  1. Slide 1: Conowingo/Muddy Run Shoreline Management Plan (SMP) Consultation Presentation

    Conowingo/Muddy Run Shoreline Management Plan (SMP) Consultation Presentation June 28-29, 2011

  2. Slide 2: Licensee's Goals and Objectives

    Licensee’s Goals and Objectives  Produce a interim SMP; a comprehensive plan for Exelon to manage multiple resources and uses of the project’s shoreline.  Consult with stakeholders to produce an SMP that addresses:  Public access  Resource protection  Project operations  Consistency with Other

  3. Slide 3: FERC Expectations for SMP

    FERC Expectations for SMP  Ensure shoreline development and activities within Project boundary are consistent with overall license requirements, purposes and operations;  Examine how Project contributes to the character of the area and attempt to strike balance between hydropower development, reso

  4. Slide 4: Activities to date by Exelon

    Activities to date by Exelon  Identify issues to be addressed in SMP  Research and assess existing information that is available and pertinent to the SMP  Regional plans and programs  Develop existing land use classifications  Project public recreation sites and access  Related licensing studi

  5. Slide 5: Information Gathered

    Information Gathered Local, State and Federal programs and policies related to environmental, recreation, and land use planning Includes: comprehensive plans, Statewide Comprehensive Outdoor Recreation Plan (SCORP), and information regarding trails, open space and greenways, natural areas and land

  6. Slide 6: Existing Land Use Identification and Mapping

    Existing Land Use Identification and Mapping  Classify existing land uses in Project boundary from aerial photos:  Project operations lands  Developed recreation lands  Industrial/commercial lands  Residential lands  Sensitive resource lands  Forest management/undeveloped lands  Agricultural

  7. Slide 7: Existing Land Use Identification and Mapping

    Existing Land Use Identification and Mapping  Cottage lands  Public access lands Ground truth proposed classifications Conowingo/Muddy Run Shoreline Management Plan June 28-29, 2011

  8. Slide 8: Recreation Inventory and Mapping

    Recreation Inventory and Mapping Project recreation facilities, including those leased/managed by others Commercial facilities Trails State parks Local parks Preserves/conserved lands Conowingo/Muddy Run Shoreline Management Plan June 28-29, 2011

  9. Slide 9: Project Related Studies and Information

    Project Related Studies and Information Wildlife and plant habitat Rare, threatened, and endangered species Wetlands Archaeological/cultural/historical sites Aquatic vegetation Steep slopes Conowingo/Muddy Run Shoreline Management Plan June 28-29, 2011

  10. Slide 10: Preliminary Land Use Constraints Maps

    Preliminary Land Use Constraints Maps Project operation lands Other infrastructure (utility/transportation) Cumulative sensitive areas (land and water) Topographic limitations Conowingo/Muddy Run Shoreline Management Plan June 28-29, 2011

  11. Slide 11: SMP Milestones

    SMP Milestones  Interim SMP filed with FERC as part of ILP Initial Study Report 2-22-11  Initial Study Report consultation meeting 3-18-11  SMP consultation meetings 6-28/29-11  Written comments due 7-27-11  Draft SMP circulated for comments  Proposed SMP included with draft license applicatio

  12. Slide 12: June 28/29 SMP Meetings

    June 28/29 SMP Meetings Four displays/work stations  Shoreline development Utility infrastructure, railroad, pipelines, etc.  Shoreline access Trails, roads, public recreation facilities, etc.  Shoreline protection Wetlands, habitat, historic, steep slopes, etc.  Shoreline cottages Cottage