Australian Mines Limited · ASX:AUZ
Australian Mines — Shareholder Meeting (November 2004)
26 slides from Australian Mines's shareholder meeting presentation, November 2004

Slide 1: Managing Director's AGM Presentation
Australian Mines Limited MANAGING DIRECTOR’S AGM PRESENTATION November 2004

Slide 2: Executive Summary
Executive Summary AUZ ¾ 2004 – The Year in Review ¾ Blair Nickel Mine ¾ Exploration ¾ Looking Forward …..Emerging Resources Company

Slide 3: 2004 - Corporate
2004 - Corporate AUZ ¾ Board approves Blair Project commencement ¾ Exercise of listed options raises $4.1 million ¾ Repaid $1.95 million in project loans ¾ Cashes $1.0 million hedge gain ¾ Re-hedges nickel at > $20,000 per tonne Ni

Slide 4: 2004 – Operations
2004 – Operations AUZ ¾ Commenced mining at Blair ¾ First ore from Blair ¾ Completed mine dewatering ¾ Completed mine rehabilitation ¾ Completed reserve drilling program ¾ Commenced decline in the deeps

Slide 5: 2004 - Exploration
2004 - Exploration AUZ ¾ Delineation of Area 57 orebody ¾ Undertook first pass target generation programs ¾ Data compilation ¾ Regional RAB ¾ Detailed aeromagnetics ¾ Surface EM

Slide 6: Blair Nickel Mine
Blair Nickel Mine BLAIR a Australian Mines 100%J x ee \

Slide 7: Blair – Reserves & Resources
Blair – Reserves & Resources AUZ Tonnes grade Nickel tonnes t Ni % Ni t Resources 160,600 3.1 4,950 Reserves 93,500 2.6 2,410

Slide 8: Blair – Production Profile
Blair – Production Profile AUZ Targeted monthly performance ¾ Production 5,000 to 10,000 tonnes ¾ Contained Nickel of 150 tonnes to 250 tonnes ¾ Current cash costs of A$3.66 /lb nickel ¾ Increase developed inventory ¾ Target project cash of $500k per month

Slide 9: Blair – Deeps 01 & 03 Surfaces
Blair – Deeps 01& 03 Surfaces AUZ Planned Stopes Planned Decline 03 Surface 01 Surface

Slide 10: Blair – Unmined Shoots
Blair — Unmined Shoots 28 Level 500 29 Level 469 a ——_ Existing Decline aa Shaft Se BSHOOT es LEGEND oN Remnant ore Fill ™m N Void [_] Mined out y Proposed diamond drill holes =i) Reserves Proposed drill hole with DHEM Resources Previous drill intercept ‘C’ Shoot Blair Nickel Mine - “C” Shoot 01 Ore

Slide 11: Blair – Unmined Shoots
Blair — Unmined Shoots ! 6579100 mN 6579000 mN [EG] Remnant ore oy Fi [_] void real : .__., Decline © Previous drill intercept AMUG061 e) Recent drill intercept c P| 3 ; AMUGO60 \ @) AMUG057 \ 714 Level J \ | " 1@ 3.18% Ni | \ “By \ i i Shoot \ ~~ >>, 700 Level \ \ \ | | | \ \

Slide 12: Blair – Exploration …… the next mine
Blair – Exploration AUZ ¾ Maximise the use of our data ¾ Nickel target prioritisation & drilling ¾ Gold target prioritisation & drilling ¾ Other opportunities outside tenements …… the next mine

Slide 13: Blair Regional - Nickel
Blair Regional ~ Nickel f BLAIR PROJECT Nickel Resource Targets 6585000 mN 4m @ 2.55% Ni from 78m 1m @ 5.1% Ni 4m @ 2.5% Ni of prospective contact beneath soil cover 4m @ 1.86% Ni from 224m 1.8m @ 2.32% Ni from 170.6m 0.3m @ 2.4% Ni from 177.3m | 4m @ 1.54% Ni from 30m : 6m @ 1.58% Ni from 44m LEGEN

Slide 14: Anomaly 11
Anomaly 11 AUZ AMRC014 10m @ 1.04% Ni from 80m AMRC017 5m @ 0.65% Ni from 113m AMRC015 11m @ 1.18% Ni from 44m AMRC018 1m @ 0.49% Ni from 100m AMRC016 9m @ 0.88% Ni from 60m AMRC019 9m @ 0.58% Ni from 92m

Slide 15: Anomaly 11 – Long Section
— 300m RL f— 200m RL LEGEND + 15%m Ni ) 10-15%m Ni (0 7-10%m Ni tome. LL] 5-7%m Ni AMRC015 EE ———EE————— 11m @ 1.18% Ni incl 3m @ 2.33% Ni AMRC014 10m @ 1.04% Ni incl 3m @ 1.46% Ni Sept 2004 RC Drilling by Australian Mines Ltd (AMRCO014 - 019) Other holes drilled by previous explorers Drill Section

Slide 16: Anomaly 11 – Cross Section
Anomaly 11 – Cross Section AUZ

Slide 17: Blair Regional - Nickel
Blair Regional - Nickel AUZ Blair Mine and Conceptual targets Blair West BLAIR MINE 03 Surface Blair East Blair Mine 01 Surface N 10 Contact Aeromagnetic Image Interpretation

Slide 18: Blair Regional - Gold
Blair Regional ~ Gold 10 mE a7 380000 mE BLAIR PROJECT 2m @ 6.88 g/t Au from 47m Gold Resource Targets 7m @ 2.81 g/t Au from surface GOLDEN RIDGE MINE 8m @ 4.29 g/t Au from 55m (Gold) 17m @ 2.82 g/t Au from 63m (EOH) 5m @ 3.93 g/t Au from 72m 4m @ 8.33 g/t Au from 31m (incl. 2m @ 14 g/t Au) Up to 11

Slide 19: Footer – Long section
18 Footer — Long section 3m @ 2.91g/t Au 7m @ 2.81g/t Au 6m @ 2.72g/t Au 4m @ 1.25g/t Au 3m @ 1.48g/t Au 4m @ 2.29g/t Au é Depth of 350m RL : : : 2m @ 1.75git Au | "eaterng ; 4m @ 2.7g/t Au Curent Limit of Diling 3m @ 4.86g/t Au Se OS a Anne aN ° Base of Oxidalion PLUNGE LEGEND s+ 10 gimAu +5 gimAu

Slide 20: Footer – Cross Section
18 Footer — Cross Section AMRCO026 5m @ 3.01 g/t Au incl 1m @9.9 gitAu 7 4m @ 4.12 git Au incl 1m @ 5.32 git Au incl 1m @ 6.56 g/t Au RL Base of oxidation ~ Sediment I 280mRL 0

Slide 21: Blair Exploration
Blair Exploration AUZ ¾ Good potential for further Gold and Nickel mineralisation ¾ Further investigation to targets under cover ¾ Considerable advantage with over 20 years of previous exploration ¾ Large volume of exploration data that can be integrated ¾ Utilising improved technology and explorati

Slide 22: 2005 - Corporate
2005 - Corporate AUZ ¾ Continue cash build ¾ Maximise Revenue ¾ Effective cost control ¾ Opportunistic cost protection in nickel hedge ¾ Evaluate opportunities ¾ Exploration ¾ Acquisition

Slide 23: 2005 - Operations
2005 - Operations AUZ ¾ Owner Mining ¾ Flexibility ¾ Productivity ¾ Stabilise costs ¾ Continue mine life ¾ Below 460m RL ¾ B & L-Shoot ¾ Repeats of Area 57

Slide 24: 2005 - Exploration
2005 - Exploration AUZ ¾ Low key, efficient & structured exploration effort ¾ Continue with targeted programs ¾ Data compilation ¾ Regional RAB ¾ Prospect RC ¾ Surface EM

Slide 25: Australian Mines Limited ……Gaining Momentum
Australian Mines Limited AUZ ……Gaining Momentum as ¾ Cashflow Strengthens ¾ Growth through exploration ¾ Opportunistic acquisitions ……and Continue to Grow

Slide 26: Australian Mines Limited
Australian Mines Limited MANAGING DIRECTOR’S AGM PRESENTATION November 2004
Source: Internet Archive copy of australianmines.com.au
More decks from Australian Mines Limited
Investor Presentation (October 2026)28 slides · Oct 14, 2026
Investor Presentation (July 2026)26 slides · July 2026
Investor Presentation (April 2026)12 slides · April 2026
Investor Presentation (September 2025)19 slides · Sep 18, 2025
Investor Presentation (July 2025)16 slides · Jul 4, 2025
Investor Presentation (November 2022)27 slides · Nov 22, 2022