Antipa Minerals Limited · ASX:AZY
Antipa Minerals — Non-Deal Roadshow (August 2017)
18 slides from Antipa Minerals's roadshow presentation, August 2017
Slide 1: Company Update
ANTIPAMINERALS Company Update August 2017
Slide 2: Large Scale World Class Assets
Large Scale World Class Assets • Three Large Projects – Citadel, North Telfer and Paterson • +4,400 km2 tenement holding in the underexplored but demonstrated World Class Paterson Province in Western Australia extending to within 3km of Telfer Gold Mine Antipa Minerals – Company Update – August 2017
Slide 3: A Compelling Investment
A Compelling Investment Large scale world class assets • Highly-prospective and under-explored granted tenure North Telfer near term development opportunity • 100% owned Minyari/WACA deposits • Shallow, high-grade gold-copper with exciting exploration upside • Active drilling and exploration program
Slide 4: Board and Management – 150+ Years Combined Experience
Board and Management – 150+ Years Combined Experience Stephen Power Roger Mason Mark Rodda Peter Buck Gary Johnson LLB BSc (Hons), MAusIMM BA, LLB MSc, MAusIMM MAusIMM, MTMS, MAICD Executive Chairman Managing Director Non-Executive Director Non-Executive Director Non-Executive Director Lawyer with 3
Slide 5: Corporate Snapshot
Corporate Snapshot Capital Structure (4 August 2017) Ordinary Shares 1,173.3m 12 Month Share Price Performance (August 2016 – August 2017) Unlisted Options 108.1m 0.06 25000000 Current Share Price A$0.026 Market Capitalisation A$30.5m 0.05 20000000 12 month Share Price Range A$0.015-A$0.049 0.04 150
Slide 6: Unlocking the Paterson Province
Unlocking the Paterson Province • Demonstrated World Class Province • Preserved and under-explored opportunity • +4,400 km2 dominant tenement holding • Three Large Projects • Citadel • North Telfer • Paterson Antipa Minerals – Company Update - August 2017 6
Slide 7: North Telfer Project – Minyari Dome
North Telfer Project – Minyari Dome • 100% owned • 1,335km2 tenement package 4.0m @ 6.61 g/t Au, 0.03% Cu • Focus on Minyari Dome • Hosts Minyari and WACA deposits and Judes prospect • Potential for long term high-grade gold-copper • Significant exploration upside • Similar geology to Telfer • Near
Slide 8: North Telfer Project – Minyari Dome 2017 Exploration Programme
North Telfer Project – Minyari Dome 2017 Exploration Programme1 • Phase 1 • Extended RC drilling programme completed in July (approx. 15,500m) • Phase 2 • Tests existing and new targets across the wider Minyari Dome • Several components already commenced, including heliborne aerial electromagnetic (
Slide 9: North Telfer Project – Minyari Deposit
North Telfer Project – Minyari Deposit 100650mN Minyari Deposit oxide mineralisation commences from 1 metre below the surface Surface Costean sample results 8.0 tonnes at 3.57 g/t gold 8.0 tonnes at 1.50 g/t gold Antipa Minerals – Company Update – August 2017 9
Slide 10: North Telfer Project – WACA Deposit
North Telfer Project – WACA Deposit Antipa Minerals – Company Update – August 2017 10
Slide 11: Citadel Project – Rio Tinto Farm-in and Joint Venture
Citadel Project – Rio Tinto Farm-in and Joint Venture • Rio Tinto $60m Staged Earn-In • Rio to incur $60m total exploration expenditure for up to 75% interest • Note: Rio has the right to withdraw from the earn-in at the end of a programme year. • Calibre Deposit (gold, copper, silver, tungsten) • L
Slide 12: Citadel Project – 2017 Exploration Programme
Citadel Project – 2017 Exploration Programme1 • Fully funded by Rio Tinto • $2.5m in exploration to be carried out from May to December 2017 • Phase 1 • IP survey at Blue Steel to further define the target • IP survey over the southern region of the 20km Calibre structural corridor to evaluate high
Slide 13: Paterson Project – Substantial Upside
Paterson Project – Substantial Upside • 100% owned • 1,631 km2 of highly prospective ground • Within 3km of the Telfer Mine • Shallow cover to sub cropping • Limited to no exploration for 20 years • Mostly shallow drilling ± surface geochemistry • Limited to no ground based geophysics (i.e. IP or EM
Slide 14: 2017 Exploration Activities – Indicative Timetable
2017 Exploration Activities – Indicative Timetable Apr May June July Aug Sept Oct Nov Dec Phase 1 Exploration Programme1 North Telfer Project Phase 2 Exploration Programme1 (Minyari Dome) Scoping Study2 Development Opportunity Phase 1 Exploration Programme1 Citadel Project (Rio Tinto Farm-in) Phase
Slide 15: Unlocking the Paterson Province
Unlocking the Paterson Province • Large scale world class assets • Experienced Board and Management • Potential near term share price catalysts • Realisable objective to become a near term producer Antipa Minerals – Company Update – August 2017 15
Slide 16: Disclaimer
Disclaimer Nature of this document: The purpose of this presentation is to provide general information about Antipa Minerals Limited (the ‘Company’). Unless otherwise stated herein, the information in this presentation is based on the Company’s own information and estimates. In attending this presen
Slide 17: NOTES
NOTES Competent Persons Statement – Exploration Results The information in this report that relates to the Exploration Results is extracted from the following: Reports entitled various relating to Citadel Project and North Telfer Project created between 7 September 2011 and 20 January 2017, includin
Slide 18: NOTES
NOTES All of which are available to view on www.antipaminerals.com.au and www.asx.com.au. The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcements. The Company confirms that the form and context in