Yancoal Australia Ltd. · ASX:YAL

Yancoal Australia — Corporate Update (July 2017)

11 slides from Yancoal Australia's corporate update, Jul 27, 2017

  1. Slide 1: Community Consultative Committee

    Community Consultative Committee 27 July 2017

  2. Slide 2: Action List

    Action List ITEM RESPONSIBILITY PROGRESS UPDATE Clarify the discrepancy between the CCC guidelines and PB Refer to handout requirements of Ashton’s Development Consent with respect to sitting fees for CCC members (PB). CCC Presentation to include environmental activities update, PB Updated in July 2

  3. Slide 3: Ashton Mine Production CY2017

    Ashton Mine Production CY2017 Ashton Coal Key Statistics 2017 Budget 2017 Actual (as at 30 June) ROM (t) 1,310,593 1,007,355 Product Coal (t) 660,540 399,574 Total Coal Sales (t) 746,147 608,803 Lost Time Injury (LTIFR) 18.1 23.8 Total Recordable 19.7 28.88 Injuries (TRIFR) Total Employees (FTE) 202

  4. Slide 4: Current Mining Area

    Current Mining Area 4 26 July 2017 4

  5. Slide 5: Environment Monitoring Data

    b. Environment Monitoring Data • Refer to attachment to Agenda 5 26 July 2017 5

  6. Slide 6: Complaints

    Complaints One Complaint on 24/06/17 at 8:24 am regarding ‘whining and machinery noise’. • A review of ACOL operations indicated there was minimal site operations occurring at the time as there was a long wall move on. • Asked the complainant to call at the time of the noise issue next time to allow

  7. Slide 7: Environmental Update

    Environmental Update Community  Six monthly meeting of the Ashton Coal Project Aboriginal Community Consultation Forum held. Government  DRE environmental officers undertook annual site inspection following submission of the Annual Environmental Management Report. No major issues identified.  Att

  8. Slide 8: Environment update

    Environment update Monitoring  Flora monitoring of Bowmans Creek banks undertaken.  Archaeology survey of proposed gas pipeline undertaken.  Monthly noise monitoring undertaken. No issues identified.  Autumn macroinvertebrate sampling of Bowman creek diversions undertaken.  Ground disturbance p

  9. Slide 9: NEOC Flora

    NEOC Flora  The rehabilitation of the NEOC spoil emplacement is proceeding satisfactorily, and data shows that the majority of the monitoring criteria has been achieved.  Generally the Pasture – NEOC areas have suitable vegetation coverage on the majority of the emplacement. The south‐facing slope

  10. Slide 10: Camberwell update

    Camberwell update  Camberwell property • 33 homes tenanted, 1 vacant to be tenanted • 4 homes vacant • Tenders are being called for demolition and removal of four houses. 10 26 July 2017 10

  11. Slide 11: Any Questions?

    Any Questions? 11 26 July 2017 11