Slide 1: Field Results of Energy Maximizing Distributed DC Topology – Residential & Commercial Installations
Field Results of Energy Maximizing Distributed DC Topology – Residential & Commercial Installations John Berdner, SolarEdge General Manager for North America 8. September, 2010 1
Slide 2: Energy Loss Factors in Traditional PV Systems
Energy Loss Factors in Traditional PV Systems System Energy Loss Design Energy Loss Module mismatch Limited roof utilization due to design constraints Partial shading Undervoltage/Overvoltage Indirect Energy Loss Dynamic weather MPPT loss No module level monitoring ©2010 SolarEdge 2
Slide 3: SolarEdge System Overview
SolarEdge System Overview Module level optimization Module level monitoring Fixed voltage - ideal installation Enhanced safety solution Power Optimizer Inverter Monitoring Server Internet Monitoring Portal ©2011 SolarEdge 3
Slide 4: SolarEdge Distributed Technology
SolarEdge Distributed Technology ASIC-based Power Optimizers achieve: Per-module Maximum Power Point Tracking (MPPT) Efficiency: 98.8% EU weighted (99.5% peak) Conversion modes: buck, boost and buck/boost Wide module compatibility: 5v-125v, up to 400w Power Line Communication transceiver
Slide 5: Fixed String Voltage - Enabler
Fixed String Voltage - Enabler String voltage is always fixed, regardless of temperature and string length Flexible design for increased roof utilization: ⁻ Parallel strings of unequal lengths ⁻ Modules on multiple roof facets ⁻ Modules with different power ratings ⁻ Modules of different technolog
Slide 6: Field Trials and Results
Field Trials and Results 6 ©2010 SolarEdge
Slide 7: Roof Utilization Case Study – Israel
Roof Utilization Case Study – Israel Optimal roof space utilization enabled a 15kW residential installation Four facets covered Unmatched modules in each string were necessary: Different module sizes (and rating) Different tilt and azimuth 25 Suntech 280W modules 34 Suntech 210W module
Slide 8: Roof Utilization Case Study – Results
Roof Utilization Case Study – Results Module-level monitoring reveals: No mismatch losses (module-level MPPT) No string mismatch losses (length agnostic fixed string voltage) Attractive 5.1 kWh/kWp per day during August (compared to 5.5 for South-only sites) 280w 280w West East 210w 210w Wes
Slide 9: Comparative Energy Case Study Methodology
Comparative Energy Case Study Methodology Side by side energy comparisons under similar conditions: Standard inverter compared to distributed system Both systems subjected to: Identical total DC capacity (otherwise comparing kWh/kWp) Identical module tilt and orientation Identical irradi
Slide 10: Comparative Case Study 1 - Italy
Comparative Case Study 1 - Italy Power optimizers + SE5000 compared to four traditional inverters of various brands (5kW, 5kW, 3kW, 6kW) Comparison without shading, and with simulated shading. Experiments done by Albatech, a MetaSystem Group company, an Italian MW-scale turn-key integrator, an
Slide 11: Case Study 1 – Unshaded Results
Comparative Case Study 1 – Unshaded Under unshaded conditions distributed system produced 2.3% - 6.4% more energy than the traditional inverters Energy Production 06-15 July 2010 60.00 50.00 Power Optimizers 40.00 kWh 30.00 + SE5000 20.00 10.00 0.00 11 ©2010 SolarEdge
Slide 12: Comparative Case Study 1 – Shaded
Comparative Case Study 1 – Shaded A cardboard panel was used to simulate a chimney-like sliding shadow on 1-2 modules in each string with a distributed system and inverter A The best performing inverter of three other un-shaded traditional inverters was used as a reference SolarEdge Inverter A D
Slide 13: Case Study 1 – Shaded Results
Comparative Case Study 1 – Shaded (Cont.) In reference to the unshaded inverter: The distributed system recovered more than 50% of the energy lost by traditional inverter A due to shading (-4% vs. to -8.63%) Shaded Unshaded 6.00 5.65 5.43 5.00 5.20 5.21 5.27 4.00 Power Optimizers kWh 3.00 2.00 + S
Slide 14: Comparative Case Study 2 – Czech Republic
Comparative Case Study 2 – Czech Republic Power optimizers + SE5000 compared to 5kW inverter of a leading brand Each inverter connected to 2 strings x 12 AWS modules x 185w = 4.4kWp Three partly shaded modules in each string of each system A third system remains unshaded for reference Test
Slide 15: Case Study 2 – Results
Comparative Case Study 2 – Results The distributed system produced 30.3% more energy than the traditional inverter (58.96 kWh vs. 45.25 kWh) In reference to the unshaded inverter, the distributed system recovered 77% of the energy lost by the traditional inverter due to shading (6.5% loss vs. 28
Slide 16: Comparative Case Study 3 - Germany
Comparative Case Study 3 - Germany Power optimizers + SE5000 compared to traditional 5kW inverter with multiple MPP trackers 2 string x 12 and 13 Solon P210 modules x 210w = 5.25kWp A section inside a large scale PV field No shading 16 ©2010 SolarEdge
Slide 17: Comparative Case Study 3 - Results
Comparative Case Study 3 - Results The distributed system produced 1.65% more energy than the traditional inverter On days with dynamic weather conditions, distributed module-level MPPT recovers energy otherwise lost due to delayed MPPT process Power Module-level MPPT energy Power Optimizers + S
Slide 18: The Impact of Dynamic Weather Conditions
The Impact of Dynamic Weather Conditions As shown in comparative case study 3, moving clouds induce rapid fluctuations in irradiance level Centralized inverters are Sep 2nd 2010 more limited in their ability to track changes in Imp as fast as they occur, compared to module-level MPP trackers 10:
Slide 19: Comparative Case Study 4 – Germany
Comparative Case Study 4 – Germany Power optimizers + SE5000 compared to traditional 5kw inverter with several MPP trackers 2 strings x 9 Trina TSM220 modules x 220w = 3.96kWp Artificial shading simulating commercial layout inter-row shading covers 0.5% of the PV array ©2010 SolarEdge 19
Slide 20: Case Study 4 – Results
Comparative Case Study 4 – Results The distributed system produced 4% - 8% more energy than the traditional inverter on most days of the month Distributed system production was lower on days with very low irradiance, due to sizable self consumption of the prototype DSP version of the unit, now r
Slide 21: Comparative Case Study 5 – Spain
Comparative Case Study 5 – Spain Layout Power optimizers + SE5000 compared to traditional inverter of a leading brand 2 strings x 7 BP 3200N modules x 200w = 2.8kWp Shading Shade from a nearby electricity cable Typical of residential sites Module-level monitoring revealed shading pattern ©
Slide 22: Case Study 5 – Results
Comparative Case Study 5 – Results Accumulated Energy comparisons shows the distributed system consistently produces 4% more energy than the traditional inverter Traditional [kWh] SolarEdge [kWh] Energy Gain in [%] Weekly Energy Gain [%] 22 ©2010 SolarEdge
Slide 23: Comparative Case Study 6 - Spain
Comparative Case Study 6 - Spain Inverters Power optimziers + SE6000 compared to two traditional 3kw inverters 4 strings x 10 Isofoton IS-150P modules x 150w = 6 kWp Shading Inter-row Inter-row shading shading Typical of commercial roof with dense installations Modules are shaded for 2-3 h
Slide 24: Comparative Case Study 6 - Results
Comparative Case Study 6 - Results The distributed system produced 4.5% more energy on average than the traditional inverter. On sunny days the distributed system produced up to 14% more energy due to intensified partial shading On very cloudy days the distributed system produced 2% – 3% more
Slide 25: Questions
Questions how what where when why how Questions! what who who where when why 25 ©2010 SolarEdge
Slide 26: Thank you
Thank you John Berdner, General Manager North America Website: Email: John.berdner@solaredge.com www.solaredge.com Twitter: www.twitter.com/SolarEdgePV Blog: www.solaredge.com/blog 26 ©2010 SolarEdge