Liberty Gold Corp · TSX:LGD

Liberty Gold — Investor Presentation (April 2026)

24 slides from Liberty Gold's investor presentation, Apr 27, 2026

  1. Slide 1: Disciplined Development of Great Basin Oxide Gold

    Disciplined Development of Great Basin Oxide Gold TSX LGD OTCQX LGDTF April 2026

  2. Slide 2: Cautionary Notes & Technical Disclosures

    Cautionary Notes & Technical Disclosures All statements in this presentation, other than statements of historical fact, are "forward-looking information" and “forward-looking statementsˮ with respect to Liberty as actual results, and future events could differ materially from those anticipated in su

  3. Slide 3: Company Highlights

    Company Highlights OUR FOCUS A Large-scale, Buildable Gold Asset Black Pine Gold Project • 4.9M oz indicated gold resource1, supporting long-life South Eastern Idaho production potential Past-producing, open-pit, large-scale, heap leach • Strong economics and a straightforward operating profile oxid

  4. Slide 4: Our Leadership Team: Built To Build Mines

    Our Leadership Team: Built To Build Mines Board of Directors Management Greg Etter Jon Gilligan Joanna Bailey Brad Ralph BOARD CHAIR PRESIDENT & CHIEF EXECUTIVE OFFICER CFO & CORPORATE SECRETARY SENIOR VP CORPORATE DEVELOPMENT Wendy Louie Lisa Wade Pete Shabestari Tyler Cole DIRECTOR DIRECTOR VP EXP

  5. Slide 5: Capital Structure & Ownership

    Capital Structure & Ownership Capital Structure Ownership Shares Outstanding 527.3 M Institutions and Funds 41.7% Options 16.5 M Centerra Gold Inc. 9.9% Warrants 37.6 M Exercise price C$0.45, expire May 17, 2026 12.5 M Management, Insiders & Advisors 4.0% Exercise price C$0.45, expire April 22, 2027

  6. Slide 6: Corporate Catalysts

    Corporate Catalysts Black Pine, Idaho 2026  Feasibility and Advancement • Updated Mineral Resource Estimate completed • Ongoing drilling and metallurgical programs supporting Feasibility inputs • Feasibility Study targeted Q4 2026 20262028  Permitting • FAST41 Covered Project designation • Coord

  7. Slide 7: Black Pine Gold Project

    Black Pine Gold Project Large-Scale Oxide Heap-Leach Project with Defined Path to Development Simple, Low-Risk Strong Economics & Jurisdiction & Permitting Project Design Development Profile Advantages Open-pit, run-of-mine Low capital intensity and Located in Idaho with heap-leach operation operati

  8. Slide 8: 2024 Preliminary Feasibility Study

    Black Pine Gold Project 2024 Preliminary Feasibility Study Large-scale, low capital intensity, open-pit, run-of-mine heap leach project 1 183K oz $1,208 Years 1  5 Years 1  5 17 yrs 2.2M oz 135K oz $1,381 LOM Average LOM Average MINE LIFE LOM GOLD PRODUCTION ANNUAL PRODUCTION AISC 3.3 yrs 32% $550

  9. Slide 9: Permitting Progress

    Black Pine Gold Project Permitting Progress Federal | FAST41 Coordinated Review • FAST41 Covered Project, led by the U.S. Forest Service • Permitting schedule published on the Permitting Council Dashboard • Notice of Intent NOI) published; NEPA Environmental Impact Statement EIS) process initiat

  10. Slide 10: Permitting Progress

    Black Pine Gold Project Permitting Progress Engineering, permitting, and community workstreams advancing in parallel Engineering & Project Execution Federal Permitting FAST41 & NEPA State Permitting Aligned with FAST41 Stakeholder Affairs & Community Relations Note: Timeline is indicative and is s

  11. Slide 11: Plan of Operations – 2024 PFS Site Layout

    Black Pine Gold Project Plan of Operations – 2024 PFS Site Layout L I B ER T YG O L D . CA T SX L G D O T CQ X L G D T F 11

  12. Slide 12: 2026 Mineral Resource Estimate

    Black Pine Gold Project 2026 Mineral Resource Estimate At a 0.1 g/t Au cut-off, Mineral Resources include1: • Indicated: 540.6 Mt at 0.30 g/t Au 4.88 Moz) • Inferred: 157.1 Mt at 0.21 g/t Au 1.05 Moz) Higher-grade subset 0.5 g/t Au cut-off) within the 0.1 g/t Au cut-off Resource pit contains: • I

  13. Slide 13: Feasibility Study targeted Q4 2026

    Black Pine Gold Project Feasibility Study targeted Q4 2026 Drilling and Resource Advancement • 40,000 metre drill program completed in 2025 • Feasibility Resource Estimate updated • Drilling commencing mid-April for further Feasibility enhancement Metallurgy and Technical Validation • Large-diameter

  14. Slide 14: Corporate Catalysts

    Corporate Catalysts Defined path to Feasibility in 2026 and Record of Decision January 2028 2026 Feasibility Execution Permitting Milestones Path to Development Decision Updated Mineral Resource Notice of Intent published, Engineering and capital Estimate supporting EIS underway cost refinement adva

  15. Slide 15: Appendix

    = Va LIBERTY W SY SOLD

  16. Slide 16: 2024 PFS Gold Production & Cost Profile

    Black Pine Gold Project 2024 PFS Gold Production & Cost Profile Simple Operation with Strong early years production profile with a long mine life Low Unit Operating Costs1 • Targeted : 500 koz addition in Indicated Resource • Open pit, run-of-mine heap leach operation.  Delivered: 719 koz of new In

  17. Slide 17: Mineral Resource Estimate Distribution & Sensitivities

    Black Pine Gold Project Mineral Resource Estimate Distribution & Sensitivities Tonnes Average Grade Gold Ounces % Tonnes % Indicated Tonnes Average Grade Gold Ounces Waste:Ind+Inf Zone Classification Block cut-off grade Classification (Mt) (g/t Au) (000) (oz) (Ind & Inf) MRE Oz (Mt) (g/t Au) (koz) T

  18. Slide 18: 2024 PFS to 2026 Feasibility Resource Progression

    Black Pine Gold Project 2024 PFS to 2026 Feasibility Resource Progression 2024 PFS RESERV E 2026 FEASIBILITY RESERV E 3.11 Moz Gold Probable Mineral Reserves @ $1,650/oz Au1 2024 PFS RESOURCE 2026 FEASIBILITY RESOURCE 4.16 4.88 Indicated Indicated Mineral Resources @ $2,000/oz Au, Mineral Resources

  19. Slide 19: Mineral Resource Growth

    Black Pine Gold Project Mineral Resource Growth Note: The information presented in this map and table is derived from publicly available sources, including Liberty Gold press releases and related public disclosure, as follows: July 13, 2021; February 7, 2023; October 10, 2024 and Preliminary Feasibi

  20. Slide 20: Discovery Zone Mineral Resource Cross-Section

    Black Pine Gold Project Discovery Zone Mineral Resource Cross-Section • 2,109,000 Indicated oxide gold ounces • Highest weighted avg gold grade • 43% of the Indicated Resource • High leverage to gold price drives expected rapid payback L I B ER T YG O L D . CA T SX L G D O T CQ X L G D T F 20

  21. Slide 21: Rangefront Zone Mineral Resource Cross-Section

    Black Pine Gold Project Rangefront Zone Mineral Resource Cross-Section • 2,016,000 Indicated oxide gold ounces • Highest average gold recoveries • 41% of the Indicated Resource • Close proximity to leach pad • Low expected waste:mineralization ratio L I B ER T YG O L D . CA T SX L G D O T CQ X L G

  22. Slide 22: Metallurgy

    Black Pine Gold Project Metallurgy Advanced Metallurgical Model at PFS Cross-section through Geo-metallurgical Domain Block Model • 6 phases of test work completed on bulk samples and large-diameter drill core composites 174 column tests completed) • Rapid gold extraction with 80% of leachable gol

  23. Slide 23: Endnotes

    Endnotes Black Pine Mineral Reserve Estimate • The Mineral Reserve estimate was prepared by AGP Mining Consultants Inc., Toronto, Canada (“AGPˮ) and has an effective date of June 1, 2024. The Qualified Person responsible as defined under NI 43101 for the Mineral Reserve estimate is Todd Carstensen

  24. Slide 24: Corporate Inquiries

    Corporate Inquiries 604.632.4677 info@libertygold.ca TSXLGD | OTCQXLGDTF 610 815 West Hastings Street Vancouver, BC V6C 1B4 libertygold.ca

Liberty Gold — Investor Presentation (April 2026) on 6ix