37 slides from Uranium Energy's investor presentation, April 2020
Slide 1: Corporate Presentation – April 2020
Corporate Presentation – April 2020
Slide 2: Disclaimer
Disclaimer Statements contained in this presentation which are not historical facts are measured mineral resources, indicated mineral resources and inferred forward-looking statements that involve risks, uncertainties and other factors mineral resources, while recognized and required by Canadian reg
Slide 3: Licensed Low-Cost U.S. ISR Projects
Licensed Low-Cost U.S. ISR Projects Operational Infrastructure – Ready to Ramp Up Production Profile 4M lbs./yr Aggressively Expanded Project Portfolio Through Acquisitions During the Downturn Largest U.S. Resource Base of Fully Permitted ISR projects in Texas and Wyoming
Slide 4: Reactor Demand Significantly Exceeds Primary Production
Reactor Demand Significantly Exceeds Primary Production Spot Prices Below Production Costs and Hedges Falling Off 2020 Demand Expected = 182M lbs. 2020 Production Expected = 142M lbs., 12M lbs./mo 2020 + 2021 Primary Production is 85M lbs. Below Requirements Cumulative Gap is 510M lbs. by 2030 60% o
Slide 5: Uranium Spot Price Up ~25% Year-to-Date
Uranium Spot Price Up ~25% Year-to-Date $32.25/lb.; Highest Since March 2016 Daily Broker Average Price Spot Daily Long Term Spot U3O8 US$/lb $160 $138/lb $140 $120 $70/lb US $/lb U308 2011: $100 2005: Fukushima Major Mine Event Disruptions $80 (Cigar Lake, McArthur River) $60 $40 $32.25 Financial $
Slide 6: $1.5 Billion in U.S. Uranium Reserve in Trump's FY2021 Budget
$1.5 Billion in U.S. Uranium Reserve in Trump’s FY2021 Budget U.S. Is The World’s Largest Consumer of Uranium Secretary of State Mike Pompeo recently said: "We need to fundamentally review our supply chains and make sure that we know those supply chains and have control over them for moments just li
Slide 7: Diversified Asset Portfolio
Diversified Asset Portfolio Low-Cost ISR & Production Ready Canada - Athabasca Basin Resources (Mlbs) 58 Mlbs Measured & Indicated Project Name Stage M&I Inferred Diabase (E) NA NA 45 Mlbs Inferred U3O8 Paraguay ISR Uranium Portfolio Resources (Mlbs) Project Name Stage M&I Inferred Yuty (D) 8.9 2.2
Slide 8: U.S. Project Portfolio
U.S. Project Portfolio Infrastructure, Resources and Permits Uranium Stage: Hobson Processing Plant Production Capacity of 2 Mlbs/year Texas Hub & Spoke ISR Portfolio Vanadium (E) Exploration (D) In Development (NT) Near Term Production WY CO AZ NM TX U.S. Conventional Portfolio Wyoming Reno Creek I
Slide 9: Our Team
Our Team Amir Adnani Spencer Abraham Scott Melbye President, CEO, Director Chairman, Board of Directors Executive Vice President An entrepreneur, founding CEO of UEC, Served as a U.S. Senator from 1995 to 2001, as 35 years of experience in senior roles with founder and Chairman of GoldMining Inc., S
Slide 10: UEC At a Glance
UEC At a Glance Member of the Russell 3000® Index Cash(1) $10.3 M Securities(2) 14 M shares of URC with market value of $12.2 M 183.9 M 7.7 M 10 M 202.6 M Share Structure Outstanding Warrants + Options(3) Fully Diluted $0.82 1,211,574 Recent Activity As of April 17, 2020 Avg. Daily Vol. (3-mo) Marke
Slide 11: Hub & Spoke Production Strategy
Hub & Spoke Production Strategy South Texas 11
Slide 12: Hobson is fully licensed and permitted
Hobson is fully licensed and permitted. The Processing Plant has a 2Mlbs / year physical capacity 12
Slide 13: Palangana ISR Mine
Palangana ISR Mine First Producing Mine Proof of Concept $10M 6 months construction Initial CAPEX timeline • Low cash-cost of $21.77/lb during operation Production • Fully permitted including Ready expanded mine permit • Received 10-year renewal permits in 2019 Similar Costs • The major permits for
Slide 14: Palangana Production Area (PA-1)
Palangana Production Area 1 (PA-1) In-Situ Recovery (ISR) Technology Low Cost & Environmentally Friendly Palangana Ion Exchange Facility 14
Slide 15: Resin Hauling Truck And Trailer
Resin Hauling Truck And Trailer 15
Slide 16: Burke Hollow ISR Project
Burke Hollow ISR Project Growth Ahead ▪ Discovery of six trends since 2012 ▪ 7.09Mlbs in 4.06Mt grading 0.088% U3O8 ▪ Leach amenability testing indicates recovery greater than 90% ▪ ~20,000 acres located ~50 miles from Hobson Processing Plant. ▪ 50% of the property unexplored South Texas *See news r
Slide 17: Burke Hollow Advancing Towards Uranium Extraction
Burke Hollow 2019 Drilling Discovers Advancing Towards Additional Mineralization in Production Area 1 Uranium Extraction ✓ 72 monitor wells installed The following final permits have been issued: ✓ Enlarged the Production Area 1 ✓ Mine Production Area (PA-1) zone ✓ Two Class I disposal wells ✓ Aquif
Slide 18: Reno Creek ISR Project
Reno Creek ISR Project The largest permitted, pre-construction ISR uranium project in the U.S. Strategic Location within the Heart of the Powder River Basin, Wyoming Received a modified Permit to Construct in 2019, allowing the construction of the Central Processing Plant (CPP) and ISR wellfields 18
Slide 19: Reno Creek ISR Project Pre-Feasibility Study Underway
M & I Resource 26Mlbs Reno Creek ISR Project of U3O8 grading 0.041% Pre-Feasibility Study within 32Mt* Underway Inferred Resource 1.49Mlbs of U3O8 grading 0.039% within 1.92Mt* First time since 1980 that the major mineralized trends have been consolidated Considerable ISR exploration and expansion p
Slide 20: Reno Creek: Project Timeline
Reno Creek: Project Timeline Aug 2017: Sept. 2016: UEC Closes July 2013: Updated June 2012: Acquisition May 2018: Repurchase of resource Exploration of the Fully UEC 5% Gross July 2015: to current June 2011: success Licensed Completes the Production Permit to 22Mlbs 350-hole resource discovers new R
Slide 21: Anderson Project - Arizona
Anderson Project - Arizona NI 43-101 compliant resource*: A Large U.S. ▪ Indicated Resource: 29.5Mt, 17Mlbs avg. grade of 0.029% Resource ▪ Inferred Resource: 14.3Mt, 12Mlbs with avg. grade of 0.046% 9,852 Acres Project located ~75 miles northwest of Phoenix, AZ Between 1955-1958 with ~$40M spent by
Slide 22: Slick Rock Project - Colorado
Slick Rock Project - Colorado NI 43-101 Compliant Resource*: Technical ▪ Inferred Resource: 2.5Mt, 11.6Mlbs avg. grade of 0.228% Report ▪ Inferred Resource: 2.5Mt, 69.6Mlbs vanadium with avg. grade of 1.37% Low ▪ $21M initial CAPEX with an annual production CAPEX of 438,000 pounds U3O8 + vanadium in
Slide 23: ISR District Opportunity in Paraguay
ISR District Opportunity in Paraguay Similar geology as South Texas and leveraging ~$50M of historic exploration work by Anschutz and Cameco, including new work completed by UEC. Project Historic Operator Stage Resource (M lbs) Yuty Cue Resources / Exploration / 8.9Mlbs in 7.8Mt grading 0.052% Camec
Slide 24: Alto Paraná Titanium Project
Alto Paraná Titanium Project Project Overview ▪ One of the highest-grade and largest-known Cut-Off % % % Ilmenite Tonnes Thickness Ferro-Titanium deposits in the world % TiO2 Fe2O3 calc Billions (m) ▪ NI 43-101 compliant resource with a mineral 6.0 7.41 23.58 13.95 4.94 6.61 exploration claim of 70,
Slide 25: Titanium Feedstock Market – TiO2 prices hitting 3-year highs
Titanium Feedstock Market – TiO2 prices hitting 3-year highs Price of TiO2 Feedstock - ilmenite (USD per tonne) $200 ▪ 90% of TiO2 feedstocks (ilmenite) used UEC signed for pigment manufacturing $175 option to acquire ▪ Strong price recovery for ilmenite since $150 Alto Paraná 2017, with positive ou
Slide 26: Investment Summary
Investment Summary ▪ Fully permitted and state of the art infrastructure advantage with Hobson Processing Plant ▪ Pipeline of fully licensed, low-cost ISR projects – potential production profile of 4Mlbs/year in Texas and Wyoming ▪ U.S. projects can provide supply under Trump’s $1.5B Uranium Reserve
Slide 27: Nuclear Energy Saves Lives – Improves Quality of Life
Nuclear Energy Saves Lives – Improves Quality of Life Nuclear is the safest way to make reliable electricity and has saved over 3 million lives that would have been lost prematurely to deadly air pollution from energy alternatives. https://www.nextbigfuture.com/2019/01/nuclear-power-has-saved-3-4-mi
Slide 28: Germany's Energiewende vs. France Nuclear
Germany’s “Energiewende” France Gets 72% of its “Failed Energy Policy” Electricity from Nuclear Power 160 Billion Euro Investment in THEY ENJOY: Per kW carbon emissions 1/10 that of Germany “Green Energy” has resulted in: ✓ ✓ Electricity rates 1/2 that of Germany ▪ Zero Progress in Reducing Carbon E
Slide 29: Nuclear Power Growth Remains Robust
Nuclear Power Growth Remains Robust 29 47 Reactors Connected in 7 Years 54 Units Under Construction ▪ China announced that it is likely to triple nuclear power capacity by 2030 ▪ India plans for 21 new nuclear reactors by 2031 ▪ U.A.E. completing construction on 4 units ▪ U.K. upgrading nuclear flee
Slide 30: Small Modular Reactor (SMR)
Small Modular Reactor (SMR) An Important Emerging Market ▪ SMR global market: 65-85 GWe by 2035 – small scalable reactors: ▪ Size: 5 up to 300 MWe ▪ Simpler design - lower capital and operating cost ▪ Cost competitive with natural gas ▪ Western U.S. utilities planning for 12 of the NuScale Power SMR
Slide 31: Need for New Production – Beyond Existing Mines
Need for New Production – Beyond Existing Mines Trade Tech’s “Market Appetite” for New Production Inventory Overhang Appetite for New Production Secondary Supply Drawing Down Established Production Base (Weighted) Reactor Requirements Uranium Price Too Low to Stimulate New Production Within the Perm
Slide 32: Utility Procurement Cycle
Utility Procurement Cycle: Old Contracts Rolling Off…New Contracts Need to be Signed Utility Uncommitted Demand Historic Long Term Contracting Source: UxC Market Outlook Q1 2020 32
Slide 33: Global Cost Curve – Most U.S. Production is ISR
Global Cost Curve – Most U.S. Production is ISR Source: TradeTech 33
Slide 34: Overdependence on Foreign Supplies
Overdependence on Foreign Supplies U.S. Uranium Imports vs. Production: 1970-2018 Source: EIA Report 2018, UxC, LLC 34
Slide 35: Bottom Line - Positive Market Outlook
Bottom Line - Positive Market Outlook ✓ Demand Growth – 47 reactors added to grid in past 7 years. Global nuclear energy generation has recovered to pre-Fukushima levels ✓ Underinvestment and Supply Cutbacks – Kazakhs, Cameco, Orano, and others, resulting in significant primary supply deficit ✓ Lead
Slide 36: Combined Resource Summary
Combined Resource Summary(1) Projects Measured & Indicated Inferred Hub & Spoke ISR Portfolio Tons Grade Lbs U3O8 Tons Grade Lbs U3O8 Texas ISR (‘000) (% U3O8) (‘000) (‘000) (% U3O8) (‘000) Palangana 393 0.14 1,057 328 0.18 1,154 Burke Hollow - - - 4,064 0.088 7,093 Goliad 3,790 0.05 5,475 1,547 0.0