Forward-Looking Statements Forward-Looking Statements • This presentation has been prepared by Sandfire Resources NL. This document contains background information about Sandfire Resources NL current at the date of this presentation. The presentation is in summar
Slide 3: Mining
Mining 3 S a n d f I r e R e s o u r c e s - A P r e m I e r A u s t r a l I a n C o p p e r P r o d u c e r
Slide 4: Proposed Underground Development
Proposed Underground Development 2425 – S1 stope C1 Orebody 2250 – C1/C1E production area C4 decline development C4 Orebody 2200 Diamond Drill Drive C5 Orebody 4 S a n d f I r e R e s o u r c e s - A P r e m I e r A u s t r a l I a n C o p p e r P r o d u c e r
Slide 5: Development & Exploration Gathering Momentum
Development & Exploration Gathering Momentum C4/C5 decline marks the beginning of a new chapter for DeGrussa • Development of the C1 and C4/C5 declines well advanced from junction off Evans Decline • Underground drilling underway targeting depth extensions and repeats of C4 and C5 NOTE: Drill-hole l
Slide 6: Current Mining and Stoping Activities
Current Mining and Stoping Activities • Four stopes now on-line with 2 large stopes commenced • Underground mining rate of 1.5Mtpa for October 2013 with 127k tonnes hauled • Paste plant performance stabilised and improving • Progressed development of C1 (264m) and C4/C5 (325m) declines from Evans De
Slide 7: C1 S1 Secondary Stope
C1 S1 Secondary Stope NORTH-WEST VIEW PLAN VIEW ISOMETRIC SECTION Arched backs entire length P2 2425 2425 BACK P1 P1 P2 BACK S1 P2 S1 2400 S1 2400 P1 NORTH 2375 Trough on final rings to minimise 2375 dilution 7 S a n d f I r e R e s o u r c e s - A P r e m I e r A u s t r a l I a n C o p p e r P r o
Slide 8: Current Resource Classification of C1
Current Resource Classification of C1 • Recent underground grade control drilling has brought the majority of the C1 ore body down to the 2200mRL, to a mineable status. • Below the 2200mRL further drilling is required to bring current Indicated resource to Measured (Mineable status). • The only limi
Slide 9: Underground C4 Extensional Drilling Underway
Underground C4 Extensional Drilling Underway Plan View 9 S a n d f I r e R e s o u r c e s - A P r e m I e r A u s t r a l I a n C o p p e r P r o d u c e r
Slide 10: Processing
Processing 10 S a n d f I r e R e s o u r c e s - A P r e m I e r A u s t r a l I a n C o p p e r P r o d u c e r
Slide 11: Processing Flowchart
Processing Flowchart 11 S a n d f I r e R e s o u r c e s - A P r e m I e r A u s t r a l I a n C o p p e r P r o d u c e r
Slide 12: Recovery Improvement Program
Recovery Improvement Program • Sustained recoveries of 85-92% for primary underground ore - consistent operation of underground ore allowing process plant optimisation • Recovery improvement initiatives: • Implementation of advanced process control system in progress - providing improved process pla
Slide 13: Paste Plant
Paste Plant • Typical paste composition • 92% tailings and 8% binder • 75% to 78% solids • Binder composition • 20% lime : 80% slag • 21 day outage spanning Picture of flow chart September and October to • Replace filter carrier belt to improve operational performance and reliability • Upgrade to pa
Slide 14: Exploration
Exploration 14 S a n d f I r e R e s o u r c e s - A P r e m I e r A u s t r a l I a n C o p p e r P r o d u c e r
Slide 15: C4 Extensional Exploration – Progress to Date
C4 Extensional Exploration – Progress to Date The first line of extension exploration Plan View drilling has been completed on western edge of Conductor 4 DGUE0012, DGUE0013 and DGUE0017 intersected significant mineralisation outside of the Conductor 4 wireframe 15 S a n d f I r e R e s o u r c e s
Slide 16: C4 Extensional Exploration Planned Work
C4 Extensional Exploration Planned Work Additional evaluation OBLIQUE VIEW of the western edge of Conductor 4 is currently being PROPOSED 2175 C4 DDD undertaken from the 2200 C4 DDD 2200 C4 Diamond Drill Drive Resource definition drilling of the eastern portion of Conductor 5 is planned from the pro
Slide 17: Research & Development: DeGrussa Seismic Study
Research & Development: DeGrussa Seismic Study PLAN VIEW OBLIQUE PLAN VIEW A high resolution surface 3D seismic survey has been completed over the SEISMIC Conductor 5 orebody. This survey SURVEY AREA detected the position of the CONDUCTOR 5 mineralisation at a low level of confidence. Possible Reaso
Slide 18: Current Exploration Drilling Locations
Current Exploration Drilling Locations Diamond Rig C1 West RC Rig Noonyereena North AC Rig Shed Well 18 S a n d f I r e R e s o u r c e s - A P r e m I e r A u s t r a l I a n C o p p e r P r o d u c e r
Slide 19: Recent Exploration Drilling – Oct to Nov 2013
Recent Exploration Drilling – Oct to Nov 2013 Key Regional Outcomes DeGrussa UG Exploration • Down-plunge extensions to C4 orebody intersected • Drilling continues Cow Hole Bore • Interesting Au intersections • +3km mineralised strike length Red Bore – DeGrussa West • Targeting extensions of the C1
Slide 20: A Premier Australian Copper Producer
A Premier Australian Copper Producer S a n d f I r e R e s o u r c e s - A P r e m I e r A u s t r a l I a n C o p p e r P r o d u c e r
Slide 21: Competent Person’s Statement
Competent Person’s Statement Competent Person’s Statement – Exploration Results • The information in this report that relates to Exploration Results is based on information compiled by Mr. Shannan Bamforth who is a Member of The Australasian Institute of Mining and Metallurgy. Mr. Bamforth is a perm
Slide 22: Exploration Drilling Results
Exploration Drilling Results 22 S a n d f I r e R e s o u r c e s - A P r e m I e r A u s t r a l I a n C o p p e r P r o d u c e r
Slide 23: e r
23 S a n d f I r e R e s o u r c e s - A P r e m I e r A u s t r a l I a n C o p p e r P r o d u c e r
Slide 24: e r
24 S a n d f I r e R e s o u r c e s - A P r e m I e r A u s t r a l I a n C o p p e r P r o d u c e r
Slide 25: e r
25 S a n d f I r e R e s o u r c e s - A P r e m I e r A u s t r a l I a n C o p p e r P r o d u c e r
Slide 26: e r
26 S a n d f I r e R e s o u r c e s - A P r e m I e r A u s t r a l I a n C o p p e r P r o d u c e r
Slide 27: e r
27 S a n d f I r e R e s o u r c e s - A P r e m I e r A u s t r a l I a n C o p p e r P r o d u c e r
Slide 28: A Premier Australian Copper Producer
A Premier Australian Copper Producer S a n d f I r e R e s o u r c e s - A P r e m I e r A u s t r a l I a n C o p p e r P r o d u c e r