Antipa Minerals Limited · ASX:AZY

Antipa Minerals — Non-Deal Roadshow (August 2017)

18 slides from Antipa Minerals's roadshow presentation, August 2017

  1. Slide 1: Company Update

    ANTIPAMINERALS Company Update August 2017

  2. Slide 2: Large Scale World Class Assets

    Large Scale World Class Assets • Three Large Projects – Citadel, North Telfer and Paterson • +4,400 km2 tenement holding in the underexplored but demonstrated World Class Paterson Province in Western Australia extending to within 3km of Telfer Gold Mine Antipa Minerals – Company Update – August 2017

  3. Slide 3: A Compelling Investment

    A Compelling Investment Large scale world class assets • Highly-prospective and under-explored granted tenure North Telfer near term development opportunity • 100% owned Minyari/WACA deposits • Shallow, high-grade gold-copper with exciting exploration upside • Active drilling and exploration program

  4. Slide 4: Board and Management – 150+ Years Combined Experience

    Board and Management – 150+ Years Combined Experience Stephen Power Roger Mason Mark Rodda Peter Buck Gary Johnson LLB BSc (Hons), MAusIMM BA, LLB MSc, MAusIMM MAusIMM, MTMS, MAICD Executive Chairman Managing Director Non-Executive Director Non-Executive Director Non-Executive Director Lawyer with 3

  5. Slide 5: Corporate Snapshot

    Corporate Snapshot Capital Structure (4 August 2017) Ordinary Shares 1,173.3m 12 Month Share Price Performance (August 2016 – August 2017) Unlisted Options 108.1m 0.06 25000000 Current Share Price A$0.026 Market Capitalisation A$30.5m 0.05 20000000 12 month Share Price Range A$0.015-A$0.049 0.04 150

  6. Slide 6: Unlocking the Paterson Province

    Unlocking the Paterson Province • Demonstrated World Class Province • Preserved and under-explored opportunity • +4,400 km2 dominant tenement holding • Three Large Projects • Citadel • North Telfer • Paterson Antipa Minerals – Company Update - August 2017 6

  7. Slide 7: North Telfer Project – Minyari Dome

    North Telfer Project – Minyari Dome • 100% owned • 1,335km2 tenement package 4.0m @ 6.61 g/t Au, 0.03% Cu • Focus on Minyari Dome • Hosts Minyari and WACA deposits and Judes prospect • Potential for long term high-grade gold-copper • Significant exploration upside • Similar geology to Telfer • Near

  8. Slide 8: North Telfer Project – Minyari Dome 2017 Exploration Programme

    North Telfer Project – Minyari Dome 2017 Exploration Programme1 • Phase 1 • Extended RC drilling programme completed in July (approx. 15,500m) • Phase 2 • Tests existing and new targets across the wider Minyari Dome • Several components already commenced, including heliborne aerial electromagnetic (

  9. Slide 9: North Telfer Project – Minyari Deposit

    North Telfer Project – Minyari Deposit 100650mN Minyari Deposit oxide mineralisation commences from 1 metre below the surface Surface Costean sample results 8.0 tonnes at 3.57 g/t gold 8.0 tonnes at 1.50 g/t gold Antipa Minerals – Company Update – August 2017 9

  10. Slide 10: North Telfer Project – WACA Deposit

    North Telfer Project – WACA Deposit Antipa Minerals – Company Update – August 2017 10

  11. Slide 11: Citadel Project – Rio Tinto Farm-in and Joint Venture

    Citadel Project – Rio Tinto Farm-in and Joint Venture • Rio Tinto $60m Staged Earn-In • Rio to incur $60m total exploration expenditure for up to 75% interest • Note: Rio has the right to withdraw from the earn-in at the end of a programme year. • Calibre Deposit (gold, copper, silver, tungsten) • L

  12. Slide 12: Citadel Project – 2017 Exploration Programme

    Citadel Project – 2017 Exploration Programme1 • Fully funded by Rio Tinto • $2.5m in exploration to be carried out from May to December 2017 • Phase 1 • IP survey at Blue Steel to further define the target • IP survey over the southern region of the 20km Calibre structural corridor to evaluate high

  13. Slide 13: Paterson Project – Substantial Upside

    Paterson Project – Substantial Upside • 100% owned • 1,631 km2 of highly prospective ground • Within 3km of the Telfer Mine • Shallow cover to sub cropping • Limited to no exploration for 20 years • Mostly shallow drilling ± surface geochemistry • Limited to no ground based geophysics (i.e. IP or EM

  14. Slide 14: 2017 Exploration Activities – Indicative Timetable

    2017 Exploration Activities – Indicative Timetable Apr May June July Aug Sept Oct Nov Dec Phase 1 Exploration Programme1 North Telfer Project Phase 2 Exploration Programme1 (Minyari Dome) Scoping Study2 Development Opportunity Phase 1 Exploration Programme1 Citadel Project (Rio Tinto Farm-in) Phase

  15. Slide 15: Unlocking the Paterson Province

    Unlocking the Paterson Province • Large scale world class assets • Experienced Board and Management • Potential near term share price catalysts • Realisable objective to become a near term producer Antipa Minerals – Company Update – August 2017 15

  16. Slide 16: Disclaimer

    Disclaimer Nature of this document: The purpose of this presentation is to provide general information about Antipa Minerals Limited (the ‘Company’). Unless otherwise stated herein, the information in this presentation is based on the Company’s own information and estimates. In attending this presen

  17. Slide 17: NOTES

    NOTES Competent Persons Statement – Exploration Results The information in this report that relates to the Exploration Results is extracted from the following: Reports entitled various relating to Citadel Project and North Telfer Project created between 7 September 2011 and 20 January 2017, includin

  18. Slide 18: NOTES

    NOTES All of which are available to view on www.antipaminerals.com.au and www.asx.com.au. The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcements. The Company confirms that the form and context in

Antipa Minerals — Non-Deal Roadshow (August 2017) on 6ix