Slide 1: Focusing on Delivery
Focusing on Delivery Investor Presentation January 9, 2013
Slide 2: Forward-looking statements
Certain of the statements made in this Presentation may contain forward-looking statements within the meaning of the United States Private Securities Litigation Reform Act of 1995 and forward-looking information within the meaning of applicable Canadian securities law. These forward-looking statemen
Slide 3: Gold producer with 20 years of international operating experience
> 650,000 oz gold producer with 20 years of international operating experience Leading low cost operator with solid margins and a strong balance sheet Experienced management team with a proven ability to build and operate mines Track record of value creation through successful exploration, d
Slide 4: 2013 guidance
Gold production of 705,000–760,000 oz Cash operating costs of $515–$530/oz; estimated total cash costs of ~$585/oz Capital expenditure of $648m ($410 operations; $238 projects) Exploration budget increased by 22% to $98.5m Cash and cash equivalents of ~$810m at year end 2012** Dividend o
Slide 5: Operations in highly prospective areas with well-established mining cultures
Operations in highly prospective areas with well-established mining cultures Asset base is diversified across the mining lifecycle Pipeline of assets drives organic growth www.eldoradogold.com 5
Slide 6: By 2016, we aim to
By 2016, we aim to: Produce over 1.5m ounces of gold (2012: ~660,000oz) Have cash operating costs of $300-350/oz net of by-product (2012: $489/oz) Maintain balance sheet strength Distribute an attractive dividend to shareholders Gold Bars from White Mountain Mine, China www.eldoradogold.co
Slide 7: Estimated Gold Production 2012-2016
Estimated Gold Production 2012-2016 We’re seeing: 1,650,000 1,800 1,500,000 1,600 Strong production 1,350,000 growth (Average 1,400 1,200,000 Annual Growth Rate: 1,200 27%) with decreasing Gold Production (oz) 1,050,000 cash costs 900,000 1,000 US$/oz 750,000 800 Over 1.5 million oz of 600,000
Slide 8: Gold Production and Cash Costs – Guidance vs Actual
Gold Production – Guidance vs Actual 800 700 600 Oz (thousands) Over the past 5 years we have: 500 400 300 Doubled Production 200 100 0 Increased Reserves & Resources 2008 2009 2010 2011 2012 Guidance Actual Cash Costs – Guidance vs Actual Maintained costs in the lowest 600 quartile 500 400
Slide 9: Expansion, construction and development projects
These four projects account for 60% of Eldorado’s future production growth Kişladağ Olympias Skouries Perama Hill (Expansion) (Expansion) (Construction) (Development) www.eldoradogold.com 9
Slide 10: Kisladag expansion highlights
EXPANSION Highlights Current production rate 12.5 million tonnes / year (crushing, screening, stacking) Expanded production rate 25.0 million tonnes / year (crushing, screening, stacking) Expanded production rate, average 475,000 ounces / year LOM strip ratio 1.4:1 ROM ore treatment , average 8MT /
Slide 11: Kisladag expansion: engineering, procurement, construction
EXPANSION Leach Pad, Kişladağ Engineering Detailed engineering design initiated Procurement Continue procurement of major mining and process equipment Major fabrication initiated Construction Construction of Phase VI leach pad extension Installation of North Pad conveying system Initiate
Slide 12: Development Potential
Development Potential Projects within a 10km radius Fully-permitted Excellent infrastructure (roads, power, port access) Experienced & growing local teams Phased construction approach Strong government support Reserves source: European Goldfields www.eldoradogold.com 12
Slide 13: Olympias project highlights
EXPANSION Deposit Type Replacement mixed sulphide Mine Life 25 years Initial Capex ~US $165 million to Phase II UG Production Mining Rate Phase I (2012 - 2015) –Tailings 2013: 815 ktpa Phase II (2016 - 2017) – Underground: 400 ktpa Phase III (2018 - On) – Underground Expansion: 800 ktpa Gold Product
Slide 14: Olympias work in 2012 and 2013
EXPANSION Work in 2012 Plant refurbishment a. complete Schist Production from tailings Amphibolite Gneiss commenced in Q4 Marble Refurbishment of existing Intrusive mine ramp complete Underground tunnels refurbished using rock- bolting and shotcreting c. d. Work in 2013 Advance und
Slide 15: Skouries project highlights
CONSTRUCTION Deposit Type Gold-Copper Porphyry Mine Life 27 years Initial Capex ~US $340 million to plant production from Open Pit Schist Mining Rate 8 Mtpa Open Pit Amphibolite Gneiss 4.4 Mtpa Underground Marble Strip Ratio 0.7 : 1 Intrusive Gold ~140,000 oz Au, ~30,000 t Cu/year Open Pit Productio
Slide 16: Skouries work in 2012 and 2013
CONSTRUCTION Work in 2012 Site preparation – surface clearing Schist activities and earth moving Amphibolite Gneiss Marble Road access Intrusive Portal excavation Work in 2013 Continue construction of Processing Plant Advance underground development Test geological potential of near
Slide 17: Perama Hill project highlights
DEVELOPMENT Disseminated epithermal gold-silver Deposit Type vein deposit Mine Life 8 years Initial Capex ~US $220 million Mining Rate 1.25 Mtpa Open Pit Strip Ratio 0.35 : 1 Gold Production 110,000 oz/year Silver Production 85,000 oz/year Cash Costs $288/oz (by-product) Processing Conventional CIL
Slide 18: Perama Hill work in 2012 and 2013
DEVELOPMENT Drilling at Perama Hill Work in 2012 PEIA approved in February 2012 EIA submitted to Ministry of Environment (MoE) in March 2012 under Fast Track Legislation Work in 2013 EIA approval anticipated in Q1 2013 www.eldoradogold.com 18
Slide 19: Exploration projects
Piavitsa Certej Tanjianshan Efemcukuru (Greenfield) (Brownfield) (Near Mine) (Near Mine) www.eldoradogold.com 19
Slide 20: Exploration Potential
Exploration Potential Strategic land position Metallogenic belt with multiple deposit styles within 10km radius Untested targets provide excellent upside potential Reserves source: European Goldfields www.eldoradogold.com 20
Slide 21: Greenfield exploration: Piavitsa
EXPLORATION - GREENFIELD Excellent upside potential (not in resources) 2012 program tested target horizon on 100m x 200m spaced grid Historical drilling identified massive sulphide zones along Stratoni Fault www.eldoradogold.com 21
Slide 22: Brownfield exploration: Certej
EXPLORATION - BROWNFIELD Over 1.5 million oz added to M&I resource base in 2012 2012 drill holes in Link Zone target cut high- grade gold mineralization West Pit target has high-grade epithermal veins Limited modern exploration in Romania but extensive historical exploration and mining data
Slide 23: Near mine exploration: Tanjianshan
EXPLORATION – NEAR MINE Drilling programs at Qinglongtan North and Xijingou completed in Q3 2012 Qinglongtan North (QN) Xijingou Several holes at QN intersected strong Several step-out drillholes at mineralization Xijingou intersected strong mineralization Possibility of a new high-grade gol
Slide 24: Near mine exploration: Efemcukuru
EXPLORATION – NEAR MINE Q3 2012 drilling focused on Kestani Beleni North West Ore Shoot (NWOS), South Ore Shoot (SOS) and Kokarpinar veins 32 drillholes (8,440 metres) were completed and results include: At NWOS: new shallowly northwest-plunging lower zone of mineralization (traced for ~400m a
Slide 25: Exploration – Near Mine
EXPLORATION – NEAR MINE www.eldoradogold.com 25
Slide 26: Thank You
Thank You TSX: ELD NYSE: EGO Total shares outstanding (as at Dec 31, 2012): 714.3 M Investor Relations: Nancy Woo (604) 601-6650 ⋅ nancyw@eldoradogold.com www.eldoradogold.com 26
Slide 27: Background Information
Background Information www.eldoradogold.com 27
Slide 28: Five cornerstone gold mines
Five cornerstone gold mines: Kişladağ Efemçukuru Jinfeng Tanjianshan White Mountain www.eldoradogold.com 28
Slide 29: Kisladag production overview
PRODUCTION OVERVIEW Location Uşak Province, Western Turkey Deposit Gold porphyry Ownership 100% Eldorado Open pit Type Heap leach gold mine Expected Life of Mine 15-20 years Recovery 65% Strip Ratio 2013 1.75:1 Overview RESERVES AND RESOURCES (at Dec 31, 2011) Largest gold mine in Turkey Discove
Slide 30: Efemcukuru production overview
PRODUCTION OVERVIEW Location Izmir Province, Western Turkey Deposit High grade epithermal gold vein Ownership 100% Eldorado Underground gold mine Type Flotation and Carbon in Leach Expected Life of Mine 12 years Recovery 87% RESERVES AND RESOURCES (at Dec 31, 2011) Overview Proven + Probable Reserve
Slide 31: Jinfeng production overview
PRODUCTION OVERVIEW Location Guizhou Province, China Deposit Carlin type 82% Eldorado Ownership 18% Guizhou Lannigou Gold Mine Ltd Open pit and underground gold mine Type Biox and Carbon in Leach Expected Life of Mine 13 years Recovery 85% RESERVES AND RESOURCES (at Dec 31, 2011) Overview Acquired
Slide 32: Tanjianshan production overview
PRODUCTION OVERVIEW Location Qinghai Province, China Deposit Orogenic 90% Eldorado 5% First Institute of Geology and Ownership Mineral Exploration of Qinghai Province 5% Dachaidan Gold Mine Open pit gold mine Type Float roast Carbon in Leach Expected Life of Mine 5 years Recovery 81% Overview Strip
Slide 33: White Mountain production overview
PRODUCTION OVERVIEW Location Jilin Province, China Deposit Orogenic 95% Eldorado Ownership 5% Jilin Tonghua Institute of Geology and Minerals Exploration and Development Underground gold mine Type Carbon in Leach plant Expected Life of Mine 9 years Recovery 80% Overview Acquired by Eldorado from S
Slide 34: Olympias production overview
PRODUCTION OVERVIEW Location Chalkidiki Peninsula, Northern Greece Deposit Polymetallic gold, silver, lead and zinc 95% Eldorado Ownership 5% Aktor SA Underground mine Type (previously mined using underground drift and fill) Estimated Development Capital US$165 million Production (from tailings) Q4
Slide 35: Vila Nova production overview
PRODUCTION OVERVIEW Location Amapa State, Brazil Ownership 100% Eldorado Type Open pit iron ore mine Expected Life of Mine 9 years RESERVES AND RESOURCES (at Dec 31, 2011) Overview Commercial production began in 2011 Proven + Probable Reserves 8.9 Mt @ 60.9% Fe 2013 Guidance Measured + Indicated R
Slide 36: Stratoni production overview
PRODUCTION OVERVIEW Location Chalkidiki Peninsula, Northern Greece Deposit Replacement mixed sulphide 95% Eldorado Ownership 5% Aktor SA Underground drift and fill Type Multi-stage flotation Expected Life of Mine 5 years RESERVES AND RESOURCES (Source: European Goldfields) 10 Moz Ag @ 177 g/t Proven
Slide 37: Five key development projects
Five key development projects: Skouries Perama Hill Certej Tocantinzinho Eastern Dragon www.eldoradogold.com 37
Slide 38: Skouries construction overview
CONSTRUCTION OVERVIEW Chalkidiki Peninsula, Location Northern Greece Deposit Gold-copper porphyry 95% Eldorado Ownership 5% Aktor SA Type Open pit and underground Strip Ratio (open pit) 0.7:1 Estimated Development Capital US$340 million Overview Production Expected 2015 Acquired from European Gold
Slide 39: Perama Hill development overview
DEVELOPMENT OVERVIEW Eastern Thrace, northern Location Greece Epithermal gold-silver vein Deposit deposit Ownership 100% Eldorado Type Open pit gold mine Expected Life of Mine 8 years 90% (Gold) Expected Recovery 60% (Silver) Estimated Development Capital US$220 million Production Expected Q1 2015 S
Slide 40: Certej development overview
DEVELOPMENT OVERVIEW “Golden Quadrilateral” area Location of the Apuseni Mountains, Western Romania Epithermal gold-silver Deposit deposit Ownership 80% Eldorado Open pit Type (Previously mined via shallow open pit) Expected Life of Mine 12 years Estimated Development Capital US$270 million Overview
Slide 41: Tocantinzinho development overview
DEVELOPMENT OVERVIEW Tapajos district, Para State, Location central Brazil Shallow, intrusion-hosted, Deposit non-refractory gold deposit Ownership 100% Eldorado Type Open pit gold mine Expected Life of Mine 11 years RESERVES AND RESOURCES (at Dec 31, 2011) Proven + Probable Reserves 1.9 Moz Au @ 1.
Slide 42: Eastern Dragon development overview
DEVELOPMENT OVERVIEW Location Heilongjiang Province, China Deposit High-grade, epithermal, gold-silver vein 95% Eldorado Ownership 5% County (Daxinglanling Yihua Development Company Ltd) Open pit and underground gold mine, Type CIL plant under construction Expected Life of Mine 7 years Expected Reco
Slide 43: 2013 Exploration budget: US$98.5 million
2013 Exploration budget: US$98.5 million Romania ($12m) 5 projects 34,000 meters Vancouver (Head Office) ($3.5m) Greece ($23m) 6 projects 47,000 meters Turkey ($12m) China ($22m) 4 projects 9 projects 25,000 meters 59,000 meters Brazil ($16m) 4 projects 16,000 meters Other Proj
Slide 44: Proven & Probable, Measured & Indicated, Inferred resources
Proven & Probable Measured & Indicated Inferred Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces (x1000) (Au g/t) (x1000) (x1000) (Au g/t) (x1000) (x1000) (Au g/t) (x1000) Kisladag 459,870 0.71 10,516 579,860 0.65 12,055 380,760 0.40 4,921 Efemcukuru 5,023 9.13 1,475 5,426 9.57 1,670 2,52
Slide 45: Investor Relations contact
TSX: ELD NYSE: EGO Total shares outstanding (as at Dec 31, 2012): 714.3 M Investor Relations: Nancy Woo (604) 601-6650 ⋅ nancyw@eldoradogold.com www.eldoradogold.com 45