Gemfields — Technical Presentation (April 2014)

21 slides from Gemfields's technical presentation, Apr 14, 2014

  1. Slide 1: A warm welcome to the delegation from London

    A warm welcome to the delegation from London 0

  2. Slide 2: MRM — Location & Accessibility

    MRM — Location & Accessibility The world’s single largest coloured gemstone producer

  3. Slide 3: Mine, Wash Plant, Mine Camp

    Mine Wash Plant Mine Camp The world’s single largest coloured gemstone producer

  4. Slide 4: Timeline of Key Events

    Timeline of Key Events Montepuez Ruby Mining LDA (‘MRM’) — 75% owned by Gemfields PlC • 03rd Jun 2011: JV agreement signed between Gemfields plc and Mwiriti Lda • 30th Aug 2011: Montepuez Ruby Mining Lda (MRM) comes into existence • 24th Feb 2012: The mining licenses 4702 and 4703 issued in the name

  5. Slide 5: The first heavy mining machinery arrived on site in April 2012

    The first heavy mining machinery arrived on site in April 2012. The total fleet as now consisted of: • CAT 330D excavator x 4 • CAT 725 ADT x 11 • TATA 2523 tipper x 3 • CAT D7R dozer x 1 • CAT 950H wheel loader x 1 • CAT 428E back hoe loader x 1 • CAT 140H motor grader x 1 • Volvo diesel bowser • M

  6. Slide 6: MRM — Geology Explained

    MRM — Geology Explained Rubies are hosted by eluvial/colluvial/alluvial material and in the underlying amphibolitic bedrock. MRM The Montepuez Complex comprises of rocks, ranging from granitic to amphibolitic in composition, with quartzites and marble at places. The rocks of the Montepuez Complex ar

  7. Slide 7: Ruby Formation Explained

    Ruby Formation Explained The world’s single largest coloured gemstone producer

  8. Slide 8: Primary & Secondary Ruby Mineralisation

    Primary Ruby Deposits Primary & Secondary Ruby Mineralisation Secondary Ruby Deposits Granite/Gneisses Litho - I Litho - II Litho - III Amphibolites & Gneisses River channels Unlike many other rocks, rubies and Quaternary Fluvial plain Lake sapphires can only form under a limited Range of high press

  9. Slide 9: Ruby Exploration Methods

    Ruby Exploration Methods 500000 520000 540000 560000 580000 600000 8620000 8620000 8600 000 8600 000 GEOLOGICAL METHOD TYPICAL ASSOCIATION WITH 8580 000 8580 000 CERTAIN ROCKS OR MINERALS 8560 000 8560 000 GEOPHYSICAL METHOD 8540 000 8540 000 MAGNETIC SUCEPTIBILITY, SPECIFIC GRAVITY, CONDUCTIVITY, R

  10. Slide 10: MRM — Bulk Sampling

    MRM — Bulk Sampling • Bulk sampling began in August 2012 • To the end of Feb 2014 total rock handling is 960,000 tonnes • Bulk sampling is presently taken place within 2 main networks – the Core Sector and Mugloto. Within each network are a series of pits, most notably the Maninge Nice and Mugloto P

  11. Slide 11: Maninge Nice Bulk Sampling

    Maninge Nice Bulk Sampling Top Soil Amphibolite Feldspathic Vein Ruby mineralisation Old working Top Soil Gravel Bed Basement Gneiss weathered rock The world’s single largest coloured gemstone producer

  12. Slide 12: Bulk Sampling

    Total Rock Ore Mined Ore Washed Gem Production Ore Grade Stripping Pit Handling Primary Secondary Primary Secondary Primary Secondary Primary Secondary Ratio T T T T T ct ct ct/T ct/T Maninge Nice 600,282 89,669 110,660 14,526 49,081 2,324,046 4,878,732 160 99 2.00 Central 24,589 4,134 2,563 2,585 6

  13. Slide 13: Wash Plant

    Wash Plant Initial 50 TPH pilot wash plant has been augmented to a 100 TPH realistic and more efficient capacity since its arrival in Nov 2012 with further additions of dry screen, logwasher and jigs The world’s single largest coloured gemstone producer

  14. Slide 14: Wash Plant Flow Sheet

    13 Wash Plant Flow Sheet -3mm, +75µm TPH wt% 16 18 Crusher Head Feed -3mm -3mm BC-2 Chieftain Dry Screen (I.C.E.) TPH wt% TPH wt% 150 100 TPH wt% 48 32 Dewatering screen Tailings 150 100 (Pilot Crushtec) TPH wt% 22 32 Chute -3mm 50P Jig (OVM) 50S Jig (OVM) -70, +3mm -25, +3mm Logwasher (Terex) BC-1

  15. Slide 15: Sort House

    Sort House MRM have formulated the world’s first grading system for Montepuez rubies in the rough. The world’s single largest coloured gemstone producer

  16. Slide 16: Sort House

    Sort House The world’s single largest coloured gemstone producer

  17. Slide 17: Namanhumbir Housing & Office Complex

    Namanhumbir Housing & Office Complex The world’s single largest coloured gemstone producer

  18. Slide 18: Work Plan – Phase I

    Work Plan – Phase I Activity Time line Status Realistic time Line Arrival of mining equipment: Apr 2012 –Arrived on 3rd Commissioned April Approach roads, ground preparation etc.: Apr-Jun 2012 On going On going Camp erection in Namanhumbir: May-Nov 2012 Completed – April 2014 landscaping in progress

  19. Slide 19: Presidential Visit – April 2014

    Presidential Visit – April 2014 The world’s single largest coloured gemstone producer

  20. Slide 20: Corporate Social Responsibility

    Corporate Social Responsibility The world’s single largest coloured gemstone producer

  21. Slide 21: Thank you

    Thank you The world’s single largest coloured gemstone producer