Almonty Industries Inc. · NASDAQ:ALM

Almonty Industries — Investor Presentation (September 2022)

29 slides from Almonty Industries's investor presentation, September 2022

  1. Slide 1: Building The World's Largest Tungsten Mine

    INVESTOR PRESENTATION Building The World’s Largest Tungsten Mine + ALMONTY INVESTOR PRESENTATION ADDRESS PREPARED BY ALMONTY INDUSTRIES INC. 100 KING ST W PRESIDENT & CEO: LEWIS BLACK ONTARIO, M5X 1A9. CANADA ALMONTY Oo 0,0 0 eeee OMe . (Ee) CONTACT US +1647 438-9766 info@almonty.com O@o OeoO

  2. Slide 2: Almonty: The Company and The Market

    THE COMPANY THE MARKET ALMONTY PRODUCTION TARGET 2024 Tungsten producer W 1 Mine in production 1 Mine under construction 30% OF NON-CHINA TUNGSTEN 2 Development projects 1 Past producing mine 7% OF GLOBAL SUPPLY 100% Masterpiece Sangdong 90% TIGHT MARKET & SUPPLY Building the largest mine outside Ch

  3. Slide 3: Capital structure and corporate information

    Issued capital Cash 1 1.50 As of 30 Jun 2022 Ordinary Shares Long-term debt 1.10 CAD 1 Market cap Loans from existing shareholders 1.00 Ore reserves AUD At 0.64 C$ on 16 September 2022 @ avg. grade of 0.36% 0.50 Director, President and Chief Executive Officer 2018 2019 2020 2021 2022 Director, Europ

  4. Slide 4: Almonty's tungsten assets

    3 2 1 4 1 2 3 4 PANASQUEIRA – PORTUGAL SANGDONG – S.KOREA VALTREIXAL – SPAIN LOS SANTOS – SPAIN ACQUIRED: 2016 ACQUIRED: 2015 ACQUIRED: 2013 - 2016 ACQUIRED: 2011 STAGE: PRODUCTION STAGE: CONSTRUCTION STAGE: PRE-FEASIBILITY STAGE: CARE & MAINTANCE P&P: 7,896kt @ 0.45% WO3 P&P: 2,577kt @ 0.35% WO3 Eq

  5. Slide 5: End Markets

    Tungsten Price $350 KOREA — imports 94.7% of all tungsten from China and is the largest per capita consumer worldwide. $300 China & Russia dependency increases market tensions. U.S. Congress in 2018 passed the “National Strategic and $250 Critical Minerals Production Act” (H.R. 520) defining tungste

  6. Slide 6: Sangdong

    A SANGDONG ae ie Sia > ef } z + ro) An : Fe oll : a <q CONSTRUCTION OF ATIER1 PROJECT IN KOREA 6 =—— A ALMoNTY

  7. Slide 7: Sangdong: $75m capex, $72m EBITDA, $110/mtu cost

    $75m $72m Start-Up CapEx Annual EBITDA @1.2m tons & 300$/mtu $110/mtu 90 years Cash cost per ton Potential Mine Life Fully permitted, construction 25% complete, 21 million USD deployed to project development. Tonnage Contained % WO3 (Mt) WO3 (t) Construction with Metso Outotec 7.9Mt 0.45% 35,550 Pas

  8. Slide 8: Management team

    Lewis Black – Director, President and CEO Emil Corfu –Director of Plant Management Over 16 years experience in the tungsten mining industry. 20+ years experience in mine plant construction Former chairman and CEO of Primary Metals. and operation; ex-Metso. Former vice president of the International

  9. Slide 9: Peer comparison of tungsten developers

    Producing Construction/Development Study or Exploration Stage Mt Sangdong Dolphin Hemerdon Mulgine Watershed 1.00% Financing, Status Construction Undeveloped PFS DFS development 0.90% Dolphin 7.9Mt 4.4Mt 63,6Mt Reserves n.a. n.a. 0.80% @ 0.45% @ 0.92% @ 0.19% M.Cap. (AU$m) 155 129 84 77 0.70% 8.3Mt

  10. Slide 10: Global Tungsten Production Cost Curve

    GLOBAL TUNGSTEN PRODUCTION COST CURVE 400 - ALMONTY MINES - CHINESE MINES State-owned, large companies in China - OTHER MINES NOT LOCATED IN CHINA US$205-245/MTU 300 Size of block - % of total tungsten output US$ per MTU 200 ESTIMATED 100 0 NUI PANAS- MITTER- WOLFRAM SANGDONG LOS LA PARILLA CANTUNG

  11. Slide 11: Sangdong Mine

    S N MINE PORTAL Sangdong Mine WTC ONE 541m EIFFEL TOWER 236m UPPER & LOWER HANGING WALL 1 km

  12. Slide 12: Offtake agreement and project financing

    15-year offtake agreement 70% of CAPEX financed through Government guarantee guarantees ~US$580M cashflow senior project finance loan • Global tungsten product major SIZE 75.1 US$m • Long-standing partner of Austrian partners INTEREST 3-M LIBOR/SOFR + 2.5% • Unprecedented floor price guarantee with

  13. Slide 13: Construction of Sangdong commenced in mid 2021

    A KOREA - CONSTRUCTION OF SANGDONG COMMENCED IN MID 2021 Building the largest tungsten mine outside of China wie? MONTY 215 SBE ABA omy A atmonty

  14. Slide 14: Construction in ore

    AA CONSTRUCTION “IN ORE” Mineralization at the surface allows for immediate start of production.

  15. Slide 15: Key milestones ahead

    Key milestones ahead 2022 2023 2024 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 DRAWDOWNS & GRACE PERIOD Development Fund REPAYMENT PLANT CONSTRUCTION COMPLETION Plant & COMMISSIONING Construction 12-MONTH RAMP-UP MINE DEVELOPMENT & EARTHWORK/DRIFT Mining & Mine START MINING ACTIVITIES Development

  16. Slide 16: Panasqueira production and revenue

    Located in Covilha, Portugal Tonnage Historical production since the early 1900s WO3 Grades Current Status - Production Production anticipated to last more than 20 years 10.6Mt 11.9Mt 3.0Mt Forecasted yearly production of ~78,100 MTU WO3, (67,600MTU WO3 and 10,500 MTU 0.21% 0.23% 0.24% Equivalent WO

  17. Slide 17: Reserves and resources by deposit

    Classification Deposit Tonnage (kt) Grade (%) Contained metal (t) Sangdong 7,896 kt 0.47% 37,111 t TOTAL RESERVES Panasqueira 1,951 kt 0.20% 3,928 t (proven and probable) Los Santos 3,582 kt 0.23% 8,325 t Valtreixal 2,549 kt 0.34% 8,667 t Total 15,978 kt 0.36% 58,031 t Sangdong 8,334 kt 0.49% 4,083

  18. Slide 18: Construction of a Tier 1 project in Korea

    | [>] ia Lew “Tae.” Le a) a ef x ' z 4 : i: wl : <q LW) kK < (aq O ay jag O O <4 c= CONSTRUCTION OF ATIER1 PROJECT IN KOREA =—— A ALMoNTY

  19. Slide 19: Combined revenue, EBITDA and production forecast

    Potential cumulated ~US$1.2bn Cash on Hand*: by 2050 Sangdong Extension Case ~US$300m Revenues EBITDA Capex Free Cash Flow (After Tax & Debt Service) Cash on Hand Almonty Combined* by 2030 2021 F 2022 F 2023 F 2024 F 2025 F 2026 F 2027 F 2028 F 2029 F 2030 F 200 150 US$m 100 50 0 -50 30+ YEARS ANNUA

  20. Slide 20: World class mine secured

    WORLD Representing 30% of all tungsten outside of China and 7-10% of global supply at High grade & leading resource size CLASS MINE 90-year mine life with resources of 52Mt at ~0.44-0.49% WO3 US$75m with Germany’s state bank KfW signed, guaranteed by Austrian bank OeKB SECURED Secured 15 years Floor

  21. Slide 21: Contact

    INVESTOR PRESENTATION PREPARED BY ALMONTY INDUSTRIES INC. PRESIDENT & CEO: LEWIS BLACK ALMONTY e3°e ADDRESS CONTACT US. fe) © 100 KING ST W +1 (647) 438 9766 ONTARIO, M5X 1A9. INFO@ALMONTY.COM CANADA 21

  22. Slide 22: Appendix

    APPENDIX

  23. Slide 23: Director Experience

    Director Experience • Currently a Partner of Almonty Partners LLC, a privately-held company specialising in tungsten mining investments and has over 16 years of experience in the tungsten mining industry. Lewis Black (Executive Director, • Formerly Chairman and CEO of Primary Metals Inc. (PMI), a fo

  24. Slide 24: South Korea and key demand directions

    SOUTH KOREA AND KEY DEMAND DIRECTIONS South Korea is the largest per capita consumer of tungsten worldwide, however, imports 94.7% of tungsten used, 92.8% of Tungsten oxide from China South Korea consumes ~40% of Tungsten Hexafluoride (WF6), which is used in the semiconductor production. South Korea

  25. Slide 25: Almonty Korea Moly Project

    Almonty Korea Moly Project Almonty Korea Moly (AKM) Project with its large molybdenite-quartz vein stockwork is located on Sangdong’s existing fully permitted, mining lease, about 190km southeast of Seoul Significant maiden molybdenum resource defined 150m adjacent to tungsten orebody at Sangdong Mi

  26. Slide 26: Equatorial principles and beyond

    Equatorial principles and beyond. Assessment of environmental and social risks of major projects based on 10 principles, 1 including regular monitoring by independent third parties and intensive dialogues with the local population and their organizations. Almonty has agreed to develop the Sangdong m

  27. Slide 27: Tungsten applications

    X-ray beam Inserts for aircraft 5G network infrastructure Automotive market 74 4f145d46s2 W Tungsten 183.84 Defense Ballistic equipment Semiconductors Source: Living Metals Nr. 17 - 2019, The Plansee Group 2019

  28. Slide 28: Tungsten uses by weight

    Plate for stone hammer drill Saw teeth for blades of a circular saw 65g 400g Casing for luxury watch Film projector lamp 35g 750g 74 4f145d46s2 Pins for doorlock 12g W Tungsten 183.84 Crushers & mills 25-80kg Heating wires for car window 5g Vibration alarm unit in smartphones Irradiation equipment 0

  29. Slide 29: Nano Tungsten Oxide

    Nano Tungsten Oxide Korea – location of the Sangdong mine - imports 94.7% of all The material to supply the battery anode & cathode tungsten and is the largest per capita consumer worldwide. manufacturing industry. Declared “critical raw material” as a result of high supply-risk The raw material to

Almonty Industries — Investor Presentation (September 2022) on 6ix