  1. Slide 1: 2018 Annual General Meeting

    2018 Annual General Meeting May 8, 2018 STEPHEN LETWIN, PRESIDENT AND CHIEF EXECUTIVE OFFICER Empowering People, Extraordinary Performance l TSX: IMG l NYSE: IAG l

  2. Slide 2: Cautionary Statement

    Cautionary Statement All information included in this presentation whether in narrative or chart form, including any information as to the Company’s future financial or operating performance, and other statements that express management’s expectations or estimates of future performance, other than s

  3. Slide 3: President's Awards

    HARM Dano 4ERY 2 PRESIDENT’S AWARDS HEALTH & SAFETY | SUSTAINABILITY

  4. Slide 4: President's Awards: Health & Safety

    President’s Awards 2017 PRESIDENT’S AWARD FOR HEALTH & SAFETY ESSAKANE MINE in Burkina Faso 3

  5. Slide 5: President's Awards: Sustainability

    President’s Awards 2017 PRESIDENT’S AWARD FOR SUSTAINABILITY ROSEBEL MINE in Suriname 4

  6. Slide 6: President's Awards: Exploration

    President’s Awards 2017 PRESIDENT’S AWARD FOR EXPLORATION MALI-SIRIBAYA 5

  7. Slide 7: 2017 Performance

    2017 Performance 140% 120% 100% 80% 60% IMG IAG 40% 20% Gold 0% - GDX -20% -40% 6

  8. Slide 8: 2017 Highlights

    2017 Highlights1 Gross profit up 50% Achieved production and cost guidance: • Attributable production of 882,000 ounces (up 8%) • Total cash cost of $755/oz (up 2%) • AISC of $1,003/oz (down 5%) $816 million in cash, cash equivalents, short-term investments, and restricted cash Reduced long-term deb

  9. Slide 9: Attributable Reserves: Structured for Long-Term Growth

    Structured for Long-Term Growth 16 86% 14.5 Moz 14 Increase Reserve Increases4 Côté: +3.8Moz 12 Attributable Reserves (Moz) 1,2,3 Rosebel: +1.7Moz 10 Boto: +1.4Moz 7.8 Moz Essakane: +0.5Moz 8 Westwood: +0.3Moz 6 4 2 0 2016 2017 *Reserve numbers included on this slide have been rounded 1. Mineral res

  10. Slide 10: Leveraging Existing Asset Base

    Leveraging Existing Asset Base Optimizing Operations & Organic Growth Opportunities

  11. Slide 11: Value Creating Projects Support a Solid Growth Strategy

    Value Creating Projects Support a Solid Growth Strategy Short-Cycle Capacity Long-Cycle Capacity Rosebel Gold Mine Côté Gold Project • Saramacca • Mine optimization • Joint-venture agreement with • Continued concession consolidation Sumitomo Metal Mining Co., Ltd. • Shorter • Longer Essakane Gold Mi

  12. Slide 12: Rosebel – Significant Transformational Achievements

    Rosebel – Significant Transformational Achievements Suriname (95%) Increased Reserves & Resources • 69% increase in attributable Reserves to 3.5M oz Extends LOM to 2028, • Increase mainly due to mine plan optimization and cost reductions before inclusion of • Potential for further increase with Sadd

  13. Slide 13: Essakane – Driving Transformational Change

    Essakane – Driving Transformational Change Burkina Faso (90%) Heap Leaching • Incremental production from marginal grade material within the existing pit Potential to transform • Expect to complete Prefeasibility Study in Q2’18 Essakane with • Potential production start by end of 2019 additional 3 t

  14. Slide 14: World's Largest Hybrid Solar/Thermal Power Plant

    World’s Largest Hybrid Solar/Thermal Power Plant Essakane Mine, Burkina Faso Commissioned in Q1’18 • 15MWp solar plant + 57MW thermal plant • Approximately 130,000 photovoltaic panels • Decrease fuel consumption by ~6 million litres per year • Reduce annual CO2 emissions by 18,500 tons 13

  15. Slide 15: Westwood – Ramping up to Full Production

    Westwood – Ramping up to Full Production Quebec (100%) Ramping Up Continues • Production expected to be between 125,000 and 135,000 oz in 2018 with Ramping up to full production planned from two of the six designed mining blocks production by 2020; • Block 3 slated to start up in 2019; Block 4 in 20

  16. Slide 16: Côté Gold Project

    Côté Gold Project Ontario (64.75%) Key accomplishments since acquisition in 2012 Attributable 64.75% Tonnes Grade Contained Ounces • Completed Prefeasibility Study and initiated Feasibility Study (000) (g/t) (000 Au) • Converted 5.9 Moz (100%) from resources to reserves Probable Reserves1 126,961 0.

  17. Slide 17: Sadiola - Potential to Revitalize Mine

    Sadiola - Potential to Revitalize Mine Mali (41%) Sadiola Expansion Project Sulphide Expansion Project • Aligned with partner AngloGold Ashanti Limited to move Sulphide 2015 Technical Report1 Project forward Strip Ratio 3.9 • Discussions with Malian government continue - have not reached resolution

  18. Slide 18: Boto Gold Project

    Boto Gold Project Senegal (100%) Pre-feasibility Study Highlights Tonnes Grade Contained Ounces • Mine life of 13.5 years with mill throughput of 2.0Mtpa (000) (g/t) (000 Au) • LOM average annual production of nearly 100,000 oz with Probable Reserves1 26,841 1.64 1,415 higher production in early yea

  19. Slide 19: Q1 2018 Highlights

    Q1 2018 Highlights1 Net earnings of $42 million, or $0.09/share (up 335%) Net Operating Cash Flow of $106 million (up 58%) Gold margin of $594/oz (up $130/oz) Attributable production of 229,000 ounces (up 7%) Total cash cost of $737/oz (down $29/oz) AISC of $953/oz (down $39/oz) $856 million in cash

  20. Slide 20: 2018 – Abundance of Catalysts

    2018 – Abundance of Catalysts 2018 Q1 Q2 Q3 Q4 2019 2020 2021 Saramacca Gold Essakane Heap Essakane Oxygen Essakane ✔ Saramacca Reserve Saramacca Côté District Leach Pre-feasibility plant HL declaration production production Consolidation Study Commissioning production Côté ✔ Boto Pre-feasibility Si

  21. Slide 21: Technical Information and Qualified Person/Quality Control Notes

    Technical Information and Qualified Person/Quality Control Notes The mineral resource estimates contained in this presentation have been prepared in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”). The “Qualified Person” responsible for the super

  22. Slide 22: Thank You

    Thank You l TSX: IMG l NYSE: IAG l