Vital Metals Ltd · ASX:VML

Vital Metals — Shareholder Meeting (November 2008)

12 slides from Vital Metals's shareholder meeting presentation, Nov 21, 2008

  1. Slide 1: Managing Director's Presentation Annual General Meeting

    Managing Director’s Presentation Annual General Meeting 21 November 2008

  2. Slide 2: Watershed Overview

    WATERSHED OVERVIEW • Large deposit – open along strike and at depth • In-ground tungsten (WO3) value - >A$2 billion • Measured and Indicated Resource - Stage 1 6 mt @ 0.35% WO3 (0.2% WO3 cut-off) • Smoothed grades in existing resource estimates • Variable mineralisation being addressed • Revised thr

  3. Slide 3: Feasibility Study to Date

    FEASIBILITY STUDY TO DATE • Extensive drilling program completed • 5 bulk samples for metallurgical testwork • 2 kriged resource models estimated • Recovered Fraction Modelling (RFM) underway • Comprehensive metallurgical program completed: 76% WO3 recovery • Environmental Impact Statement (EIS) and

  4. Slide 4: Resource Modelling

    RESOURCE MODELLING • Resource comprises 997 mineralised intercepts: • 304 of intercepts exceed 5m @ 0.5% WO3 • 160 of these exceed 5m @ 1.0% WO3 • Average length of mineralised intercepts is 5.4m • Kriged resource estimates give smoothed grade model unsuitable for selective mining studies • Recovere

  5. Slide 5: Watershed Mineralisation

    WATERSHED MINERALISATION Coarse scheelite mineralisation under ultraviolet (UV) light in drill core Fine to coarse grained (disseminated) scheelite November 08

  6. Slide 6: Watershed Pit Design – Stage 1

    WATERSHED PIT DESIGN – STAGE 1 November 08

  7. Slide 7: Processing Overview

    PROCESSING OVERVIEW • Developed innovative ore sorting pre-concentration • Completion of gravity concentration processing • Flotation testwork program to be completed • 76% metallurgical recovery at 0.35% WO3 head grade for 450,000 tpa • Proposed flow sheet is: • Innovative • Simple • Cost effective

  8. Slide 8: Process Flow Sheet

    PROCESS FLOW SHEET November 08

  9. Slide 9: Project Economics

    PROJECT ECONOMICS • Annual Production: 118,000 mtu in exceptional quality (>65% WO3) concentrates • Current cash costs US$168/mtu • Target costs sub-US$150/mtu • Capital cost A$50 million • Modular plant design allows for upgrading production to 400,000 mtu annually November 08

  10. Slide 10: Conclusion

    CONCLUSION • Large, A$2 billion, in-ground tungsten resource • Simple, cost-effective processing • Metallurgical recovery 76% of contained WO3 • Exceptionally clean concentrate: 1,800 tpa, >65% WO3 • Stage 1: A$50 million Capex, US$168/mtu Opex • New resource model targeting sub-US$150/mtu Opex • Po

  11. Slide 11: Competent Person Statement

    COMPETENT PERSON STATEMENT “The information in this presentation that relates to exploration results, mineral resources or ore reserves is based on information compiled by Mr Bruce Arthur Pertzel, who is a Fellow of the Australasian Institute of Mining and Metallurgy. Mr Pertzel is an employee of Vi

  12. Slide 12: www.vitalmetals.com.au

    www.vitalmetals.com.au November 08