  1. Slide 1: Inside Lithium

    Inside Lithium December 12th, 2025 Salta, ARGENTINA Geoff STREETON, Group CDO Jean-Baptiste HOGARD, Lithium Senior VP Fabien BURDET, Lithium CPO

  2. Slide 2: Disclaimer

    Disclaimer Certain information contained in this presentation including any information on Eramet’s plans or future financial or operating performance and any other statements that express management’s expectations or estimates of future performance, constitute forward-looking statements. Such state

  3. Slide 3: Today’s Speakers

    Today’s Speakers Opening remarks Geoff Streeton Jean-Baptiste Hogard Fabien Burdet Chief Development Officer Lithium Senior VP Lithium Chief Process Officer 3 ERAMET – LITHIUM WEBINAR

  4. Slide 4: Today’s highlights

    Today’s highlights Centenario ramp up: Presenting Eramet’s key strengths in lithium brine processing the emerging new • Proprietary DLE technology delivering proven high-performance at Centenario lithium producer Key strengths • Integrated expertise across the value chain: from exploration to operat

  5. Slide 5: Establishing leadership in lithium extraction from brine

    Establishing leadership in lithium extraction from brine 01

  6. Slide 6: At the core of our process: Direct Lithium Extraction

    At the core of our process: Direct Lithium Extraction A step-change in lithium extraction from brine, enhancing capacity, selectivity & sustainability Lithium Extraction & Concentration Processes Liquid Pumping (Li-rich Brine) Hard Rock Mining (Ore) Natural Evaporation Industry trend Direct Lithium

  7. Slide 7: Our overall process capabilities

    Our overall process capabilities Unique capabilities from 15-years of continuous R&D in lithium extraction & processing Assembled resources Unique capabilities developed ~40 high-caliber engineers & technicians dedicated to lithium at Design full process flowsheet2 Eramet’s R&D center Develop & Indu

  8. Slide 8: Our sorbent, at the heart of our process

    Our sorbent, at the heart of our process A highly efficient proprietary adsorption technology supported by dedicated production in Europe, solely contracted to Eramet Development of Eramet proprietary sorbent for adsorption-DLE Comparison of Eramet generation 3 sorbent at iso-brine vs. 3 other sorbe

  9. Slide 9: Our DLE performance in Centenario

    Our DLE performance in Centenario Industrial-scale DLE, in line or above design targets Li recovery in DLE (%) 100 >90% 95 Yield in DLE recovery 90 Design yield DLE Jul Aug Sep Oct Nov Mg1 rejection rate in DLE (%) 100.0 >99% 99.5 99.0 Design Impurity DLE rejection rate selectivity Jul Aug Sep Oct N

  10. Slide 10: Our flowsheet in Centenario

    Our flowsheet in Centenario Overall process highly efficient, stable & sustainable in the DLE x 2 lithium global recovery1 vs. evaporation process Mature treatment and technology processing technologies Extraction / Refining & Li sorption Concentration Conversion No pre-concentration evaporation Bri

  11. Slide 11: Our leadership in lithium extraction from brine

    Our leadership in lithium extraction from brine Full in-house expertise: exploration, technology, development, & operations ~115 brine deposits assessed in the Extensive knowledge of brine deposits (particularly salar brines) Resource Lithium Triangle development End-to-end ESG approach integrating

  12. Slide 12: World class producing asset with strong growth potential

    Word class producing asset with strong growth potential 02

  13. Slide 13: Centenario: a Tier-1 asset

    Centenario: a Tier-1 asset First new generation DLE plant operating at industrial scale at the heart of the Lithium Triangle Ratones volcano Centenario plant Pacific Ocean Source for ~15 Mt-LCE1 • 100% owned by Eramet BOLIVIA resource sitting in the salars of • 24kt-LCE designed capacity Centenario

  14. Slide 14: Centenario: stringent Health & Safety standards

    Centenario: stringent Health & Safety standards Health & Safety approach tailored to achieve zero harm Health Upfront medical check Hypoxia Clinic at highest standard for (4,000m high) remote medicine Remoteness Emergency evacuation procedures TRIFR2 (up to 1,700 people on site) Process HAZOP1 safet

  15. Slide 15: Centenario: development phase

    Centenario: development phase ~10 years of de-risking from CSR to full process Free Prior Informed Consent (FPIC) obtained in 2020 (renewed in 2022) Strong social Environmental Impact Assessment (EIA) approved in 2019 acceptance to project (renewed in 2023) 80% of Eramet employees in Argentina comin

  16. Slide 16: Centenario: development phase

    Centenario: development phase Strong support from Argentina & the Salta Province to our projects 5 greenfield Lithium Resource ownership open to private and foreign investors projects commissioned in Favourable Lithium fully concessible Argentina in the last jurisdiction Transparent and competitive

  17. Slide 17: Centenario: construction phase

    Centenario: construction phase Successful construction of a first-of-its-kind plant in a complex environment Build infrastructure for energy (gas compression plant) and labor transportation & housing (airstrip and camp) Construction of the DLE plant & lithium carbonate refinery La Puna1 Execute resp

  18. Slide 18: Centenario: construction phase

    Centenario: construction phase Sole greenfield Full-DLE in operation, constructed at competitive capex Sole Full-DLE greenfield project Capital intensity of major greenfield brine projects1 (outside China) commissioned by stage of development & type of extraction process 100,000 Lionheart 1 (Vulcan)

  19. Slide 19: Centenario: operating phase

    Centenario: operating phase Successful ramp-up on track to reach full capacity by end 2026 5-months to achieve 65% Centenario 24 kt-LCE All capacity available End 2026 capacity Mid-2026 Close to100% vs. 13-months for next 100 ~90% C1 Start-up / Ramp-up McNulty curves1 Other best ramp-up commissionin

  20. Slide 20: Centenario: operating phase

    Centenario: operating phase Targeting world-class cost position On target specific consumptions of reagents & energy Expected evolution of Cash Breakdown of optimized observed during ramp-up cost Ex-Works1 cash cost Ex-Works1 % 100 80 60 Energy access through 40 connection to gas 20 % nameplate capa

  21. Slide 21: Centenario: operating phase

    Centenario: operating phase Targeting first quartile position in the lithium cost curve Lithium 2026e cash cost curve CIF1 Optimised cash cost at nominal capacity for Eramet 15 Cash cost, $/kg LCE CIF 2026 market consensus (10,500 $/t-LCE)2 10 Strong 2025 YTD price3 resilience expected in 2025- 5 li

  22. Slide 22: Centenario: marketing phase

    Centenario: marketing phase Successful penetration in the battery value chain c.$8,500/t-LCE1 90% average realized price in 9m 2025 of sales realized in China vs. ~8,800 $/t-LCE for the SMM BG Li2CO3 99.5% & for battery applications 20 customers, including 50% of sales Made through GLENCORE under a

  23. Slide 23: Centenario Full Potential

    Centenario Full Potential 100 % ownership A disciplined & targeted investment approach to drive expansion 40-year life of mine (24 kt-LCE capacity) ~ 15 Mt-LCE resources ~15 Mt-LCE1 and sufficient freshwater resources 50km identified to support capacity expansion above 75 kt-LCE Ongoing study of low

  24. Slide 24: Eramet lithium strategy

    Eramet lithium strategy 03

  25. Slide 25: Current lithium market outlook

    Current lithium market outlook High demand growth, fast-transforming market, supply playing catch up Strong demand growth from batteries, with Supply to lag demand despite new sources of very large upside from ESS supply, as prices curbs investments and delays persist What could be next? China & Afr

  26. Slide 26: Our strategic take on lithium

    Our strategic take on lithium Accelerating structural shifts throughout the value chain put strategic pressure on new lithium project developers Lithium Conversion & CAM & Cell End-markets extraction Refining Manufacturing Key challenges Evolution of Certainty of lithium Which lithium Demand side li

  27. Slide 27: Our competitive positioning

    Our competitive positioning Well equipped to succeed Key success factors in lithium Match with Eramet capabilities Established expertise in lithium project development, full Reduce capital intensity flowsheet design and project construction & delivery • flowsheet design to minimize uncompetitive cap

  28. Slide 28: Looking ahead: shaping the future of lithium leadership

    Looking ahead: shaping the future of lithium leadership Positioning Eramet as a western leader in lithium Anchor direct customer relationships in the battery value chain and build foothold in higher-margin niche markets Commercial Diversify customer base, initially towards South Korea & Japan, follo

  29. Slide 29: Q&A

    Q&A 29 ERAMET – LITHIUM WEBINAR

  30. Slide 30: ECfraAMeT

    I ECfraAMeT