British Land Company Plc · LSE:BLND

British Land — Investor Presentation (2022)

51 slides from British Land's investor presentation, 2022

  1. Slide 1: Canada Water

    CANADAANATER

  2. Slide 2: Agenda

    Overview Simon Carter, CEO Introduction to Canada Water Emma Cariaga, Joint Head of Canada Water & Head of Residential Phase 1 Agenda Roger Madelin, Joint Head of Canada Water Strategic Programme Phil Tait, Director of Development Sustainability Hannah Farahar, Project Director Indicative Financial

  3. Slide 3: Driving returns on our campuses

    Driving returns on our campuses Regent’s Place Broadgate Paddington Central Canada Water • Targeting innovation sectors • Delivering value accretive developments

  4. Slide 4: London campus development pipeline

    London campus development pipeline Committed developments 10% IRR 12% IRR 11% IRR 11% IRR 1 Broadgate Norton Folgate Aldgate Place Canada Water Phase 1 Near & medium term – targeting low teen IRRs 5 Kingdom Street 2 & 3 Finsbury Avenue Euston Tower Canada Water Masterplan c.8m sq ft of pipeline oppo

  5. Slide 5: Slide 5

  6. Slide 6: Future Canada Water

    Canada Plot F1 Water Future residential tower

  7. Slide 7: Masterplan Headlines

    Plot F1 residential tower Masterplan Headlines • 10 year scheme • 53 acres • Up to 3,000 homes (25% social rent, 10% intermediate homes) • 2.5m sqft workspace • 1.0m sqft retail, leisure, education, culture • 12 acres of parks, squares and open spaces

  8. Slide 8: The Dock bridge

    The The bridge Dock (or boardwalk, or crossing)

  9. Slide 9: The Dock bridge

    The TheThe bridge Dock Dock (or boardwalk, or crossing) • SINC status – works will improve ecological and biodiversity values • New 150m long bridge

  10. Slide 10: The Dock

    The Dock • New dipping pond

  11. Slide 11: New 3.5 acre park

    | See ee iyi te a e! rh Ne N : . *. 3.5-acre park i ee a

  12. Slide 12: Phase 1

    Phase L *

  13. Slide 13: Phase 1 well and truly underway

    Phase 1 well and truly underway Over £350m of works on site and committed Phase 1 completes in summer 2024

  14. Slide 14: Plots A1 & A2

    Plots A1 & A2

  15. Slide 15: Plot A1

    Plot A1 • 118,000 sqft workspace • 10,000 sqft of eating, drinking, shopping • 35 storey resi tower with 186 homes • Designed by Allies & Morrison • Completes summer 2024 Embodied Carbon Operational Energy* Office 600 kgCO2/m2 Base Build: 80 kWh/m2 Resi 682 kgCO2/m2 76 kWh/m2 * target

  16. Slide 16: Plot A1

    AaUAS SUS MURaNy aM MEME (NOGLTy Wieayi UL NED Ma igi Wize Wiel WeaNNe WON 8 |

  17. Slide 17: . os os a im g me |

    . os os a im g me | fi rine i EERE ABBE BBGE GF FR" SERA HBG i:

  18. Slide 18: Plot A2

    Plot A2 • 182,000 sqft workspace • 10,000 sqft of eating, drinking, shopping • New 55,000 sqft leisure centre • Designed by Allies & Morrison • Completes summer 2024 Embodied Carbon Operational Energy* Office 666 kgCO2/m2 Base Build: 80 kWh/m2 * target

  19. Slide 19: Terraces on every floor look over the dock

    Terraces on every floor look over the dock

  20. Slide 20: New Southwark Fitness Centre

    New Southwark Fitness Centre

  21. Slide 21: LB Southwark's new Fitness Centre

    LB Southwark’s new Fitness Centre £35m investment by Southwark Council

  22. Slide 22: Plot K1

    Plot K1 • 79 affordable homes • Designed by Morris + Co. • Forward purchased by Southwark Council for £18m • Completes summer 2023 Embodied Carbon Operational Energy 722 kgCO2/m2 76 kWh/m2

  23. Slide 23: Plot K1

    Plot ghee Eel ead Tiedt E | aul. Lites

  24. Slide 24: The New Paper Garden: a circular economy building

    The New Paper Garden: a circular economy building – and the largest Cordwood construction in the UK.

  25. Slide 25: TEDI-London new higher education provider

    TEDI-London is a new higher education provider for future engineers, bridging engineering across many disciplines, including mechanical, electrical and electronic, civil, environmental and product design – founded by Arizona State University, King’s College London and UNSW Sydney. The first 10,000 s

  26. Slide 26: The Paper Yard

    The Paper Yard • 75,000 sqft of modular space across four buildings • Suitable for office use, dry and wet labs • 10,000 sq ft let to TEDI-London, delivered within 9 months

  27. Slide 27: Indicative Programme

    Indicative Programme

  28. Slide 28: Indicative Programme & Phases

    Indicative 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Programme A1 & Phases A2 K1 1 Substation Design & Build UKPN's Works 2 Printworks Demolition Zone L Printworks The Park Leisure Park Demolition F2 3 H3/4 G1 Tesco Tesco Demolition G1 Residential F1 4 E1 E2 SQSC North Demolition D

  29. Slide 29: Canada Water Phase 1

    Canada Water Phase 1 t Q3 2021 Q3 2024 Phase 1 commences Phase 1 Complete Paper Yard Opens

  30. Slide 30: Phase 1

    NUETEUTTOPTERTE UTTER ACN INOIINN

  31. Slide 31: Canada Water Phase 2

    Canada Water Phase 2 t Q3 2021 Q3 2024 Q3 2025 Q4 2026 Phase 1 commences Phase 1 Complete Printworks Complete Phase 2 Complete Paper Yard Opens Park Opens

  32. Slide 32: The Printworks

    N ls iB Dpban a He al. &

  33. Slide 33: Zone F, Plot F2

    Zone F, Plot F2

  34. Slide 34: Canada Water Phase 3

    Canada Water Phase 3 Q3 2021 Q3 2024 Q3 2025 Q4 2026 Q2 2027 Phase 1 commences Phase 1 Complete Printworks Complete Phase 2 Complete Phase 3 Complete Paper Yard Opens Park Opens Tesco Relocate

  35. Slide 35: Artist's impression of Plot H3-4

    Artist’s impression of Plot H3-4

  36. Slide 36: Innovation at Canada Water

    Innovation at Canada Water Potential for up to 1m sq ft of life sciences space across several plots at Canada Water, including a new modular campus 1m sq ft of life sciences opportunities across the Examples of life sciences opportunities Masterplan 1 Lab-enabled buildings • 300k sq ft building desi

  37. Slide 37: Canada Water Phase 4

    Q4 2026 Q2 2027 Q4 2028 Phase 4 Complete Q3 2021 Q3 2024 Q3 2025 Phase 1 commences Phase 1 Complete Printworks Complete Phase 2 Complete Phase 3 Complete Park Opens Town Sqaure Opens Paper Yard Opens Tesco Relocate

  38. Slide 38: Canada Water Phase 5

    Canada Water Phase 5 Q3 2021 Q3 2024 Q3 2025 Q4 2026 Q2 2027 Q4 2028 Q3 2030 Phase 1 commences Phase 1 Complete Printworks Complete Phase 2 Complete Phase 3 Complete Phase 4 Complete Phase 5 Complete Paper Yard Opens Park Opens Town Sqaure Opens Tesco Relocate

  39. Slide 39: Sustainability Ambitions

    Sustainability Ambitions

  40. Slide 40: Sustainability Ambitions

    Sustainability Ambitions Bolder innovations, deeper partnerships, higher standards ‘Sustainability-first’ thinking integrated into everything we do and every decision we make, at every stage of the development.

  41. Slide 41: Low Carbon Energy Strategy

    • British Land procures 100% renewable energy • All-electric energy approach with low temperature (ambient) heat networks • BRE Applied Innovation Credit for industry first - re-use of office waste heat to heat residential homes. Now implemented across the masterplan. Low • First use of cement-free,

  42. Slide 42: Circular Economy Principles

    Circular Economy Principles From the adaptive re-use of the old Printworks to component-led, flexible design; circular economy principles are baked into the British Land design briefs from day 1.

  43. Slide 43: Higher standards

    Higher • Largest cluster of BREEAM Outstanding buildings in the UK • BREEAM Outstanding • BREEAM Communities standards • Home Quality Mark 3 • Largest cluster of NABERS rated offices in the UK • Energy rating tool for building services • All Canada Water buildings registered under NABERS • Some of t

  44. Slide 44: Indicative financial model & assumptions

    Indicative financial model & assumptions

  45. Slide 45: Progressing JV partnership

    Progressing JV partnership British Land is well progressed in discussions with a partner who shares our vision for Canada Water. Current expectation is for a 50:50 joint venture. A partnership would combine funding from a leading international investor with our best in class operational platform. Ra

  46. Slide 46: Whole project development costs

    Whole project development costs Total development cost of c.£3.6bn1 (including cost inflation, excluding land and interest) Development costs 1,400 1,200 1,000 800 600 400 200 - Phase 1 Phase 2 Phase 3 Phase 4 Phase 5 Plot and Other Development Costs Infrastructure Development Costs Total developmen

  47. Slide 47: Key assumptions

    Key assumptions Commercial Rent - current day Growth p.a. Floor Area Yield at completion (psf) Market / Regeneration1 (NIA sq ft) Offices £47.50 - £52.50 2% / <2.5% 4.75% - 5.00% 2.5m Retail & leisure £16.00 - £35.00 2% / <3% 4.75% - 5.25% 0.5m Residential Values - current day Growth p.a. Floor Area

  48. Slide 48: Comparable offices rents & residential values

    Comparable offices rents & residential values Current average offices rents, £psf Current average residential capital value, £psf Kings Cross 85 Kings Cross 2,000 Shoreditch 70 Shoreditch 1,400 White City 60 White City 1,300 Nine Elms 56 Nine Elms 1,300 Wood Wharf 52 Wood Wharf 1,200 Canada Water 52

  49. Slide 49: Indicative phasing plan & net development value

    Indicative phasing plan & net development value Whole project NDV of ERV of NDV of Calendar Year 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 commercial1 commercial2 residential1 Quarter 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 £bn £m £bn Phase 1 0.3 16 0.

  50. Slide 50: Value creation

    Value creation 11% forecast IRR for Phase 1 and low teens for total project (ungeared) In any JV scenario, value created would be apportioned on a pro rata basis. British Land would be the asset and development manager for which we would earn fees

  51. Slide 51: Thank You

    Thank You