Slide 3: Solid 1Q Delivery
Solid 1Q Delivery Expected 2H23+ free cash flow inflection point approaching Production Free Cash Flow inflection Production ~59,000 boepd point expected in 3Q23 In line with guidance Driven by the planned ramp up of Jubilee Jubilee Southeast Tortue Phase 1 Winterfell Developments Targeting first Ta
Slide 4: Operations On Track
Operations On Track 1Q net production of ~59,000 boepd Ghana Equatorial Guinea Gulf of Mexico 1Q net production 1Q net production 1Q net production ~33,600 boepd ~9,300 bopd ~15,900 boepd Jubilee Ceiba & Okume Kodiak • Gross oil production averaged ~72,200 • Gross oil production averaged ~27,200 • W
Slide 5: Jubilee Growth
Jubilee Growth Gross production >110,000 bopd expected in 4Q23 Jubilee Growth Forecast Jubilee Production (bopd) Facility Oil 120,000 Limit 100,000 80,000 60,000 Jubilee main field growth • Two producer wells, one water injector well – Producer expected online mid-2Q – Second producer + injector exp
Slide 6: Mauritania & Senegal: Tortue Phase 1
Mauritania & Senegal: Tortue Phase 1 Progress across all key workstreams 1 2 3 4 1 Subsea/Wells 2 FPSO 4 Floating LNG 3 Hub Terminal • Four wells drilled and completed • Amazon vessel currently laying deep-water pipeline, to be followed by the installation of • Pre-commissioning work the infield flo
Slide 7: Future Gas/LNG Growth
Future Gas/LNG Growth Deep hopper of future gas and LNG opportunities with ~15 Tcf of discovered resource net to Kosmos Tortue Phase 2 Significant Gas Resource In-Place De-Risked Across 3 Hubs • Phase 2 gravity-based structure (GBS) development concept approved by the partnership – Projected 2.5-3.0
Slide 8: 1Q 2023 Financials
1Q 2023 Financials In line with guidance and flat vs. 4Q 2022 4Q 2022A 1Q 2023A Net Production ~58,700 boe/day ~58,800 boe/day Realized Price1 ~$75.6/boe ~$70.9/boe Opex ~$20.2/boe ~$15.3/boe DD&A ~$17.8/boe ~$19.9/boe G&A2 $26 million $29 million Exploration Expense3 $12 million $11 million Net Int
Slide 9: Key 2023 Milestones – On Track
Key 2023 Milestones – On Track Multiple catalysts expected across all areas of the portfolio 9
Slide 10: KOSM:*S
KOSM:*S ENERGY.
Slide 11: Appendix: FY23 Detailed Guidance
Appendix: FY23 Detailed Guidance 2Q 2023 FY 2023 Production1,2 57,000 – 61,000 boe/day 65,000 – 69,000 boe/day Opex3 $14.50 – $16.50/boe $13.50 – $15.50/boe DD&A $20.00 – $22.00/boe $19.00 – $21.00/boe G&A (~60% cash) $28 – $30 million $110 – $120 million Exploration Expense4 ~$10 million ~$40 milli