Vital Metals Ltd · ASX:VML

Vital Metals — RIU Explorers Conference 2008

24 slides from Vital Metals's conference presentation, Feb 13, 2008

  1. Slide 1: Presentation - RIU Explorers Conference

    13 February 2008 For personal use only Manager Announcements Company Announcements Office Australian Stock Exchange Limited Level 4, 20 Bridge Street Sydney NSW 2000 By ASX Online Dear Sir/Madam Presentation - Vital Metals Ltd – RIU Explorers Conference Please find attached the presentation to be gi

  2. Slide 2: For personal use only

    For personal use only

  3. Slide 3: Corporate

    Corporate For personal use only • Listed in Nov 2005 • Issued capital • 106m shares • 5.8m listed options expiring Aug ’08 at $0.80 • 8.0m unlisted options • Major Shareholders Consolidated Minerals Ltd 14.2m - 13.4% Stan Macdonald 8.5m - 8.0% Breamlea Pty Ltd 5.9m - 5.6% Rytech Pty Ltd 5.6m - 5.3%

  4. Slide 4: Directors

    Directors For personal use only • William (Bill) Ryan Chairman • Andrew (Andy) Haslam - MD/CEO Mining Engineer • D R (Ross) Kennedy Geologist • Colin Hunter Metallurgist • Andrew Simpson Metals Marketing February 08

  5. Slide 5: Vital Metals Project Location

    Vital Metals Project Location For personal use only February 08

  6. Slide 6: Tungsten Prices 2004-2007

    Tungsten Prices 2004-2007 For personal use only Tungsten (APT) Price Chart $US/MTU $300.00 $250.00 $200.00 $150.00 $100.00 $50.00 $0.00 February 08

  7. Slide 7: Future – Tungsten Price

    Future – Tungsten Price For personal use only Summary from GBRM Ltd Tungsten report: • Continued strong global tungsten consumption. • China - curtailed mining. - imposed export quotas. - now significant importer of concentrates & scrap. • No new mine production has been realised. • Forecast for APT

  8. Slide 8: Site

    Watershed Site For personal use only February 08

  9. Slide 9: Location Map

    Watershed – Location Map For personal use only February 08

  10. Slide 10: Development Plans

    Watershed – Development Plans For personal use only • Development study based on output of 4,000 tpa of contained WO3 in concentrates (6% of world market). • Value of production at US$200/mtu circa A$100m pa. • Located 100km from regional centre (Mareeba). • Open cut mine - excellent logistics. • On

  11. Slide 11: Project - Resource

    Watershed Project - Resource For personal use only • Initial resource estimate (Indicated/Inferred) - June ’07 - 21.8mt at 0.26% WO3 for 56,000t contained WO3 • Subsequently drilled 129 holes for 16,650 metres • Resource still expanding; now 1600m long and open to north, south, at depth • Resource u

  12. Slide 12: Drill Targets

    Watershed – Drill Targets For personal use only • Drilling (May – Dec ‘07) prior to 2007 wet season. • Northern & Southern extension explored. • Close-spaced (10m x 10m) drilling completed in three blocks. • Challenging terrain. • New resource April 2008. February 08

  13. Slide 13: Model – E/W Cross Section

    Watershed Model – E/W Cross Section For personal use only February 08

  14. Slide 14: Bulk Sampling

    Watershed – Bulk Sampling For personal use only February 08

  15. Slide 15: Project - Metallurgy

    Watershed Project - Metallurgy For personal use only • Large scale pilot plant trials in progress. • Metallurgical route - ore sorting + gravity recovery and flotation. • Ore sorting shows high recovery (+ 90%) with rejection of 50% of ROM tonnes. • Gravity tests show spirals/tables as optimal equip

  16. Slide 16: Project - Environmental

    Watershed Project - Environmental For personal use only • EIS lodged with Queensland EPA (Jan 08) . • EIS approval will determine timing of start-up – estimated clearance late 2008. • Native Title negotiations well advanced as ILUA. February 08

  17. Slide 17: Infrastructure

    Watershed Infrastructure For personal use only • Current access track will upgrade to all-weather road – design complete. • Grid power at 132kV available on Highway (23km) – design / cost underway. • Accommodation village will be 3km north of mine – design in progress. • Personnel will drive in/out

  18. Slide 18: View South

    Watershed – View South For personal use only February 08

  19. Slide 19: Timing

    Watershed Timing For personal use only • New marketing report (Jan ’08) available on web site. • Preliminary Mining study complete - May 2008. • Metallurgical Flow Sheet – April 2008. • Infrastructure costs (camp, road, power) – June 2008. • Feasibility Study complete – August 2008. • EIS Clearance

  20. Slide 20: View East

    Watershed – View East For personal use only February 08

  21. Slide 21: Mt Mulgine – WA (VML earning 70%)

    Mt Mulgine – WA (VML earning 70%) For personal use only • Vital earning 70% from GBG for spending $0.75m by Oct 2008. • Currently spent ~ $0.75m. • Extensive, low-grade tungsten and molybdenum mineralisation. • May be stand-alone Mo mine. • Warrants new look. February 08

  22. Slide 22: Mt Mulgine - WA

    Mt Mulgine - WA For personal use only • Extensively drilled by multiple explorers (1965/85). • Very large target. • Resources (non-JORC Compliant). • Hill deposit: 5.09mt @ 0.24% WO3. • Trench deposit: 84mt @ 0.14% WO3, 0.045% Mo from surface – open to SW, NE and at depth. • Vital seeking extensions

  23. Slide 23: Vital Summary

    Vital Summary For personal use only Corporate Currently $7.5 million in bank. Watershed • New resource due. • Complete ore sorting/metallurgy test work. • Meet with international buyers. • Finalise feasibility – August 2008. Mt Mulgine • Results of current drill program. February 08

  24. Slide 24: For personal use only

    For personal use only www.vitalmetals.com.au February 08

Vital Metals — RIU Explorers Conference 2008 on 6ix