Slide 1: Duralie Coal CCC Meeting Presentation – Company Report & Overview of Activities
Duralie Coal CCC Meeting Presentation – Company Report & Overview of Activities February 2021 Michael Plain Environment & Community Superintendent
Slide 2: Table of Contents
Table of Contents 1. Agenda Item 7a - Progress at the Mine 2. Agenda Item 7b - Environmental Reporting 3. Agenda Item 7c - Environmental Management Plans & Monitoring 4. Agenda Item 7d - Community Complaints 5. Agenda Item 7e - Community Programs 2 12 February 2021 2
Slide 3: Covid-19 Response
Covid-19 Response The impacts of the Covid-19 pandemic has been risk assessed with significant measures undertaken on-site to protect and safeguard the health of our team members and community from infection and to protect our ability to operate our core business. Measures on site include but are no
Slide 4: 1. Progress at the Mine
1. Progress at the Mine 2nd Half 2020 ▪ Progressive PAF re-handling works were continued to September 2020. PAF re-handle will recommence in 2021. ▪ Planning next round of rehabilitation works. ▪ Planning for recommencement of mining activities in 2021 1st Half 2021 (refer to Duralie Project Update
Slide 5: 2. Environmental Reporting & Regulators
2. Environmental Reporting & Regulators Management Project Status Area Reporting • Duralie Coal Mine Annual Review • The Duralie Coal Mine 2019/20 Annual Review has been prepared at submitted in 2019/20 September 2020. The Annual Review has been made available to the CCC and on the Duralie Coal webs
Slide 6: 3. Environmental Management Plans & Monitoring
3. Environmental Management Plans & Monitoring a) Air Quality Management b) Blast Management c) Noise Management d) Water Management e) Rehabilitation Management f) Biodiversity Management g) Mine Closure Planning 6 12 February 2021 6
Slide 7: 3a. Air Quality Management
3a. Air Quality Management Management Area Project Status Air quality monitoring • Real-time air quality system • The real-time air quality TEOM monitor on Martins Crossing Rd continues to operate. • HVAS & dust gauge • General ambient PM10 dust levels have been very low throughout monitoring networ
Slide 8: 3a. Air Quality Management – Dust Gauge Monitoring
3a. Air Quality Management Duralie Dust Gauge Monitoring - Annual Rolling Average 12 Months to January 2021 4.5 4.0 3.5 Dust (g/m2/month) 3.0 2.5 2.0 1.5 1.0 0.5 0.0 Jan-20 Feb-20 Mar-20 Apr-20 May-20 Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 D3 D4 D5 D7 D8 D9 D10 D12 D13 DP&E limit Jan-20 D3
Slide 9: 3a. Air Quality Management – HVAS Monitoring (PM10)
3a. Air Quality Management Duralie HVAS Monitoring (PM10) 12 Months to January 2021 PM10 (µg/m3) 40 20 0 1-Dec-19 30-Jan-20 30-Mar-20 29-May-20 28-Jul-20 26-Sep-20 25-Nov-20 24-Jan-21 High Noon Twin Houses Hattam Edwards DP&E Limit Duralie HVAS Monitoring (PM10) Annual Rolling Average - 12 Months to
Slide 10: 3b. Blast Management
3b. Blast Management Management Project Status Area Blasting • Blast monitoring • Blast activities at the DCM were ceased on 17 August 2018. • Blasting is proposed to recommence in Q1 2021. Blasting will be undertaken in discrete periods during 2021 with only a limited number of blasts required. • N
Slide 11: 3c. Noise Management
3c. Noise Management Management Project Status Area Noise • Routine Monitoring • Quarterly monitoring continued during H2 2020. All results were compliant with noise Monitoring criteria. • Noise reports are made available on the Duralie Coal website. • Routine quarterly noise monitoring of operation
Slide 12: 3d. Water Management
3d. Water Management Management Project Status Area Site Water • Annual water balance review. • The 2020 annual site water balance is currently being prepared. A summary will be Management included in the Annual Review 2020/21 and will be available on the Duralie Coal website. Surface Water • Routin
Slide 13: 3d. Water Management – Rainfall and Surface Water Monitoring
3d. Water Management Duralie Mine Site - Monthly Rainfall Duralie Surface Water Monitoring - pH 6 months to January 2021 10 300 9 200 8 Rainfall (mm) 7 100 6 5 2021 0 28-Jun-20 28-Jul-20 27-Aug-20 26-Sep-20 26-Oct-20 25-Nov-20 25-Dec-20 24-Jan-21 2020 JAN FEB MAR APR MAY JUN SW2 - DCPL (CSC) SW2 RC
Slide 14: 3e. Rehabilitation Management
3e. Rehabilitation Management Management Area Project Status Rehabilitated Waste • Rehabilitation Works • No rehabilitation works were undertaken during H2 2020. emplacements • 20ha of native rehabilitation was completed in H1 2020 including topsoil spreading and seeding. • Rehabilitation maintenanc
Slide 15: 3e. Rehabilitation Management – Dam Decommissioning
3e. Rehabilitation Management Management Area Project Status Dam • Auxiliary Dam 1 • Decommissioning and rehabilitation of AD1 was completed in H1 2020, 20ha of non- Decommissioning native pasture. • AD1 Clay core was recovered and has been stockpiled for use for the clay lining in the Coal Shaft Cr
Slide 16: 3f. Biodiversity Management
3f. Biodiversity Management Management Project Status Area Biodiversity • Revegetation Planning • Planning has been completed for the revegetation works scheduled in Q1 2021. Offset • Revegetation works • Approximately 36,100 native tubestock over 114 hectares on the eastern side of Johnsons Creek R
Slide 17: 3f. Biodiversity Management – Flora, Fauna and Pest Control
3f. Biodiversity Management Management Project Status Area Flora/Fauna • Nest Box Program • Annual Nest box monitoring was undertaken during November 2020 including the new nest boxes in the rehabilitation area . A summary of the nest box progress will be included in the next Annual Review. Approxim
Slide 18: 3g. Mine Closure Planning
3g. Mine Closure Planning Note: *Refer to Duralie Mining Operations Plan & Rehabilitation Management Plan Table 13 Mine Closure Planning Schedule. *Further detail on mine closure planning progress is included in the Annual Review 2019/20. Management Project Status Area Mine Closure • Stakeholder • C
Slide 19: 3g. Mine Closure Planning – Environmental Management Plans
3g. Mine Closure Planning Note: *Refer to Duralie Mining Operations Plan & Rehabilitation Management Plan Table 13 Mine Closure Planning Schedule. *Further detail on mine closure planning progress is included in the Annual Review 2019/20. Management Project Status Area Environmental • EMP reviews fo
Slide 20: 4. Community Complaints
4. Community Complaints Duralie Complaint Summary Period: 01/06/2020 - 31/1/2021 Period: 6 Months Total No. of Complaints: 0 (0 noise, 0 blast, 0 air quality, 0 other) Total No. of Complainants: 0 Date/Time of Method of Nature of Complaint Complainant Location Complaint Complaint Investigation/Outco
Slide 21: 5. Community Programs
5. Community Programs Management Area Project Status Support Programs Stratford Coal • The application period for the Stratford Coal Community Support Program for 2021 has now Community Support closed. A review of the applications is currently being undertaken and notification to the Program success